Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on July 10, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

B1118 SAPR Office Wall & Door

Closed
FA480325R0024Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Federal
Z1DA-- 460-26-004 | Wilmington VAMC Roof Replacement | NCO 4 Construction East (VA-26-00029152)
Solicitation # 36C24426B0015
Solicitation 36C24426B0015 is a firm-fixed price construction contract issued by the Department of Veterans Affairs Network Contracting Office 4 for the removal and replacement of Roof 3D, the Physical Therapy Roof, Roof 10, and Roof 11 at the Wilmington VA Healthcare System in Delaware. The project has an estimated magnitude between $250,000 and $500,000 and is set aside 100% for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The scope of work includes demolition of existing roofing and insulation, installation of 60 Mil Elevate RubberGard EPDM LS-FR white low-slope fire retardant roofing material or equivalent, and the repair of roof drains. The completed installation must meet high wind zone design requirements and include a minimum 20-year warranty against leaks. Award will be granted to the responsive and responsible bidder offering the lowest price. Eligible bidders must be registered in SAM, VETCERT, and the VETS-4212 database. The contractor is required to provide performance and payment bonds and adhere to Davis-Bacon Act Wage Determination DE20260008. Strict safety standards are mandated, including the presence of an OSHA-certified competent person on-site and 10-hour OSHA certification for all employees. Performance must begin within 10 calendar days of award and be completed within 30 calendar days, with work performed Monday through Friday from 7:00 AM to 5:00 PM. Following multiple amendments, the final bid opening was rescheduled for October 21, 2026.
244-NETWORK Contract Office 4 (36C244)

POSTED

about 2 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation, with a response deadline of November 4, 2026. The project falls under NAICS code 236220 and focuses on basin improvements within the Riverside or Los Angeles project areas. A critical component of this solicitation is strict adherence to six Good Faith Effort (GFE) requirements designed to ensure DBE participation and secure project financing. Bidders must provide proof of GFE #2, which requires posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for one day, as well as proof of GFE #5, involving the utilization of the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to submit documentation for these two specific efforts within the bid package will result in the proposal being deemed non-responsive. Additionally, outreach documentation for GFE #1 may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 8 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 8 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located on the northeast end of Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation involving soil stabilization and utility relocation; construction of the plant including a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic system for invoicing and payments and are required to accept the standard Overaa agreement without modification. Key milestones include a mandatory pre-bid meeting on October 5, 2026, with bid submission deadlines listed as either October 28 or November 10, 2026.
C. Overaa & Co.

POSTED

about 8 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

This contract pertains to a small-scale construction project at Shaw Air Force Base, specifically focusing on the installation of walls and doors for the SAPR Office. The project is set to be completed within a period not exceeding 30 days following the issuance of the Notice to Proceed. It is a competitive small business set-aside under NAICS code 236220, with the total construction magnitude estimated to be less than $25,000. The solicitation emphasizes the contractor's responsibility to provide all necessary management, tools, supplies, equipment, labor, licenses, and permits to fulfill the project requirements, which must adhere strictly to the attached Statement of Work and relevant codes, including UFC, UFGS, IBC, IPC, NEC, NFPA, and other applicable standards. A site visit is scheduled for June 2, 2025, and access requests must be coordinated in advance with designated points of contact, Ms. Zelda Williams and Ms. Kishauna Goodman, by May 30, 2025. The deadline for submitting questions or clarifications is June 9, 2025. Proposals are due by June 26, 2025, at 2:00 PM EST, and all correspondence should be directed via email to the designated Contract Specialist and Contracting Officer. The contract aims to ensure compliance with all applicable federal, state, and local standards, and the project location is Shaw AFB in South Carolina.

General Info

Small business contract for SAPR office wall and door construction at Shaw AFB under $25,000.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Shaw AFB, SC, 29152, USA

Set-Aside

SBA

Documents

13

Amendment FA480325R00240001

PDF, High priority: read this first2 pages · amendment
High

B1118 2nd Floor Drawings

PDF, High priority: read this firstspecifications
High

Bid Schedule - SAPR Office Wall & Door (VLSB 25-2503)

PDF, High priority: read this first1 page · bid-schedule
High

SAPR Office B1118 Statement of Work (VLSB 25-2503)

PDF, High priority: read this first3 pages · sow
High

SAPR Office Wall and Door Price Breakdown (VLSB-25-2503)

XLSX, High priority: read this first1 page · bid-schedule
High

Solicitation Amendment FA480325R00240002

PDF, High priority: read this first2 pages · amendment
High

Solicitation Amendment FA480325R00240003

PDF, High priority: read this first3 pages · amendment
High

Solicitation Amendment FA480325R00240004

PDF, High priority: read this first2 pages · amendment
High

Solicitation FA480325R0024 - SAPR Privacy Wall and Glass Door Install

PDF, High priority: read this first33 pages · rfp
High

SOW - SAPR Office B1118 Wall Installation (VLSB 25-2503)

PDF, High priority: read this first3 pages · sow
High

Wage Determination SC20250030 - Sumter County, South Carolina

PDF, High priority: read this firstwage-determination
High

Questions_Answers+VLSB+25-2503.pdf

PDF, Low priority2 pages · q-and-a
Low

SAPR Office Photos

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

4 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Deadline changed

Response deadline changed from Jun 26, 2025 to Jul 11, 2025.

Notice updated

Response deadline changed from Jul 11, 2025 to Jul 17, 2025. The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4803 20 Cons Lgca
Contacts2 people available
OfficeSHAW AFB, SC, 29152-5125, USA
Office AddressSHAW AFB, SC, 29152-5125, USA

Full Description

Show more
Project Title: B1118 SAPR Office Wall & Door Project Location: Shaw AFB Period of Performance: Not to Exceed 30 days after issuance of Notice to Proceed. Competition: This is a Competitive Small Business set aside acquisition for NAICS 236220. Magnitude of Construction is less than $25,000.00 Site Visit is scheduled for Tuesday, 1 July 2025 at 9:00 AM on Shaw AFB at 504 Shaw Drive, Building 1118, 2nd floor at Shaw Air Force Base. For Base Access requests contact the Contracting Officer, Ms. Zelda Williams at moore.williams.1@us.af.mil, Contract Specialist, Kishauna Goodman at kishauna.goodman@us.af.mil, and Contract Specialist SSgt Margret Ogbuozobe at margret.ogbuozobe@us.af.mil NLT Thursday, 26 June 2025 at 2:00 PM EST. Base access will not be permitted without prior coordination. Questions or request for Clarifications shall be submitted in writing to the Contracting Officer NLT Monday, 7 July 2025. Time Zone: All times are Eastern Standard Time (EST) POC: Contract Specialist, Kishauna Goodman at kishauna.goodman@us.af.mil Contracting Specialist, SSgt Margret Ogbuozobe at margret.ogbuozboe@us.af.mil Contracting Officer, Zelda Williams at moore.williams.1@us.af.mil All correspondence shall be emailed to the Contract Specialist and Contracting Officer Proposals are due by Thursday, 17 July 2025 at 2:00 P.M. and must be addressed to: 20 CONS/PKB CO/CS NAME" The contractor shall provide all management, tools, supplies, equipment, labor, and applicable licenses and permits necessary to complete the requirements within. All work shall be done in strict accordance with the attached Statement of Work and subject to the terms and conditions of the contract and in accordance with (UFC) Unified Facilities Criteria, Unified Facilities Guide Specifications (UFGS), the International Building Code (IBC), International plumbing code (IPC), South Carolina Department of Health and Environmental Control (SCDHEC), National Electrical Code (NEC), National Electrical Safety Code (NESC), National Fire Protection Association (NFPA), EPA 402-K-01-001 (2008), South Carolina Department of Transportation (SCDOT), South Carolina Department of Health and Environmental Control (SCDHEC) Shaw Air Force Base Design and Construction Standards, Change 2, 21 Aug 2018 and all other applicable codes. REMINDER: Contractors must acknowledge all amendments when submitting a proposal.

More opportunities from Department Of Defense → FA4803 20 Cons Lgca

Same awarding agency

NAICS: 236220
Federal
FY27 MACC
Solicitation # FA480326B0006
The FY27 MACC is a competitive total small business set-aside, design-build, Indefinite-Delivery/Indefinite-Quantity (IDIQ) construction contract. This seven-year acquisition, with a total aggregate maximum value of 175 million dollars, provides a vehicle for a broad range of construction services, including the repair, replacement, and new installation of systems and components. Performance is centered at Shaw Air Force Base, the Poinsett Weapons Range, and the Wateree Recreation Facility, as well as other remote sites, excluding military family housing. The government intends to award seven IDIQ contracts, with offerors ranked from low to high based on a seed project involving the repair of Building 1816. To be considered responsive, offerors must be registered in SAM, provide a financial information request, and submit notarized bonding information demonstrating a minimum capacity of 7.5 million dollars per project and 40 million dollars aggregate. Bids must be submitted through the PIEE Solicitation module in three separate volumes, including detailed pricing on government-provided sheets. Task orders will be issued as firm-fixed-price contracts, and awarded contractors must maintain an effective quality control system complying with FAR 52.246-12. All work must adhere to Unified Facilities Criteria (UFC) and Shaw Air Force Base design and construction standards, with strict compliance required for base access, security protocols, and environmental regulations.
Commercial and Institutional Building Construction

POSTED

7 days ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS