Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on June 5, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

B158 Repair LRS Warehouse Offices, Add Restrooms

Closed
FA302225R0004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific performance area in Riverside or Los Angeles, focuses on basin improvements under NAICS code 236220. The solicitation was posted on October 19, 2026, with a response deadline of November 4, 2026. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation. To secure project financing, the Inland Empire Utilities Agency requires strict adherence to expanded DBE Good Faith Effort (GFE) guidelines. Bidders must provide proof of utilizing SBA and MBDA services and demonstrate that solicitations were posted in an online publication for 30 consecutive days and in a newspaper for at least one day prior to the bid opening. Failure to include this documentation within the bid package will result in the proposal being deemed non-responsive. While outreach documentation may be submitted up to three business days after the closing date, all other mandatory GFE requirements must be met by the opening date to ensure compliance.
RT CONTRACTOR CORP

POSTED

about 14 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 14 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located on the northeast end of Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation involving soil stabilization and utility relocation; construction of the plant including a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic system for invoicing and payments and are required to accept the standard Overaa agreement without modification. Key milestones include a mandatory pre-bid meeting on October 5, 2026, with bid submission deadlines listed as either October 28 or November 10, 2026.
C. Overaa & Co.

POSTED

about 14 hours ago

DEADLINE

in 21 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes comprehensive site work such as clearing, rock excavation, grading, and wetland mitigation, as well as the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building. Demolition of 18 existing magazines and buildings 524 and 393 is also required. Technical requirements encompass a wide range of trades including demolition, abatement, concrete, structural steel, roofing, electrical, plumbing, and mechanical systems. Specialized construction features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. The project also involves installing primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact the primary point of contact by the October 31, 2026, deadline to receive bid documents.
J & J Contractors, Inc

POSTED

about 14 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

The contract solicits bids for the renovation and repair of Building 158 at Columbus Air Force Base, Mississippi. The scope includes renovating the breakroom and attached office, demolishing existing warehouse offices, constructing new warehouse office spaces, a breakroom, a bathroom, and replacing a roll-up door. Contractors are responsible for providing all necessary labor, equipment, materials, and tools to fulfill these requirements according to the detailed Statement of Work. The procurement is set aside for total small business participation, with an estimated value between $500,000 and $1,000,000. Recent amendments have clarified guidelines and deliverables, including attachment of a revised SOW addressing accommodations for displaced employees, updates to the RFI process, extending the solicitation due date to June 17, 2025, and inclusion of a required cost breakdown. A site visit is scheduled for May 13, 2025, and prospective contractors must submit attendee information in advance to participate. Access to sensitive project documents requires completion of CUI training and submission of acknowledgement forms. All proposals must be submitted electronically. The primary points of contact for the solicitation are TSgt Ranie Boukzam and Daniel Stilts.

General Info

Renovate Building 158 at Columbus AFB: breakroom, offices, bathroom, roll-up door replacement, small business set-aside.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Columbus, MS, 39710, USA

Set-Aside

SBA

Documents

10

Appendix A - Columbus Air Force Base Construction Price Proposal Breakdown

XLSX, High priority: read this first6 pages · rfp
High

CAFB Electrical Standards - Basic Electrical Materials and Methods

PDF, High priority: read this first7 pages · specifications
High

CAFB Mechanical Standards

PDF, High priority: read this first9 pages · specifications
High

EEPZ239812 Design-Build SOW: Repair LRS Warehouse Offices, Add Restroom, B158

PDF, High priority: read this first42 pages · sow
High

FA302225R00040001 Amendment 01

PDF, High priority: read this first2 pages · amendment
High

FA302225R0004 B158 Repair LRS Warehouse Offices and Add Restrooms

PDF, High priority: read this first44 pages · solicitation
High

MS20250045 Wage Determination - Mississippi Building Construction

PDF, High priority: read this first7 pages · wage-determination
High

UFC 3575 01 Special Construction Fire Protection Requirements

PDF, High priority: read this first3 pages · specifications
High

EEPZ239812 Submittal Register - Repair LRS Warehouse Offices, B158

XLSX, Low priority12 pages · other
Low

FA302225R0004 RFI Answers - B158 Repair LRS Warehouse Add Restrooms

PDF, Low priority1 page · q-and-a
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

6 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from May 29, 2025 to Jun 17, 2025. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA3022 14 Cons Lgca
Contacts2 people available
OfficeCOLUMBUS, MS, 39710-0001, USA
Office AddressCOLUMBUS, MS, 39710-0001, USA

Full Description

Show more
AMENDMENT 4 FA302225R00040004: Added attachment "Design Build SOW Repair LRS Warehouse Offices Add Restroom B158 REVISED 5 June 2025" which adds clairifcation to section 2.24 of the SOW regarding workspace of displaced employees. _________________________________________________________________________ AMENDMENT 3 FA302225R00040003: Updated attachements to include list of RFI's asked and answered. _________________________________________________________________________ AMENDMENT 2 FA302225R00040002: Change solicitation due date from 29May2025 to 17June2025. RFI questions are still being answered and will be posted once reviewed. _________________________________________________________________________ AMENDMENT 1 FA302225R00040001: Added attachment "Cost Breakdown" _________________________________________________________________________ The Contractor must provide all plant, labor, equipment, transportation, and tools required to complete the renovation of the breakroom and attached office, the demolition of existing warehouse offices, the construction of new warehouse office, breakroom, and bathroom, and the replacement of roll up door. See Statement of Work for more information. Site Visit: The Government is offering a site visit opportunity on 13 May 2025 at 1:00 PM CDT. The site visit is Highly Encouraged but not mandatory. To attend the site visit, your team must fill out the information on the bottom half of the EAL form attached to the POC to inform them of your intent to attend NLT 1:00 PM CDT on 9 May 2025. If you do not submit the EAL form to the POC by 1:00 PM CDT on 9 May 2025, you will not be able to attend the site visit. EAL's must contain the attendees Full name, driver's license number/state of issue, SSN, and date of birth. Ensure attendees bring a valid ID. If driving, driver must possess a valid driver's license, the vehicle's registration and proof of insurance. Those attending the site visit should arrive early at Security Force's Visitors Center to allow time to process their base passes. An escort will meet contractors at the Visitors Center and guide them to the site visit location. Additional Info: All RFIs must be submitted NLT 12:00 PM CDT, on 16 May 2025. IAW FAR 36.204(e) - The range of magnitude for this procurement is between $500,000 and $1,000,000. NOTE: Contractors/Offers must complete CUI Training Slides then sign and return the "MFR Contractor CUI Training Acknowledgment for Solicitations" to gain access to drawings and other associated CUI documentation. Once you have sent your singed MFR to the POC, request access to locked documents through SAM.gov. Once your MFR has been received and reviewed, accesses to locked SAM.gov documents will be granted. Proposals will be submitted electronically.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS