Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Bristol - North Carolina was posted on September 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

B159 Provide Overhead Protection from Spalling Concrete

Closed
873495State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238190
New
Federal
WWYK260004 - REPAIR STRUCTURAL INTEGRITY, B1134, POST 34 & NORTH WALL
Solicitation # FA813727R0001
Solicitation FA813727R0001 is a firm fixed price request for proposal for the repair of structural integrity at Building 1134, Post 34, and the North Wall at Tinker Air Force Base, Oklahoma. The project scope involves repairing or replacing eroded shear braces and the base of Post 34 to prevent potential failure. This opportunity is restricted exclusively to Tinker AFB MAC BOA holders, and attendance at the initial site visit on October 22, 2026, is mandatory for eligibility to propose. Interested prime contractors must RSVP by October 20, 2026, and provide an Entry Access List for any personnel requiring base access. The estimated magnitude of the construction is between $100,000 and $250,000, with a performance period of 195 calendar days from the notice to proceed. The acquisition will be awarded based on the Lowest Price Technically Acceptable (LPTA) process, where the award goes to the responsible offeror with a technically acceptable proposal and the lowest evaluated price. Technical evaluations will focus on capability and management, and any deficiency in a subfactor will render a proposal un-awardable. Proposals must be submitted in separate technical and price volumes, with pricing broken down by the CSI Master Format System. The contract is a total small business set-aside and is subject to the Davis-Bacon Act, Buy American Construction Materials requirements, and DFARS cybersecurity standards. Liquidated damages for delays are set at $227.75 per calendar day.
FA8137 Afsc Pzioc

POSTED

1 day ago

DEADLINE

in about 1 month
NAICS: 238190
New
SLED
YAC Awning Replacement
Solicitation # 262904MKM
Sarasota County is soliciting bids for the complete replacement of an awning at the Youth Athletic Complex Baseball Field Office Building located at 2810 17th St., Sarasota, Florida, following damage from Hurricane Milton. The project involves the removal of damaged components and the fabrication and installation of a new aluminum canopy system approximately 66 feet wide by 14 feet 6 inches in projection. The contractor must provide all labor, materials, and engineering coordination, ensuring the structure meets current Florida Building Code wind load requirements and utilizes corrosion-resistant hardware suitable for coastal conditions. The successful offeror will be the responsive and responsible bidder providing the lowest total price, with a project completion deadline of 90 days after receipt of the purchase order. Qualified bidders must hold a Certified Specialty Structure, General, or Building Contractor license and provide at least two verifiable references from the last seven years. Due to grant funding requirements, local and American business preferences do not apply to this award. The contract includes strict compliance with federal regulations, including the Byrd Anti-Lobbying Amendment, the Clean Air Act, and various non-discrimination laws. Insurance requirements are comprehensive, requiring Workers' Compensation with a 50 million dollar employers liability limit and business automobile liability of at least 1 million dollars. A contingency of up to 10 percent may be allowed for unforeseen circumstances, provided the total cost does not exceed 150,000 dollars. Final payment is contingent upon final inspection approval and the provision of a minimum one-year workmanship warranty.
General Services

POSTED

2 days ago

DEADLINE

in about 1 month
NAICS: 238190
New
SLED
RRHA-IFB-2026-34 Fay Towers Window Boarding
Solicitation # RRHA-IFB-2026-34
The Richmond Redevelopment and Housing Authority is soliciting firm fixed price bids for the installation of window boards on the second floor of the vacant Fay Towers building in Richmond, Virginia. The project involves securing approximately fifty windows to create durable, weather-resistant, and tamper-resistant closures until redevelopment begins in 2028. To eliminate the need for exterior lifts or scaffolding, all installations must be performed from the building interior using No. 2 or better 2x4 lumber for horizontal bracing and exterior-rated structural screws anchored into sound masonry. The contract consists of one base year with four one-year option years. The contract will be awarded to the low bidder following a responsibility determination based on financial ability, experience, legal history, and prior contract performance. Bidders must comply with the Davis-Bacon Act for prevailing wages and adhere to OSHA safety standards, including the use of hard hats and safety vests. While performance and payment bonds are not required, the successful contractor must maintain insurance naming RRHA as an additional insured. Bids must be submitted electronically via eVA by October 22, 2026, and must include a completed bid form, business licenses, notarized qualifications, and various HUD certifications. Payment terms are net 30 days, with a 2 percent discount available for payments made within ten days.
Richmond Redevelopment Housing Authority

POSTED

4 days ago

DEADLINE

in 5 days

AI Contract Overview

Show more

Solicitation N400857570886, titled Provide Overhead Protection from Spalling Concrete, B159, is a request for proposals to install two debris nets approximately 23 feet above the floor in Building 159 at MCAS Cherry Point, North Carolina. The primary objective is to collect broken concrete from the ceiling to ensure safety. The project must be completed within 120 calendar days of the award, and the contract will be issued as a task order under MACC Contract N4008525D. Award is based on the lowest price, with evaluations considering compliance with the Buy American Act for construction materials. The contractor is required to adhere to USACE EM 385-1-1 (2024) safety standards and maintain a quality control system compliant with FAR 52.246-12. Key deliverables include a salvage plan, a construction site plan, and a traffic control plan. Bonding requirements vary by proposal value, with no bonds required for amounts up to 35,000 dollars, payment bonds for amounts up to 150,000 dollars, and bid, payment, and performance bonds for amounts exceeding 150,000 dollars. Administrative requirements include hosting a partnering session within 45 days of award and submitting monthly invoices accompanied by digital photographs. Testing must be conducted by a U.S. Army Corps of Engineers approved laboratory located on-site or within five miles of the project.

General Info

Install two debris nets in Building 159, MCAS Cherry Point, within 120 days.

Place of Performance

MCAS Cherry Point, Havelock, NC, 28533, USA

Set-Aside

NONE

Documents

5

7570886 Amendment 0001 - Overhead Protection from Spalling Concrete, B159

PDF, High priority: read this firstamendment
High

7570886 Cover Sheet Location Plan

PDF, High priority: read this first2 pages · specifications
High

Project 7570886 Specifications – Overhead Protection at Bldg. 159

PDF, High priority: read this first132 pages · specifications
High

RFP N400857570886 – Overhead Protection from Spalling Concrete, B159

PDF, High priority: read this first15 pages · rfp
High

Pre-Proposal Inquiries Form

XLSX, Low priority1 page · q-and-a
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Notice updated

The notice description changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyBristol - North Carolina → Bristol Alliance of Companies
Contacts1 person available
OfficeN/A

Full Description

Show more
The work includes providing and installing two debris nets to collect broken concrete from the ceiling of building 159. The nets will be installed approximately 23 feet above the floor..

More opportunities from Bristol - North Carolina → Bristol Alliance of Companies

Same awarding agency

NAICS: 236220
New
SLED
JBLM Construct CHP Building
Solicitation # W912K3-26-R-A0001
Solicitation W912K3-26-R-A0001 is a Small Business Set-Aside, Design-Bid-Build project for the construction of a 20,000 square foot Pre-Engineered Steel Controlled Humidity Preservation (CHP) Building at Joint Base Lewis McChord, Washington. The project scope includes the purchase and erection of the steel building and concrete slab, installation of underground utilities, and the implementation of specialized systems including desiccant dehumidifying equipment and a dry pipe fire suppression system. The facility will also be solar-ready, featuring conduit installed below the roof structure for future photovoltaic panels. The estimated project magnitude is between 1 million and 5 million dollars, with a statutory cost limit of 5 million dollars. The contract will be awarded as a Firm Fixed Price task order based on a balanced evaluation of technical capability and price. Technical requirements include a task-oriented project schedule with a total completion date no later than 360 days after the Notice to Proceed, and documented qualifications for key personnel. Performance must adhere to strict standards, including UFC 3-600-01 and NFPA 13 for fire protection, and 2021 IBC and ASCE 7-16 for structural foundations. The contractor is responsible for all site-based sampling and testing via an accredited laboratory, with final validation provided by the USACE Material Testing Center. Payment will be processed through Wide Area Workflow (WAWF), and the project is subject to Davis-Bacon Act prevailing wage rates for Pierce County.
Commercial and Institutional Building Construction

POSTED

about 21 hours ago

DEADLINE

in about 16 hours
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS