Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of Defense was posted on August 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

B1806 Repair Control Tower HVAC

Closed
FA302226R0017Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238220
New
SLED
ICE 8A - Ft Benning Improvements
Solicitation # 70CMSW25R00000011
Solicitation 70CMSW25R00000011 is a firm-fixed-price task order issued under an 8(a) Multiple Award Construction Contract (MACC) for design-build services to support the Immigration and Customs Enforcement (ICE) Office of Firearms and Tactical Programs at Fort Benning, Georgia. The project, valued between 4.0 million and 4.5 million dollars, focuses on life, safety, and operational improvements. The scope of work includes the installation of two aluminum awnings at the shipping and receiving dock and Fiske Range Lane 2, turf replacement at Fiske Range, the demolition of Building 2294, gutter and drainage improvements for Building 234, commercial HVAC services and replacements, and general facility improvements for Building 301 and the DAGr Team facility. The period of performance is 365 days from the date of award. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates a sound technical approach, appropriate design resources, and a comprehensive quality control and safety program. The contract is subject to the Davis-Bacon Act, requiring prevailing wage rates and specific paid sick leave for workers. Performance and payment bonds are required per FAR 52.228-15. Proposals must be submitted in two volumes: a technical and safety volume and a pricing volume using the provided template. All payment requests must be processed electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 6 days
NAICS: 238220
New
SLED
PIDC Project 3 - Dorm RTU Replacement and SCADA
Solicitation # 872287
This firm-fixed-price task order, issued under an 8(a) MACC IDIQ, involves the replacement and upgrade of Rooftop HVAC Units (RTUs) for the Alpha, Bravo, Charlie, and Delta dorms, as well as a SCADA system upgrade at the Port Isabel Detention Center in Los Fresnos, Texas. The project objective is to replace corroded and obsolete equipment with high-quality, coastal weather-resistant, and durable systems that exceed commercial standards. The scope includes removing existing RTUs, replacing necessary piping, electrical, and ducting, and installing new SCADA software and two chemical feed pumps in compliance with Texas Commission of Environmental Quality standards. The estimated magnitude of the project is between 1.2 million and 1.5 million dollars, with a period of performance of 365 days from the date of award. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates a sound technical approach, appropriate design resources, and a comprehensive quality control and safety program. Key requirements include the submission of a Quality Control Plan, a safety plan, and the designation of a Project Manager with at least five years of relevant federal contracting experience. The contractor must also provide a one-year warranty for installation and craftsmanship and ensure all personnel pass required background checks for site access. Compliance with the Davis-Bacon Act and associated executive orders regarding wages and sick leave is mandatory. All payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 12 days
NAICS: 238220
New
RFQ7593 Smoke Detector Installation
Solicitation # RFQ7593
Management & Training Corporation (MTC) is soliciting bids for a fee-for-service subcontracting opportunity to provide smoke detector installation and fire system services at the Sierra Nevada Job Corps Center in Reno, Nevada. The scope of work requires the replacement of 43 smoke detectors across specific dormitory rooms, including 12 detectors in rooms 11, 15, and 18, 12 detectors in room 19, and 19 detectors in rooms 20 and 21. The contractor must ensure all installed detectors communicate with the fire panel and that all work adheres to NFPA standards and local Authority Having Jurisdiction requirements. Bids must be submitted via email to Tom Williams by 3:00 PM PST on September 18, 2026. To be considered, applicants must provide a completed bid sheet, proof of insurance, and a supplier packet containing a W-9, self-certification form, and acceptance of terms and conditions. This opportunity is open to various small business set-asides, including SDB, WOSB, HUBZone, and Veteran-Owned businesses, under NAICS code 238220. Award decisions will be based on the best value as determined by MTC. The contract mandates compliance with Service Contract Labor Standards and Wage Determination No. 2015-5595 Revision 28 for labor rates in Washoe and Storey counties. Additionally, subcontractors must provide a 12-digit Unique Entity ID and certify their debarment status under FAR 52.209-6 if the subcontract exceeds 30,000 dollars. Strict adherence to government and Department of Labor guidance regarding the protection of sensitive and proprietary information is required.
Sierra Nevada Job Corps Center

POSTED

about 6 hours ago

DEADLINE

in 7 days
NAICS: 238220
New
2026-Clearfield-Bldg E8 Welding HVAC
Solicitation # 2026- Clearfield- Welding Bldg. E8 HVAC Replacement
Management & Training Corporation is seeking fixed-price lump sum bids for a subcontracting opportunity to replace the HVAC system at Building E8 Welding within the Clearfield Job Corps Center in Clearfield, Utah. The scope of work includes the complete change-out of the existing motor, installation of wiring, conduit, disconnects, breakers, fuses, and starters, and the subsequent validation of voltage, phase, and grounding. Deliverables include startup and testing documentation, onsite training for maintenance personnel, and the provision of manufacturer O&M manuals. All work must adhere to OSHA requirements, federal, state, and local codes, and site safety procedures. Bids must be submitted via email to nelson.dar@jobcorps.org and patricia.willover@mtctrains.com by September 19, 2026, at 3:00 PM MST. To be considered for award based on overall best value, offerors must complete a physical site visit, provide a detailed bid breakout on company letterhead, and submit a bid bond guarantee. The project is a small business set-aside under NAICS 238220 and requires compliance with Davis-Bacon prevailing wage determinations for Davis County. Awardees must provide a UEI number, submit a Schedule of Values for invoicing via AIA G702/G703 forms, and provide original payment and performance bonds from a surety with at least an A- rating within five business days of an Intent to Award letter. Performance dates will be established upon the signing of a Notice to Proceed.
Management & Training Corporation

POSTED

about 6 hours ago

DEADLINE

in 7 days
NAICS: 238220
New
CBP7664 Wellness HVAC Compressor Replacement
Solicitation # CBP7664
Management & Training Corporation is seeking bids for a subcontracting opportunity to replace a failed HVAC/refrigeration compressor at the Wellness facility of the Sierra Nevada Job Corps Center in Reno, Nevada. This fixed-price, single lump sum contract requires the contractor to provide all labor, materials, and equipment to execute a five-phase process including preparation, demolition, installation of an OEM-specified compressor, system testing and commissioning, and final closeout. The project must restore full cooling capacity and operational efficiency while adhering to EPA Section 608 regulations for refrigerant recovery. The work must be completed within thirty consecutive business days following the receipt of a written Notice to Proceed. Bids will be evaluated based on overall best value, considering price, quality, and delivery schedule. The estimated price range is between 0 and 25,000 dollars, though bids equal to or greater than 25,000 dollars require a 20 percent bid bond guarantee and subsequent performance and payment bonds from an A-rated surety company. Submission requirements include a bid sheet, proof of insurance, three comparable project references, and a completed supplier packet containing a W-9 and self-certification of business size under FAR 52.219-8. Contractors must comply with Davis-Bacon Act prevailing wage rates for Washoe County and adhere to FAR 52.204-10 reporting if the award reaches 40,000 dollars. Final payment is contingent upon a successful final inspection and the submission of a notice of final completion, certified payroll reports, and operation and maintenance manuals.
Sierra Nevada Job Corps Center

POSTED

about 6 hours ago

DEADLINE

in 12 days
NAICS: 238220
New
This is a subcontracting opportunity to replace a chiller in McKinney, TX.
Solicitation # subcontracting-opportunity-replace-chiller-mckinney-tx
Serrato Corporation is seeking bids for a subcontracting opportunity to replace a failing air-cooled chiller at the North Texas Job Corps Center, specifically within Building 214/215 in McKinney, Texas. The scope of work includes the demolition and disposal of the existing chiller, the installation and startup of a new air-cooled chiller, and the integration of building automation controls using a JACE 9000 central integration point. Additionally, the contractor is responsible for installing three-way control valves at four air handling units, replacing VFDs, performing AHU cleaning and inspection, and ensuring all wiring is plenum-rated. Bids must be submitted by September 18, 2026, and quotes must remain valid for 90 days. Required submission documentation includes manufacturer equipment specifications, a Certificate of Liability Insurance naming Serrato Corporation as the holder, and Form 1413 for Davis-Bacon Act certified payroll compliance for work exceeding 2,000 dollars. Insurance requirements include a minimum of 500,000 dollars for Employers Liability and 1,000,000 dollars per occurrence for Commercial General Liability. The project is set aside for various small business categories, including SDB, WOSB, HUBZone, VOSB, and SDVOSB. Primary points of contact for this solicitation are Stacy Smith and Roy Henderson.
Serrato Corporation DBA North Texas Job Corps

POSTED

about 6 hours ago

DEADLINE

in 7 days
NAICS: 238220
New
Main Building 1 Wing 5 – Six Rooftop HVAC Unit Replacement – Glenmont Job Corps Center
Solicitation # S26-010
The Glenmont Job Corps Center is soliciting proposals from qualified, New York State licensed contractors for the replacement and installation of HVAC equipment within Main Building No. 1, Wing 5 (Education Building) in Glenmont, New York. The project involves replacing two 7.5-ton split-system units for the auditorium, one 6-ton rooftop unit for the library and computer lab, and one 12.5-ton rooftop unit for the north and east wing classrooms. Additionally, the scope includes installing four 2-ton ductless mini-split heat pump systems, removing a window air-conditioning unit, and abandoning two 5-ton rooftop units in place. Comprehensive associated work encompasses demolition, roof curbs and penetrations, ductwork, refrigerant and condensate piping, electrical work, controls, structural roof evaluations, and fire alarm and duct smoke detector installations, concluding with testing, balancing, and commissioning. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and Veteran-Owned Small Businesses. The project must be completed within 210 calendar days following the written Notice to Proceed, and the facility will remain operational throughout the construction period. Key deadlines include a pre-proposal site walkthrough on September 10, 2026, with vendor questions due by September 14, 2026. Final proposals must be submitted by September 21, 2026, at 4:00 PM ET. All work must comply with applicable New York State codes, safety regulations, and environmental requirements.
Adams and Associates, Inc.

POSTED

about 6 hours ago

DEADLINE

in 9 days
NAICS: 238220
New
Replace HVAC Systems in the following buildings on our campus –1.) ABL Dormitory
Solicitation # 26-141
This subcontracting opportunity, managed by Adams & Associates, Inc. for the U.S. Department of Labor, involves the replacement of HVAC systems at the Atterbury Job Corps Center ABL Dormitory in Indiana. The project requires replacing existing R-22 Bryant condensing units and coils serving common areas and dormitory wings A, B, C, and D with new 12.5 SEER packaged units utilizing non-R22 refrigerants such as R-410A or R-454B. The contractor is expected to reuse existing electrical disconnects, ductwork, and thermostat wiring, and must label and leave all recovered refrigerant on-site. Bidders must attend a mandatory site visit on September 23, 2026, and submit a single lump sum proposal by October 5, 2026. Award will be based on best value, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Eligible vendors must maintain an active SAM.gov registration and a Unique Entity ID, hold a valid Indiana Contractor's License, and provide proof of specific automobile and workers' compensation insurance. Compliance with EPA, OSHA, and Davis-Bacon Act wage determinations is mandatory. Final payment is subject to Net 30 terms and is contingent upon the submission of a completed SF 1413, certified payroll records, and the release of liens from all subcontractors and material suppliers.
Adams & Associates, Inc.

POSTED

about 6 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

Contractors must complete CUI training and submit a signed acknowledgment to access restricted drawings and documentation, with access to locked SAM.gov materials granted only after confirmation. Proposals are to be submitted electronically by 7:00 PM CST on August 17, 2026, for a total small business set-aside under NAICS code 238220, with an estimated value between $100,000 and $250,000. The work involves replacing four fan-coil HVAC units in the Aircraft Control Tower at Columbus Air Force Base across floors 1, 2, 4, and 7. A site visit is scheduled for July 30, 2026, at 9:00 AM CST, but attendance requires registration by July 22, 2026, via email to obtain a DoD Safe link for submitting the Entry Authorization Listing; failure to register by the deadline disqualifies participation. All visitors must present a valid REAL ID-compliant photo ID, and drivers must carry a valid license, vehicle registration, and proof of insurance. Contractors must report to the Columbus AFB Visitors Center early and await a 14th Contracting Squadron representative for escorted access. All requests for information must be submitted no later than 7:30 AM CST on August 3, 2026. Funds are not currently available, and the government is not liable for any payments until appropriated funds are officially allocated and confirmed in writing by the Contracting Officer.

General Info

Contractors must complete CUI training, register for site visit, submit electronic proposal by August 17, 2026, for HVAC replacement at Columbus AFB under small business set-aside.

Agency

Department Of Defense → FA3022 14 Cons LgcaView Agency

NAICS

238220 - Plumbing, Heating, and Air-Conditioning ContractorsView NAICS

Place of Performance

Columbus, MS, USA

Set-Aside

SBA

Documents

(11)

EEPZ254660 Repair Control Tower HVAC B1806 Statement of Work

PDFsow

MFR CUI Contractor Training Acknowledgment July 2024

PDFmemorandum

Wage Determination for Mississippi Building Construction

PDFwage-determination

Amendment FA302226R00170001 to Solicitation FA302226R0017

PDFamendment

EEPZ254660 Repair Control Tower HVAC B1806 AF Form 66

XLSXcontract-document

EEPZ254660 Repair Control Tower HVAC B1806 Statement of Work 03 August 2026

PDFsow

Contractors CUI Training Slides

PPTX23 pagesother

Entry Authorization Listing (EAL) Template 2026

PDFentry-authorization-listing

Solicitation FA302226R0017 Repair Control Tower HVAC B1806

PDFrfp

B1806 Site Visit Sign-in Sheet

PDFother

Appendix A - Cost Breakdown for Columbus Air Force Base Construction Proposal

XLSXcost-breakdown

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Amendment 1

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA3022 14 Cons Lgca
Contacts2 people available
OfficeCOLUMBUS, MS, 39710-0001, USA
Organization / Agency
Department Of Defense → FA3022 14 Cons Lgca
View Agency Profile
Office AddressCOLUMBUS, MS, 39710-0001, USA

Full Description

Show more

NOTE 01: Building 1806 Site Visit Sign in Sheet has been posted. 


_________________________________________________________________________________________________


Amendment 01: The purpose of this amendment is to: Update the Statement of Work from SOW Dated 14 May 2026 to SOW Dated 03 August 2026. The updated SOW includes an additional phasing requirement and additional requirements regarding the temperature sensor in the scope of the project. Changes to the SOW are in red.


                                                                                                                                                                                                           


NOTE: Contractors/Offerors must complete CUI Training Slides; sign and return the "MFR Contractor CUI Training Acknowledgment for Solicitations" attachment to gain access to drawings and other associated CUI documentation. Once the POC has received your signed MFR, please request access to the locked documents through SAM.gov. Your MFR will be reviewed and access to the lock SAM.gov documents will be granted accordingly. Proposals will be submitted electronically.


Description: The goal of this project is to replace four (4) existing fan-coil HVAC units within the Aircraft Control Tower. The scope includes work on floors 1, 2, 4 and 7.


Site Visit, RSVP, and Base Entry: The Government invites you to a site visit on 30 Jul 2026 at 9:00 AM CST. Attendance is highly encouraged but not mandatory. Please note that registration is required by 7:30 AM CST on 22 Jul 2026. To register, please email the POC requesting a DoD Safe drop-off link to securely upload your completed Entry Authorization Listing (EAL) document (found in the list of SAM.gov attachments). If you do not contact the POC by 7:30 AM CST on 22 Jul 2026, you will not be able to attend the site visit.


Identification: All attendees must bring a valid photo ID. All photo IDs must meet the requirements for "REAL ID." 


Vehicle Requirements: If driving on base, please ensure the driver has driver's license, vehicle registration, and proof of insurance.


IMPORTANT: All contractors should arrive at Columbus AFB’s Visitors Center early and wait for a 14th Contracting Squadron representative to arrive and lead them to the site visit location. The representative will leave the visitors’ center at 9:00 AM CST


Additional InfoAll RFIs must be submitted NLT 7:30 AM CST, on 03 Aug 2026.


The range of magnitude for this procurement is between $100,000 and $250,000.


52.232-18 Availability of Funds. Availability of Funds (Apr 1984)


Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS