Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on September 20, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

B246 NDI Lab Bathroom Renovation

Closed
FA302222R0009Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific performance area in Riverside or Los Angeles, focuses on basin improvements under NAICS code 236220. The solicitation was posted on October 19, 2026, with a response deadline of November 4, 2026. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation. To secure project financing, the Inland Empire Utilities Agency requires strict adherence to expanded DBE Good Faith Effort (GFE) guidelines. Bidders must provide proof of utilizing SBA and MBDA services and demonstrate that solicitations were posted in an online publication for 30 consecutive days and in a newspaper for at least one day prior to the bid opening. Failure to include this documentation within the bid package will result in the proposal being deemed non-responsive. While outreach documentation may be submitted up to three business days after the closing date, all other mandatory GFE requirements must be met by the opening date to ensure compliance.
RT CONTRACTOR CORP

POSTED

about 14 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 14 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located on the northeast end of Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation involving soil stabilization and utility relocation; construction of the plant including a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic system for invoicing and payments and are required to accept the standard Overaa agreement without modification. Key milestones include a mandatory pre-bid meeting on October 5, 2026, with bid submission deadlines listed as either October 28 or November 10, 2026.
C. Overaa & Co.

POSTED

about 14 hours ago

DEADLINE

in 21 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes comprehensive site work such as clearing, rock excavation, grading, and wetland mitigation, as well as the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building. Demolition of 18 existing magazines and buildings 524 and 393 is also required. Technical requirements encompass a wide range of trades including demolition, abatement, concrete, structural steel, roofing, electrical, plumbing, and mechanical systems. Specialized construction features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. The project also involves installing primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact the primary point of contact by the October 31, 2026, deadline to receive bid documents.
J & J Contractors, Inc

POSTED

about 14 hours ago

DEADLINE

in 11 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Columbus, MS, 39710, USA

Set-Aside

SBA

Documents

13

Attachment 3 - Form 66 Submittal Register

XLSX, High priority: read this first12 pages · specifications
High

DD Form 1354 - Transfer and Acceptance of DoD Real Property

PDF, Low prioritycontract-document
Low

Attachment+1+-+NDI+Lab+Revised+SOW+Dated+13+Sep+2022.pdf

PDF

Attachment+1+-+Revised+SOW+Dated+1+Sep+2022.pdf

PDF

Attachment+5+-+Wage+Determination.pdf

PDF

MFR+Site+Visit+B246+NDI+Lab+Bathroom-CO+Signed.pdf

PDF

RFI+Answers+1+-+B246+Renovation-Signed.pdf

PDF

RFI+Answers+2+-+B246+Renovation-CO+Signed.pdf

PDF

RFI+Answers+3+Consolidated+-+B246+Renovation.pdf

PDF

Solicitation+Amendment+FA302222R00090001+SF+30+.pdf

PDF

Solicitation+Amendment+FA302222R00090002+SF+30++.pdf

PDF

Solicitation+Amendment+FA302222R00090003+SF+30+CO+Signed.pdf

PDF

Solicitation+-+FA302222R0009.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

8 updates
PhaseClosed
Posted

Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Sep 12, 2022 to Sep 15, 2022. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Sep 15, 2022 to Sep 22, 2022. The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA3022 14 Cons Lgca
Contacts2 people available
OfficeCOLUMBUS, MS, 39710-0001, USA
Office AddressCOLUMBUS, MS, 39710-0001, USA

Full Description

Show more
Amendment 8: The answers to RFIs submitted through 19 September 2022 have been posted in the attachments. Please see attachment RFI #3 Consolidated. There have been no other changes to this requirement. If you have any questions about this change, please contact the POC via email. Amendment 7: **ATTENTION PLEASE READ** The purpose of this amendment to the Solicitation for the B246 NDI Lab Bathroom Renovation project FA302222R00090003, is to update the SOW, extend the proposal due date, and offer a second site visit opportunity. Due to the RFIs recieved, the scope of this project has changed. Please view the SOW attachment titled "Attachment 1 - NDI Lab Revised SOW Dated 13 Sep 2022" and the concept drawings located on pages 14 & 15 of "Attachment 4 - Pertinent Drawings and Documents" for further details. Due to the SOW change, the Government is offering a second site visit opportunity on 19 September 2022 at 1:00 PM CST, and extending the proposal due date to 21 September 2022 at 11:59 PM CST. In order to attend the site visit, your team must contact the POC to inform them of your intent to attend NLT 4:30 PM CST on Thursday, 15 September 2022. If you do not contact the POC by 4:30 PM CST on 15 September 2022, you will not be able to attend the site visit. All additional RFIs must be submitted NLT 11:59 PM CST on 19 September 2022. Amendment 6: The answers to RFI's submitted through 7 September 2022 have been posted in the attachments. The access to attachement RFI-As Built Drawings, RFI- Asbestos Report, RFI- CAD, are marked Controlled IAW Air Force Controlled Unclassified Information regulations, please request access in order to view it. There have been no other changes to this requirement. If you have any questions about this change, please contact the POC via email. Amendment 5: The answers to RFIs submitted through 7 September 2022 will be posted in the attachments by COB 12 September 2022 instead of 9 September 2022 due to aquiring additional information for answers. There have been no other changes to this requirement. If you have any questions about this change, please contact the POC via email. Amendment 4: The Solicitation has been changed to reflect an extention to the Proposal Due Date by 3 calendar days from 12 September 2022 to 15 September 2022. There have been no other changes to this requirement. If you have any questions about this change, please contact the POC via email. Amendment 3: The Statement of Work (SOW) for this requirement has been updated. The previous "Attchament 1 - SOW Dated 3 Aug 2022" has been redacted and replaced with the revised SOW dated 1 September 2022. Also, the access to attachement 4 for drawings has been changed IAW Air Force Controlled Unclassified Information regulations, please request access in order to view it. There have been no other changes to this requirement. If you have any questions about this change, please contact the POC via email. Amendment 2: This Solicitation was amended in order to incorporated Wage Determination MS20220045, Modification 2, dated 25 February 2022 into the solicitation, and remove DFARS 252.219-7009. Please also note that the answers to RFIs submitted through 30 August 2022 have been posted in the attachments. There have been no other changes to this requirement. If you have any questions about this change, please contact the POC via email. Amendment 1: This opportunity was originally listed under Notice ID FA302222R0008, and is now listed under Notice ID FA302222R0009. This requirement's opportunity notice was redacted and reissued in order to change the form of the solicitation document from Standard Form 1449 to Standard Form 1442. There have been no other changes to this requirement. If you have any questions about this change, please contact the POC via email. The subject requirement is to complete a full renovation of the existing co-ed restroom and provide separate men's and women's restrooms as well as the installation of a new shower system in each restroom of Building 246 at Columbus Air Force Base. The Contractor shall provide all plant, labor, equipment, transportation, and tools required, and perform all work according to this Statement of Work (SOW), the Concept Design Drawings, and all related AF requirements and other codes and references.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS