Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Award Notice opportunity from Florida was posted on December 2, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Babcock/Webb Wild Management Area Fence Replacement - Agency Decision

Awarded
FWC 25/26-10State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238990
New
Federal
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation number SD-462, is a comprehensive infrastructure project located at the Main Wastewater Treatment Plant in California. The scope of work involves the rehabilitation of covered and open concrete structures, relining and replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Key technical requirements include the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, and the modification of sluice and slide gates. Additionally, the project encompasses the installation of platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying of reactor areas. The estimated contract value for this project ranges between 18.5 million and 19.5 million dollars. This solicitation is designated as a Small Business set-aside, including SBA certified Veteran Owned Small Business, Service-Disabled Veteran Owned Small Business, Women-Owned Small Business, and HUBZone Small Business. The bid opening is scheduled for December 2, 2026. Ranger Pipelines Incorporated is seeking quotes from certified DBE, DVBE, and SBE subcontractors for specialized services such as coating, lining, concrete rehabilitation, and welding. All subcontractors must comply with applicable state, county, and federal regulations.
Ranger Pipelines Incorporated

POSTED

about 6 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The contract pertains to the award of a construction project for replacing fencing at the Babcock/Webb Wildlife Management Area in Florida, issued by the Florida Fish and Wildlife Conservation Commission. The solicitation, identified as FWC 25/26-10, was publicly posted on December 2, 2025, with a response deadline of December 5, 2025. Griffin Fence and Clearing, Inc. was selected as the successful bidder, submitting the lowest responsive bid of approximately $24,000.25. The procurement process followed Florida statutory procedures, including provisions for protest filings within 72 hours of the award notice, excluding weekends and holidays, and bonding requirements such as a cashier’s check in lieu of a bond. The project involves construction services under NAICS code 238990, with an estimated contract value within a range of $500,000 to $1,500,000, though the actual awarded amount is significantly lower, indicating a straightforward, low-cost project. The final bid tabulation confirms the bid evaluation was based primarily on price, with Griffin Fence and Clearing, Inc. being awarded the contract based on the lowest bid among responsive offers. Specific technical details, including scope of work, performance schedule, inspection criteria, and technical specifications, are not detailed in the provided documents. There are no explicit references to contract clauses, evaluation factors, or detailed contractual obligations such as packaging, marking, or special contract requirements. Additionally, no representations, certifications, or offeror-specific socioeconomic or size status information are included. Overall, the contract signifies a straightforward procurement process for fence replacement, with procedural compliance and protest rights clearly outlined, but lacking detailed technical or contractual clauses within the available documentation.

Documents

1
PDF, High priority: read this first1 page · bid-tabulation
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Asphalt Paving Equipment Rental and OperationOpen now, due in 36 days
  • MAIN WASTEWATER TREATMENT PLANT SECONDARY REACTORS REHABILITATION,PHASE 2, SPECIFICATION SD-462Open now, due in 7 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseAwarded
Posted

Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida Fish and Wildlife Conservation Commission (FWC)
Contacts1 person available
OfficeN/A

Full Description

Show more
This is the Commission’s notice of its Agency Decision to award solicitation number Solicitation FWC 25/26-10 to Griffin Fence and Clearing, Inc.Pursuant to Chapter 120, Florida Statutes (F.S.), the posting of this Notice of Agency Decision/Award will begin Tuesday, December 2, 2025 at 11:14am ET and will end 72 hours later (excluding Saturdays, Sundays, and state holidays) on Friday, December 5, 2025 at 11:30am ET.Any person who is adversely affected by the agency decision or intended decision shall file with the agency a notice of protest in writing within 72 hours after the posting of the notice of decision or intended decision. Saturdays, Sundays, and state holidays shall be excluded in the computation of the 72-hour time periods.Failure to file a protest within 72 hours, the time prescribed in section 120.57(3), F.S., or failure to post the bond or other security required by law within the time allowed for filing a bond, shall constitute a waiver of proceedings under Chapter 120, Florida Statutes

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS