This Subcontract opportunity from Massachusetts was posted on April 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Backfilling, Compaction, and Site Restoration
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract encompasses the backfilling of trenches in controlled lifts, requiring strict adherence to compaction standards and verification through testing to ensure structural integrity. Full restoration of all disturbed surfaces including asphalt, curb, and sidewalk is mandated to match original conditions, ensuring safety, aesthetics, and compliance with municipal standards. Work must be performed in the designated area along East Central Street in Natick, Massachusetts, with all materials and methods meeting required specifications for durability and longevity. The project is issued as a subcontract under NAICS code 238990, with a submission deadline of May 22, 2026, and was posted on April 29, 2026. The solicitation is administered by the Town of Natick under the Massachusetts agency framework, and performance is expected to be completed in full compliance with local regulations and engineering requirements.
General Info
Place of Performance
East Central Street Natick, MA, 01760, USASet-Aside
Documents
This scope was carved out of W-172.
The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.
IFB: Hartford Street Water Main Rehabilitation. Available from Haley Ward .
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- MAIN WASTEWATER TREATMENT PLANT SECONDARY REACTORS REHABILITATION,PHASE 2, SPECIFICATION SD-462Open now, due in 15 days
- PURIFIED WATER REPLENISHMENT SAN JACINTO VALLEY ADVANCED WATER PURIFICATION FACILITY SPECIFICATION NO. 1472WOpen now, due in 2 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
