Backup Generator Installation

Active

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Documents

This scope was carved out of SRP-W-134-0290.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Morgans Branch Force Main and Pump Station Improvements

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDon Moorhead Construction, Inc.
ContactsNo contacts available
OfficeN/A
Organization / AgencyDon Moorhead Construction, Inc.
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs backup power systems for prime contractors on City of Belmont, NC wastewater projects. Installs the generator and auxiliary power systems per Spec Section 26 32 13. Delivers an operational backup generator.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
26-169
Solicitation # SJPC-26-169
The Balzano Lift Truck project, solicitation SJPC-26-169, is a public works procurement by the South Jersey Port Corporation for the installation of electric vehicle charging infrastructure at the Balzano Marine Terminal in Camden, New Jersey. The primary objective is to establish charging facilities for two Taylor ZLC-995 top loader trucks and five Ford Lightning work trucks. The technical scope includes the installation of a 1MVA transformer, a 1200A main disconnect, a 480V panel, two 200kW chargers, a 112.5kVA transformer, a 208V panel, and five 11.5kW chargers. The contractor is responsible for all labor, materials, and supervision, including the installation of underground conduits, ground rings, and precast transformer pads, all performed in accordance with NEC 2020, NFPA 70E, and OSHA standards. The contract is subject to stringent regulatory and compliance requirements, including New Jersey State prevailing wage laws, Executive Order 151 regarding equal employment opportunity, and the Build America, Buy America (BABA) act for the 200kW charging stations. Bidders must provide performance and payment bonds, a consent of surety, and disclose political contributions via the NJ ELEC affidavit. The project emphasizes small business participation, with a 25 percent set-aside goal for certified Small Business Enterprises. Award evaluation is based on proposal completeness, with specific rules for resolving discrepancies in favor of unit prices and written words. Final deliverables include a complete set of redline drawings submitted to the owner's engineer upon project completion.
South Jersey Ports

POSTED

about 3 hours ago

DEADLINE

in 4 days
View Details
NAICS: 238210
New
SLED
EF-South Control Panel Relocation
Solicitation # DFW21311
The Dallas-Fort Worth International Airport Board is soliciting quotes under solicitation number DFW21311 for the relocation of the E/F-South Sump Pump Control Panel to a new upper-level location at the E/F-South Vault within the Energy Plaza/Central Utility Plant. The scope of work includes the safe de-energization, labeling, and disconnection of electrical circuits, as well as the mounting of the panel and the extension of raceways, feeders, and conductors. The contractor is responsible for providing all necessary hardware, fittings, and grounding and bonding in strict accordance with current National Electrical Code (NEC) standards, facility standards, and manufacturer recommendations. A fully operational system and reported test results for all terminations and circuits are required for final acceptance. Quotes must be submitted exclusively through the Bonfire hub portal by 2:00 PM Central Time on October 15, 2026, and must remain valid for 60 days. Pricing must be F.O.B. destination, freight prepaid and allowed, to the Energy Plaza/Central Utility Plant, with deliveries scheduled between 8:00 AM and 4:00 PM, Monday through Friday. The contract will be awarded as a purchase order to the lowest responsive and responsible bidder, with the Board reserving the right to split the award. Awardees must comply with Executive Order No. 11246 regarding nondiscrimination, provide a full warranty statement with their quote, and adhere to OSHA regulations for the labeling and documentation of any hazardous chemicals used.
Dfw International Airport

POSTED

about 20 hours ago

DEADLINE

in 6 days
View Details

More opportunities from Don Moorhead Construction, Inc.

Same awarding agency

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves constructing 16,435 linear feet of new 20-inch ductile iron force main and performing extensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, pumps, a generator, and odor control equipment, as well as the demolition of existing pumps and piping. Additional requirements include the installation of new gravity sewers, manholes, stormwater facilities, and site grading. The contract is a small business set-aside open to various SBA certifications, including VOSB, SDVOSB, WOSB, and HUBZone. Award will be granted to the responsible bidder submitting the lowest responsive bid, with evaluation focusing on qualifications, financial ability, and the submission of required MWBE documentation. Performance begins upon a Notice to Proceed, which is typically issued within 30 to 60 days of the bid opening. The contractor is required to provide performance and payment bonds, adhere to National Electric Code and NEMA standards, and ensure all materials are delivered and stored according to strict manufacturer and safety specifications. Payment is processed via applications for payment reviewed by the Engineer and is due thirty days after presentation to the owner.
Water and Sewer Line and Related Structures Construction

POSTED

about 1 hour ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS