Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Agriculture was posted on June 5, 2019. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Baker Lake Visitor Information Center Parking Area Redevelopment

Closed
1205M619Q0016Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC) is seeking bids for a subcontracting opportunity to perform road and parking lot repairs at the Joliet Job Corps Center in Illinois. This fixed-price, single lump sum contract has an estimated value between $100,000 and $250,000. The scope of work includes asphalt pavement replacement covering approximately 62,500 square feet across five key areas, including the guard shack, dorm parking lot, and kitchen/BCT areas. Additionally, the contractor must repair five storm sewer drain structures and five potholes, ensuring all work meets industry standards and proper drainage grades. The project must be completed within 90 consecutive business days following a written Notice to Proceed. Bids will be evaluated based on overall best value, and submission requires a signed MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, and proof of a mandatory physical site visit. For bids equal to or exceeding $25,000, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Compliance with Construction Wage Rate Requirements (CWRR) is mandatory, requiring weekly certified payroll and adherence to prevailing wage determinations. Final payment is contingent upon a successful final inspection and the submission of operation and maintenance manuals.
Joliet Job Corps

POSTED

about 6 hours ago

DEADLINE

in about 22 hours
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 project, a firm fixed price construction contract focused on watershed restoration within the Little Nespelem WMU. The primary objectives are to improve water quality, enhance riparian habitats, promote natural water flow, and reduce the impact of open-road density on wildlife. The scope of work requires the contractor to decommission six road segments totaling 3.29 miles, install two tank traps, and transport all removed non-natural materials, such as culverts and fencing, to a COR-approved disposal facility. All activities must adhere to specific Colville Indian Reservation Tribal Law and Order Codes regarding cultural resources, forest practices, water quality, hydraulic practices, fire management, and industrial safety, as well as 43 CFR 10.4 for inadvertent discoveries. This is an Indian Preference set-aside under the Tribal Employment Rights Ordinance (TERO), requiring a minimum of 51 percent of seasonal or project-based employees to be of Indian preference origin. Award will be granted to the lowest, responsive, and responsible bidder who demonstrates technical experience in stream crossings, road cross drainage, and bank stabilization. Bidders must submit a comprehensive packet by October 29, 2026, including a signed bid sheet for the entire project, a detailed work plan with equipment and schedules, TERO certification, a debarment form, and proof of liability insurance of at least 1,000,000 dollars. The Contracting Officer Representative (COR) will oversee material acceptance and work plan approval to ensure compliance with environmental and safety standards.
Confederated Tribes of the Colville Reservation

POSTED

about 7 hours ago

DEADLINE

in 8 days
NAICS: 237310
New
SLED
2027022
Solicitation # 2027022
RFP# 2027022 is a unit price solicitation issued by the Spartanburg County Government in South Carolina for the Twin Tier 3 Subdivision Reclamation project, specifically focusing on Group 1, which includes the Timberlake and Wicklow areas. The scope of work involves roadway improvements and reclamation, with key pay items including the removal and disposal of existing asphalt pavement, the application of maintenance stone, 8-inch full depth patching, and wrecker services. Technical specifications require adherence to SCDOT Standard 401.3.19.2, specifically mandating the use of a sloped edge longitudinal shoulder joint attachment for all surface mixtures placed at 150 lb/sq yd or greater to ensure a consolidated wedge-shaped pavement edge between 25 and 35 degrees. The contract is administered as a unit price agreement where final payment is based on field-verified quantities of work performed. Proposers must maintain statutory worker's compensation and commercial general liability insurance of at least $1 million, naming Spartanburg County as an additional insured. Proposals must be binding for 60 days and are subject to the South Carolina Freedom of Information Act. Award eligibility is contingent upon the proposer's certification of non-debarment by the State of South Carolina, compliance with federal civil rights and labor laws, and the absence of conflicts of interest. Payment for undisputed invoices is due upon receipt and considered past due after 30 days, with no interest accruing on late payments.
Spartanburg County Government

POSTED

about 8 hours ago

DEADLINE

in 9 days

General Info

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

Refer to Amendment 01, Attachment 1 - Project Location, CONCRETE, WA, 98237, USA

Set-Aside

SBA

Documents

3

Amendment_01.pdf

PDF

Amendment_01.pdf

PDF

RFQ_No_1205M619Q0016.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseClosed
Posted

Presolicitation

Notice updated

Response deadline added: May 29, 2019. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Type Changed

Presolicitation → Solicitation

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Mt Baker Snoqualmie National Forest
Contacts1 person available
OfficeEVERETT, WA, 98201, USA
Office AddressEVERETT, WA, 98201, USA
Contacts
Brian A. JohnsonContract Specialist/Contracting Officer

Full Description

Show more
PROJECT NAME: Baker Lake Visitor Information Center Parking Area Redevelopment. PLANNED SCOPE OF WORK: The intent of this project is to reconstruct and expand the existing parking area including constructing a new 40'x 60' plaza and walkways with cast-in-place reinforced concrete. There will be an optional item to install a chain link fence. Typical work activities include: construction surveying, clearing, excavation, crushed aggregate, cast-in-place reinforced concrete, rock wall construction, paving, burying an electrical line, fencing, and striping/marking. GOVERNING SPECIFICATIONS: The FP-14 https://flh.fhwa.dot.gov/resources/specs/ among other specifications required in the solicitation and resultant contract will dictate the means and methods for carrying out the designs of this project. PROJECT LOCATION: Mt. Baker-Snoqualmie National Forest, Mt. Baker Ranger District (Refer to Amendment 01, Attachment 1 - Project Location). DRIVING DIRECTIONS: The project area is located at T37N, R8E, Sec 25. From Interstate Highway 5 drive approximately 23 miles east on Highway 20 to the Baker Lake Road (FSR 11) on left. On Baker Lake Road drive approximately 13 miles to the project site on the right. District maps showing the project road systems are available for viewing at the district office in Sedro-Woolley, WA. Project area can be accessed via paved roads. PLANNED START DATE FOR WORK: June 17, 2019 RECOMMENDED DAYS FOR CONSTRUCTION (Start to Finish): 120 calendar days, which places the estimated completion date to October 15, 2019. PRE-QUOTE SITE VISIT: Will not be held, but the USDA Forest Service expects interested companies to visit the project site. If your firm elects to not visit the project site this demonstrates a higher risk to the government and will be considered during the evaluation of quotes. Firms that do not visit the project site prior to preparing its quote are reminded of FAR 52.236-3 -- Site Investigation and Conditions Affecting the Work. This clause squarely places performance and cost risk on the contractor in situations where the site was not inspected. CONTRACT TYPE: This will be a firm-fixed-price (FFP) construction project prepared in accordance with FAR Part 36 - Construction Contracting. INVOICE PROCESSING PLATFORM (IPP): The awardee of the contract will be required to submit payments via the www.ipp.gov platform. Paper invoices are not acceptable. SYSTEM FOR AWARD MANAGEMENT (SAM): Companies are reminded to please review your SAM account to ensure your accout is active and will remain active in calendar years 2019-2020. If your SAM account becomes inactive you will not receive payment via the IPP website. MAGNITUDE OF CONSTRUCTION PROJECT (FAR 36.204): Between $100,000.00 and $250,000.00 BID BOND (FAR 52.228-1): Original Bid Bond is required with initial quote. If the original bond is not received your quote will be considered non-responsive to this solicitation requirement and will not be considered for contract award. PERFORMANCE AND PAYMENT BONDS (FAR Clause 52.228-15): Required only after award of contract and the bonds premium is reimbursable under the mobilization line item. PAYMENT TERMS: FAR 52.232-5 Payments Under Fixed-Price Construction Contracts authorizes a monthly progress payment that is payable within fourteen (14) calendar days after the contracting officer (CO) receives an acceptable invoice. Cash flow is vital for your company so the CO is amiable toward two invoices a month. Payment for materials stored on site is authorized under this clause with certain requirements to be met. TECHNICAL POINT OF CONTACT: Thomas Warter, Facilities Engineer, Telephone: (425) 783-6082, E-mail: thomas.warter@usda.gov.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS