Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Baker Water Treatment Plant CIP Piping Replacement

Closed
13200State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Baker Water Treatment Plant CIP Piping Replacement project, solicitation number 13200, is a construction effort for the Engineering Department of the Irvine Ranch Water District located in Lake Forest, California. The scope of work involves the demolition of existing floor slabs, walls, and Clean-in-Place (CIP) piping, followed by the excavation and installation of a new CIP concrete containment trench. Mechanical requirements include the installation of new CIP piping and supports, modifications to air release valve discharge piping, and the application of high-performance coatings to the new trench, piping, and existing eyewash station piping within the Chemical Building. The project also requires startup testing and the delivery of final record drawings. Bids must be submitted electronically via PlanetBids by 2:00 PM on October 15, 2026, with a mandatory pre-bid meeting on September 30, 2026. The contract will be awarded to the lowest responsive and responsible bidder possessing a current California Class A contractor's license. Mandatory submission requirements include a safety program certification, a non-collusion declaration, and California Air Resources Board certification for in-use off-road diesel-fueled fleets. The successful contractor must provide performance and payment bonds for 100 percent of the contract price and maintain comprehensive general liability insurance of 2 million dollars per occurrence and 4 million dollars aggregate. The work must be substantially completed within 180 calendar days from the Notice of Award. Contractors are required to pay prevailing wages per the California Labor Code and adhere to strict hazardous material handling and disposal protocols. Project administration requires a progress schedule submitted as a Gantt chart, and the contractor must notify the District Engineering Office four working days prior to starting work for inspection. Payment is processed via Progress Payment Requests, with the District paying interest on undisputed payments not made within 30 days.

General Info

CIP piping replacement at Baker Water Treatment Plant; bids due October 15, 2026.

Place of Performance

Baker Water Treatment Plant, 50 Civic Center Drive, Lake Forest, CA 92630, CA, USA

Set-Aside

NONE

Documents

5
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstrfb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Engineering Department of Irvine Ranch Water District
Contacts1 person available
OfficeCA, USA

Full Description

Show more
Scope: The project includes but is not limited to, the demolition of floor slabs and walls, modifications to existing drain line and cleanout, trenching and installation of new CIP concrete containment trench, removal of existing CIP piping, modification of air release valve discharge piping and supports, installation of new CIP Piping and support, and coating of new concrete trench and CIP piping. Project also includes touch-up coating along eyewash station piping.
Bid Bond: 10.00%

More opportunities from California → Engineering Department of Irvine Ranch Water District

Same awarding agency

NAICS: 237110
SLED
Wells 6, 12, 14, and 15 Site Improvements
Solicitation # 11570
Project No. 11570 involves site improvements for Wells 6, 12, 14, and 15 for the Irvine Ranch Water District in Santa Ana, California. The scope of work includes the removal and replacement of electrical and ventilation equipment, flow meter and instrumentation replacement, structural modifications, and the installation of equipment pads. Civil improvements include 1,900 square feet of pavement replacement and 14,950 square feet of pavement grind and cap. Additionally, the project requires pump and motor replacement at Well 15, with an optional component for downhole rehabilitation involving video surveys, chemical and mechanical redevelopment, and pumping tests. The engineer's estimate for the project is 7,500,000 dollars. Bids must be submitted electronically via PlanetBids by November 18, 2026, at 2:00 PM. Eligible bidders must hold a California Class A contractor's license, comply with California Labor Code prevailing wage rates, and provide CARB certification for in-use off-road diesel-fueled fleets. A 10 percent bid bond is required, and the successful bidder must furnish payment and performance bonds equal to 100 percent of the contract price. The contract will be awarded to the lowest responsive and responsible bidder. Performance requirements include adherence to IRWD General Technical Specifications and NETA ATS-2017 standards for electrical testing, with a 5 percent retention on progress payments.
Water and Sewer Line and Related Structures Construction

POSTED

30 days ago

DEADLINE

in 5 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS