This Solicitation opportunity from California was posted on September 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Baker Water Treatment Plant CIP Piping Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Baker Water Treatment Plant CIP Piping Replacement project, solicitation number 13200, is a construction effort for the Engineering Department of the Irvine Ranch Water District located in Lake Forest, California. The scope of work involves the demolition of existing floor slabs, walls, and Clean-in-Place (CIP) piping, followed by the excavation and installation of a new CIP concrete containment trench. Mechanical requirements include the installation of new CIP piping and supports, modifications to air release valve discharge piping, and the application of high-performance coatings to the new trench, piping, and existing eyewash station piping within the Chemical Building. The project also requires startup testing and the delivery of final record drawings. Bids must be submitted electronically via PlanetBids by 2:00 PM on October 15, 2026, with a mandatory pre-bid meeting on September 30, 2026. The contract will be awarded to the lowest responsive and responsible bidder possessing a current California Class A contractor's license. Mandatory submission requirements include a safety program certification, a non-collusion declaration, and California Air Resources Board certification for in-use off-road diesel-fueled fleets. The successful contractor must provide performance and payment bonds for 100 percent of the contract price and maintain comprehensive general liability insurance of 2 million dollars per occurrence and 4 million dollars aggregate. The work must be substantially completed within 180 calendar days from the Notice of Award. Contractors are required to pay prevailing wages per the California Labor Code and adhere to strict hazardous material handling and disposal protocols. Project administration requires a progress schedule submitted as a Gantt chart, and the contractor must notify the District Engineering Office four working days prior to starting work for inspection. Payment is processed via Progress Payment Requests, with the District paying interest on undisputed payments not made within 30 days.
General Info
Place of Performance
Baker Water Treatment Plant, 50 Civic Center Drive, Lake Forest, CA 92630, CA, USASet-Aside
Documents
5AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 21 days
- Wellhead Treatment Improvement PS102AOpen now, due in 4 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Bid Bond: 10.00%
More opportunities from California → Engineering Department of Irvine Ranch Water District
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
