Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Barkcamp Campstore

Active
https://dam.assets.ohio.gov/image/upload/ofcc.ohio.gov/Project_Opportunities/RFQs/2026/RFQ-DNR-270072-AE.pdfState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Ohio Department of Natural Resources is seeking a Registered Design Professional team for project DNR-270072 at Barkcamp State Park in Belmont County. The project involves the design and construction administration of a new building featuring camp-store retail space, storage, and office areas, as well as the demolition of an existing unused shower house and a hazardous materials assessment. Depending on funding, the scope may expand to include the remodeling of the existing check-in building and landscape improvements, such as an outdoor patio. The selected firm will be responsible for a comprehensive range of services, including the development of a Program of Requirements, schematic design, construction document preparation, and the coordination of regulatory permits with agencies such as the USACE, OEPA, and SHPO. The total project budget is 3,000,000 dollars, with an estimated construction cost of 2,600,000 dollars and a basic professional fee range of 8% to 10%. All work must adhere to the Ohio Facilities Construction Manual, ODNR design guidelines, and accessibility standards including ADA and ABA. The selection process is based on a point-based evaluation of firm qualifications, team experience, and participation in the Encouraging Diversity, Growth and Equity program. The project requires a high degree of coordination with other park-wide infrastructure improvements and necessitates a phased construction approach to maintain camp-store and check-in functionality.

General Info

ODNR seeks design and construction services for the Barkcamp Campstore and site improvements.

Agency

Ohio Department of Natural ResourcesView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

Not specified

Set-Aside

NONE

Documents

(1)

RFQ DNR-270072 Barkcamp Campstore

PDFrfq

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOhio Department of Natural Resources
Contacts1 person available
OfficeN/A
Organization / Agency
Ohio Department of Natural Resources
View Agency Profile
Office AddressN/A
Contacts
Division of EngineeringSubmission Recipient

Full Description

Show more
Project number: DNR-270072
The Ohio Department of Natural Resources (ODNR) manages campgrounds at 76 State Parks, with over 8,970 campsites. This project is a continuation of the ongoing campground improvements that began in 2015. ODNR is seeking professional design services for the design and construction administration required for this project. The design for this project will include investigation and assessments of existing utilities/infrastructure (water, sewer, storm drainage, electric, paving) that will support the planned new building. This assessment will consider the condition of materials, sources of service, capacity, and expansion potential. The intent of the project is to construct a new building that will include camp-store retail space along with storage and office areas as determined during the design process. The project will also raze and remove the existing, unused shower house. Additionally, as funding allows, the existing check-in building, which currently serves as the check-in area, camp store, and office space—will be remodeled to better support the needs of the campground. Public and client use requirements will be defined through the development of a Program of Requirements. ADA accessibility, public appearance, Life Cycle Cost Analysis considerations and the development of potentially multiple creative design concepts will all be incorporated in the design process. Due to the existing building being demolished due to its age, a Hazardous Materials Assessment will be included. Additionally, landscape improvements around the Camp-store and Check-in area to include possible outdoor patio area will be part of the project. Phased construction efforts to maintain Camp-store and Check-in functionality need to be considered throughout the design process. Project team will need to coordinate with other park improvement projects including a parkwide waterline replacement project, parkwide road rehabilitation project and campground improvements. As scope and associated costs are refined, scope and budget may be added or removed as ODNR initiatives and funding allow.
Scope of Services: The development of a Program of Requirements (POR) will be included as part of the Professional Design as an Additional Service. The project scope will be evaluated, prioritized, and defined to align with the project budget. Evaluation of the project construction schedule will also be part of the POR stage. Upon award of the Agreement, the selected firm will commence by developing the Program of Requirements. The selected firm shall apply for and obtain all necessary regulatory permits, maintain current estimates of probable construction costs through the design phase, and provide construction administration services. Permitting and/or coordination with United States Army Corps of Engineers (USACE), United States Fish and Wildlife Service (USFWS), ODNR Dam Safety Program, ODNR Division of Wildlife, Ohio Environmental Protection Agency (OEPA), State Historic Preservation Office (SHPO), and the local floodplain administrators will be required. The selected firm will provide the engineering analysis and calculations needed to advance the design, including structural, geotechnical, and hydraulics engineering. All design and construction shall comply with the current editions of all applicable national, state, and local codes, as well as accessibility standards, including ADA, ICC A117.1, and the ABA Outdoor Developed Areas Guidelines. The Ohio Department of Natural Resources Division of Engineering has developed a set of design guidelines for construction projects. It is expected that all architects, engineers, consultants, and contractors will be familiar with these design guidelines which will serve as the preference for all construction projects when developing final project specifications. A complete set of current guidelines are available at Design Guidelines for Construction Projects | Ohio Department of Natural Resources. (https://ohiodnr.gov/business-and-industry/services-to-business-industry/design-guidelines-all). The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and clarify with the Owner and/or the Contracting Authority, the cost breakdown of the A/E Agreement detailed cost components to address the Owner’s project requirements. Participate in the Encouraging Diversity, Growth & Equity (EDGE) Program as required by statute and the Agreement. As required by the Agreement, and as properly authorized, provide the following categories of services: Program Verification, Schematic Design, Design Development, Construction Document Preparation, develop & maintain estimates of probable construction cost, value engineering, project schedules & construction schedules, Life Cycle Cost Analysis (LCCA) reports, GIS As-built deliverables Bid and Award Support, Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types. Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required for each. A copy of the standard Agreement can be obtained at the OFCC website at https://ofcc.ohio.gov. During the construction period, provide not less than 12 hours (excluding travel time) on-site construction administration services each week, including (1) attendance at progress meetings, (2) a written field report of each site visit, (3) on-site representation comprised of the A/E and its consultant staff involved in the primary design of the project, all having relevant and appropriate types of construction administration experience. For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form F110-330), below is a list of relevant scope of work requirements for this RFQ: 1. Experience with similar scope (campground operation facilities). 2. Experience with environmental permitting and cultural resources assessment services. 3. Ability to manage design and construction projects in an occupied State Park setting. 4. Experience with public facing and architecturally unique building design concepts. 5. Experience with coordinating multiple projects in a occupied area. 6. Ability to design project scope within budget in current market conditions with regional cost factors. 7. Experience with interior design for retail space. 8. Experience managing the State of Ohio contract documents and OAKS CI. 9. Experience with ODNR Capital improvement projects. 10. Experience developing public use facilities able to endure inherent heavy wear and demanding conditions.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is soliciting sub-quotes for the Scattergood GS Units 1&2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing various engineering supports including civil, structural, mechanical, electrical, and instrumentation and controls. Additional requirements include utility locating, potholing, geotechnical and geophysical investigations, BIM/3D modeling, land surveying, LIDAR, drone services, and comprehensive environmental services such as permitting, compliance monitoring, and hazardous materials surveys. Project management needs include CPM scheduling and commissioning and startup planning. Interested firms must contact Lead Estimator Joe Bockelman to receive an Invitation to Bid via the Building Connected system. The bid deadline is September 11, 2026. Responsive bidders must hold a valid California Contractor's license and provide acceptable insurance. Subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with Kiewit agreeing to reimburse the bond premiums. This solicitation specifically encourages participation from certified Disadvantaged Business Enterprises, including MBE, WBE, and OBE firms. Kiewit, a signatory to several collective bargaining agreements, requires bidders to demonstrate an ability to maintain labor harmony on the project.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 1 day
View Details

More opportunities from Ohio Department of Natural Resources

Same awarding agency

NAICS: 541330
SLED
Kelleys Island Campground Showerhouse Replacement
Solicitation # DNR-270075
The Ohio Department of Natural Resources is seeking a Registered Design Professional team to provide professional design and construction administration services for the Kelleys Island Campground Showerhouse Replacement project. This initiative is part of an ongoing campground improvement program and involves the construction of a centrally located, ADA-compliant shower house featuring a family restroom and laundry area, the demolition of two existing shower houses, and the potential renovation or replacement of existing campground restrooms. The scope of work includes comprehensive engineering analysis in structural, geotechnical, and hydraulics disciplines, as well as investigations into existing utilities and infrastructure such as water, sewer, storm drainage, electric, and paving. Due to the age of the structures slated for demolition, a hazardous materials assessment is required. The selected firm will be responsible for a full suite of services, including program verification, schematic design, design development, construction document preparation, cost estimating, and permitting. Coordination with multiple regulatory agencies, such as the USACE, USFWS, OEPA, and SHPO, is mandatory. Because the campground must remain operational during construction, the design must ensure existing facilities remain functional, and the firm must account for the logistical constraints of an island location. During the construction phase, the firm is required to provide at least 12 hours of on-site administration services per week. Evaluation for this contract will be based on a best-value selection process considering experience with similar projects, knowledge of Ohio capital improvements, firm size, and previous team collaboration. Participation in the EDGE program is required, and all work must adhere to ODNR design guidelines and applicable national, state, and local accessibility and building codes.
Engineering Services

POSTED

7 days ago

DEADLINE

in 17 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS