Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on August 8, 2019. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

BARKLEY LOCK EMERGENCY GATE REHAB

Closed
W912P519B0006Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Pennsauken Community Pool Improvements
Solicitation # 2026-BID-15
The Township of Pennsauken, New Jersey, is soliciting bids for the complete rehabilitation and improvement of the Pennsauken Community Pool under solicitation number 2026-BID-15. The scope of work includes significant structural improvements to the pool, the demolition and construction of the pool mechanical room, electrical upgrades, and the installation of plumbing and other general complex upgrades. Specific deliverables include reinforced concrete flooring and walls, sandblasting the pool interior, and the installation of two 25 by 25 foot shade structures. All work must adhere to the 2019 NJDOT Standard Specifications for Road and Bridge Construction, the Americans with Disabilities Act of 1990, and New Jersey Prevailing Wage Act requirements. Bids must be submitted electronically via the OpenGov Procurement Portal by November 10, 2026, at 10:30 AM. The contract will be awarded to the lowest qualified responsible bidder. Submission requirements include a bid bond of 10 percent not to exceed 20,000 dollars, a notarized Non-Collusion Affidavit, a Certificate of Non-Debarment, and signed acknowledgments for Addenda 01 and 02. The successful contractor must provide a performance bond within three days of the contract award. The initial contract period is one year, with a possible one-year extension upon mutual agreement. Payment will be processed through the Township Governing Body following certification by the Township Engineer and the submission of itemized invoices and certified payrolls.
Procurement

POSTED

about 18 hours ago

DEADLINE

in 11 days

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

758 Barkley Dam Rd, GRAND RIVERS, KY, 42045, USA

Set-Aside

SBA

Documents

17

Nashville District Corps of Engineers Foreign National Site Visit Request Form

PDF, Low priority1 page · other
Low

Bid_Abstract_%28s%29.pdf

PDF

Pre_-Solicitation_Synopsis_Final.docx

DOCX

RTA_TPlans_BAR_Emergency_Gate_Rehab_Set_2.pdf

PDF

Solicitation_Amendment_0005_Final.pdf

PDF

TPlans_BAR_Emergency_Gate_Rehab_16_May19_Set_1.pdf

PDF

TPlans_BAR_Emergency_Gate_Rehab__16_May19_Set_2.pdf

PDF

US_Citizen_Pre-Bid_or_Site_Visit_Form_AUG_2014.pdf

PDF

W912P519B0006_0002_-_Barkley_Lock_Emergency_Gate_Rehab_Solicitation_Amendment.pdf

PDF

W912P519B0006_0003_-_Amendment_to_Solicitation.pdf

PDF

W912P519B0006P00001.pdf

PDF

W912P519B0006-P00004.pdf

PDF

W912P519B0006.pdf

PDF

W912P519B0006_RTA_TPlans_Amendment_0003.pdf

PDF

W912P519B0006_RTA_TSpecs_Amendment_0003.pdf

PDF

W912P519B0006_RTA_TSpecs.pdf

PDF

W912P519B0006TSpecs%28p%29.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

16 updates
PhaseClosed
Posted

Sources Sought

Notice updated

Response deadline changed from Feb 1, 2019 to Mar 6, 2019. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The response deadline was removed. Set-aside added: Total Small Business Set-Aside (FAR 19.5). The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Notice updated

Response deadline added: Jul 10, 2019. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Jul 10, 2019 to Jul 17, 2019. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jul 17, 2019 to Jul 19, 2019. The notice description changed.

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Nashville
Contacts2 people available
OfficeNASHVILLE, TN, 37203-1070, USA
Office AddressNASHVILLE, TN, 37203-1070, USA
Contacts
FannieM. RobertsonContract Specialist
Kristal JonesContract Specialist

Full Description

Show more
REQUEST FOR INFORMATION The Government is issuing this Request for Information to determine a competitive basis. This is not a solicitation. No reimbursement will be made for any costs associated with providing information in response to this survey. This survey is for market research purposes only. Only contractors capable of performing this type of work should respond to this Request for Information. Requirement The U.S. Army Corps of Engineers (USACE), Nashville District, anticipates a requirement for a firm fixed-price construction contract for the rehabilitation of the existing emergency gate at Barkley Lock, Grand Rivers, KY. The estimated magnitude of this project is between $1,000,000 and $5,000,000. Summary of work for the Barkley Emergency Gate Rehab Project*: 1. This work involves removal, rehabilitation, and reinstallation of the existing Barkley Lock Emergency Gate. The gate will be removed from the lock chamber by a marine based crane. The gate may be staged adjacent to the lock on Government property to perform the rehabilitation, or the gate may be set on a barge and transported to an appropriate off site location determined by the Contractor and approved by the Government. The gate is comprised of two main structural components. One component is a welded box truss that is approximately 110' long, 15 wide, and 15' tall. The other component is a vertically reinforced skin plate attached to the downstream side of the truss structure. The skin plate is approximately 110' long and 35' tall. The gate weighs approximately 250 tons. The rehabilitation of this gate will involve: ???? - Preparation of the work site (Top soil removal and gravel lay down area); If performing the work on Government property - Preparation of secondary parking / contractor laydown area - Disconnecting all operating machinery from gate - Lifting of gate from the lock using a marine based crane - Erecting a temporary containment structure around the gate if performing the work on Government property, or transporting the gate to the previously approved location. (a) Structural Items: - Removal of the existing cathodic protection system - Removal of the existing grating panels - Removal of the existing coating system (coating contains lead and abatement is required) - Ultrasonic testing of all existing welds - Repair of all welds that do not meet acceptance criteria - Replacement of any structural members identified by the government after the existing coating has been removed - Perform white metal blasting and coat the structure with the 5-E-Z Vinyl System - Provide and install new galvanized grating (b) Mechanical Items: - Fabricate and replace upstream emergency gate greased truss roller bushings (DWG Q9-30/5.3) with underwater greaseless bushings (Contract drawing to be provided once removed and dissembled) - Fabricate and replace upstream emergency gate greased sill roller bushings with underwater greaseless bushings (Contract drawing to be provided once removed and dissembled) - Disassemble and inspect wire rope IAW OSHA 1910.179 (m) - OPTION: Replace wire if conditions exceed OSHA 1910.179 (m) - REPLACE wire rope clamps and pins where corroded. - Disassemble and inspect hoist idler sheave assembly DWG Q9-31/7.3 to include sheave shaft (MK31/7-2) and bushing (MK 31/7-4) IAW with ASME B4.1. - OPTION: Replace/machine sheave shaft (MK31/7-2) and bushing (MK 31/7-4) if found out of tolerance IAW ASME B4.1. - MECHANICAL HYDRAULIC OPTION - Remove Emergency gate hydraulic dogging system DWG (Q9-31/8.3). - Purchase and install replacement hydraulic system IAW EN ISO 4413 to include but not limited to: - Replace 2x hydraulic cylinders - New HPU/reservoir type configuration with condensate heater and ISO filter requirements - Replace all 2" plumbing - Replace all valve with new ISO compliant valves. - Replace cylinder rod position indicator switches. - Replace cylinder rod sleeves and water seals - Replace embedded hydraulic pipe sleeves through walls with Link-Seal* (c) Deconstruct the temporary containment structure around the gate. - Setting the gate back in the lock chamber - Reattaching all operating machinery - Return the site back to original condition The contractor will be required to provide all plant, labor and materials to construct these features. *Please note that this description is subject to change. The anticipated NAICS code is 237990, Other Heavy and Civil Engineering Construction, with a small business size standard of $36.5 million. Survey The Government is issuing this notice to determine a competitive basis. This is not a solicitation and the items listed herein are subject to change or eliminated from the requirement. This survey is for market research purposes only. Only contractors capable of performing this type of work should respond to this Request for Information. Your response to this survey is requested by 3:00 PM Central Time, March 6, 2019. Please send by email to contact@example.gov. 1) Name of your firm: 2) CAGE: 3) Point of Contact, Phone number and EMAIL address: 4) Please provide responses to the following: (a) List one (1) project completed within five (5) years that demonstrates experience, as a prime contractor or subcontractor, erecting and maintaining a temporary facility with a footprint of at least 500 square feet, used for the purpose of particulate containment and controlling environmental conditions (e.g., ambient temperatures and humidity) during media blasting and painting operations of a steel structure. Project Name: Contract Number (if applicable): Year Completed: Prime Contractor or Sub-Contractor: Type and percentage of work self-performed (based on contract value): Dollar Amount: General Description of project: (b) List one (1) project completed within five (5) years that demonstrates experience, as a prime contractor or subcontractor, performing containment and lead abatement during media blasting operations or managing a subcontractor who performed containment and lead abatement during media blasting operations. Project Name: Contract Number (if applicable): Year Completed: Prime Contractor or Sub-Contractor: Type and percentage of work self-performed (based on contract value): Dollar Amount: General Description of project: (c) List one (1) project completed within five (5) years that demonstrates experience, as a prime contractor or subcontractor, applying the specified vinyl coating system (5-E-Z) to a steel structure of at least 1,000 square feet in surface area. Project Name: Contract Number (if applicable): Year Completed: Prime Contractor or Sub-Contractor: Type and percentage of work self-performed (based on contract value): Dollar Amount: General Description of project: (d) List one (1) project completed within five (5) years that demonstrates experience, as a prime contractor or subcontractor, performing structural welding in accordance with AWS D1.5 or managing a subcontractor who performed structural welding in accordance with AWS D1.5) for repairs, retrofits, new fabrication, or additions to steel structures. Project Name: Contract Number (if applicable): Year Completed: Prime Contractor or Sub-Contractor: Type and percentage of work self-performed (based on contract value): Dollar Amount: General Description of project: (e) List one (1) project completed within five (5) years that demonstrates experience, as a prime contractor or subcontractor, lifting a structure of at least 125 tons in a single lift utilizing a crane from a floating plant (or managing a subcontractor who lifted a structure of at least 125 tons in a single lift utilizing a crane from a floating plant). Picks performed from non-floating plant scenarios will not satisfy this criteria. Project Name: Contract Number (if applicable): Year Completed: Prime Contractor or Sub-Contractor: Type and percentage of work self-performed (based on contract value Dollar Amount: General Description of project: 5) For this requirement, what percentage of this work would you subcontract (reference FAR 52.219-14, Limitations on Subcontracting? 6) Do you plan to subcontract to only small businesses? 7) If the answer to question 7 is "yes", are these small businesses with a sub-category (e.g. e.g. HubZone, 8(a), SDVOSB, WOSB, etc.) 8) What is bonding capacity per contract? 9) What is your aggregate bonding capacity per contract? 10) If this requirement is advertised, do you anticipate submitting a bid? 11) Please provide any additional information you feel is necessary:

More opportunities from Department Of Defense → W072 Endist Nashville

Same awarding agency

NAICS: 335313
New
Federal
Supply and Deliver DC and AC Preferred Systems for USACE-LRN
Solicitation # W912P527QA001
The Nashville District of the U.S. Army Corps of Engineers is soliciting a Commercial Firm Fixed-Price contract for the fabrication, assembly, and delivery of DC and preferred AC backup power, electrical distribution, and safety support systems for the J. Percy Priest Dam and Powerhouse. All items must be delivered to the destination in Nashville, Tennessee, on or before June 10, 2027, with a two-week delivery notice required. The procurement falls under NAICS code 335313 for Switchgear and Switchboard Apparatus Manufacturing. Award will be granted to the responsive and responsible offeror providing the lowest price that achieves Successful Technical Conformance, with a 10 percent price evaluation preference applied to HUBZone small businesses and other successful small business concerns. Offerors must be registered in the System for Award Management and submit quotes via the PIEE Solicitation Module by November 5, 2026. Compliance with CMMC Level 1 is required prior to award, and status must be posted in the Supplier Performance Risk System. Due to the presence of Controlled Unclassified Information, including supply layouts and site photos, interested parties must submit specific security access forms for U.S. citizens or foreign nationals to gain access to restricted documents. Technical requirements include adherence to MIL-STD-130 and MIL-STD-129 for item marking and packaging, and factory tests must be witnessed by the Contracting Officer's Representative. Invoicing will be processed through Wide Area WorkFlow in accordance with the Prompt Payment Act.
Switchgear and Switchboard Apparatus Manufacturing

POSTED

1 day ago

DEADLINE

in 6 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS