Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Baron Ranch Post Storm Emergency Access Road and Bridge Repairs

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Santa Barbara County Public Works Department Resource Recovery and Waste Management Division is implementing an emergency repair and cleanup project at Baron Ranch in Goleta, California. The project is a response to severe storm events that occurred between December 23, 2025, and January 3, 2026, which caused significant damage to a vehicle bridge and both paved and unpaved access roads. These roads are critical for public safety, wildfire protection, powerline maintenance, and emergency access. The scope of work involves using heavy and hand-operated equipment to remove mud, silt, rocks, and woody debris, as well as grading dirt roads to restore them to pre-storm conditions. Specific activities include clearing debris from the creek channel around the vehicle bridge and performing all work within existing footprints, with a strict prohibition on road widening, realignment, or expansion. The project is classified under NAICS code 237310 and is statutorily exempt from the California Environmental Quality Act under Section 15269(c) as an emergency project necessary to mitigate natural disaster impacts. Work will be conducted during daylight hours and will be subject to biological surveys and monitoring. Administrative oversight is provided by the Department of Public Works, with John Viggianelli serving as the Engineering Environmental Planner and Travis Spier as the lead agency contact person. The project is essential to restore operational access and prevent further degradation of the ranch's infrastructure.

General Info

Emergency repair and cleanup of roads and bridge at Baron Ranch, Goleta, California.

Agency

California Santa Barbara County Public Works Department Resource Recovery and Waste Management Division

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

14550 Calle Real, CA, 93117

Set-Aside

NONE

Documents

(1)

NOE Baron Ranch Post Storm Emergency Access Road and Bridge Repairs

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Santa Barbara County Public Works Department Resource Recovery and Waste Management Division
Contacts1 person available
OfficeN/A
Organization / Agency
California Santa Barbara County Public Works Department Resource Recovery and Waste Management Division
Office AddressN/A
Contacts
John ViggianelliEngineering Environmental Planner

Full Description

Show more
The proposed project consists of emergency repair and cleanup activities to restore access along existing paved and unpaved access roads and vehicle bridge at Baron Ranch following storm events that occurred between December 23, 2025, and January 3, 2026. These storm events resulted in the deposition of mud, silt, rocks, woody debris, severe erosion, and damage to existing access roads and an onsite vehicle bridge, restricting safe access throughout the ranch. The roads provide access for wildfire fire protection, powerline repair and maintenance, restoration and conservation areas, wells, and for public trail maintenance and emergency access. Emergency repair activities will include the use of standard heavy equipment and hand operated equipment to remove storm-related debris from paved roadways, relocate heavy debris off of existing road surfaces, and grade existing dirt roads to restore pre-storm conditions. All work will occur within the footprint of existing roads/bridge and previously disturbed areas. No road widening, realignment, or expansion is proposed. Some localized work may be required at the vehicle bridge location within the creek channel to remove woody debris that has collected against the upstream side of the bridge and is wedged beneath the bridge structure. Work will be conducted during daylight hours and biological survey and/or monitoring will be conducted prior to or during the emergency repair work. The project is necessary to maintain public and worker safety, restore emergency and operational access, and prevent further damage to existing facilities.

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS