Barrhead Regional Water Commission - Raw Water Valve Chamber Upgrading

Active
02630998International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Barrhead Regional Water Commission is soliciting bids for the Raw Water Valve Chamber Upgrading project located in the Town of Barrhead, Alberta. The scope of work is divided into two distinct pricing options: Option 1 involves the full demolition and replacement of the existing concrete chamber, valves, and piping, while Option 2 focuses on modifying the existing chamber, replacing a pipe spool, installing new valves, and applying epoxy coating to existing piping. Key deliverables include the installation of a watertight concrete roof slab, an access hatch, lighting and heater systems, a new sump pump, and the use of professional divers to isolate raw water reservoir intakes. Bids must be submitted on a unit price basis via the online bidding portal by November 10, 2026. Evaluation factors include the bid price, proposed construction duration, and compliance with bid requirements. Prime bidders are required to hold a valid Certificate of Recognition or Temporary Letter of Certification from the Alberta Construction Safety Association. The contract requires a 10 percent bid security, as well as performance and labour and material payment bonds each valued at 50 percent of the contract price. Construction is scheduled to commence in Spring 2027, with the contractor responsible for adhering to Alberta Environment color coding for piping and maintaining a quality control system aligned with ANSI, ASTM, AWWA, and CSA standards.

General Info

Bids for raw water valve chamber upgrading in Barrhead, Alberta, due November 2026.

Documents

2

Barrhead Regional Water Commission - Raw Water Valve Chamber Upgrading Drawings

PDF, High priority: read this firstspecifications
High

Barrhead Regional Water Commission - Raw Water Valve Chamber Upgrading Specifications

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMPE a division of Englobe
ContactsNo contacts available
OfficeCAN
Organization / AgencyMPE a division of Englobe
Office AddressCAN
ContactsNo contact information available

Full Description

Show more
The main items of Work of this Contract are categorized in two (2) upgrading Options as described below:A) OPTION 1 Upgrading: Replacement of existing concrete chamber, valves and piping1. Demolition of existing concrete chamber, valves and piping. 2. Supply and installation of new concrete chamber, valves and piping.3. Miscellaneous siteworks.B) OPTION 2 Upgrading: Valves replacement within existing concrete chamber1. Modification of existing concrete chamber and replacement of a pipe spool.2. Supply and installation of pipe spool and new valves.3. Epoxy coating of existing piping. Contractor to provide pricing for each Option separately.The Site of the Work of this Contract is located in the Town of Barrhead, AB.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational station featuring mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The contract is a small business set-aside and will be awarded to the responsible bidder submitting the lowest responsive bid. Bids must be submitted using the EJCDC C-410 form and include a bid bond, evidence of signing authority, and MWBE compliance documentation. Performance and payment bonds are required upon award. Project administration follows EJCDC standard general and supplementary conditions, with payments processed monthly via applications for payment reviewed by the Engineer. Final acceptance is contingent upon a substantial completion inspection, the resolution of a punch list, and a final inspection conducted by the Owner, Contractor, and Engineer.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 20 days
View Details

More opportunities from MPE a division of Englobe

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS