Bartle CAPM

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Transportation plans to rehabilitate State Route 89 between post mile 0.0 and 21.1 in Siskiyou County through a comprehensive pavement and infrastructure improvement project. The work includes full-depth hot mix asphalt overlays across the main roadway and connected driveways, installation of 8-foot-wide shoulders with proper backing and slopes between PM 20.02 and 21.02, placement of centerline and shoulder rumble strips, and spot pavement digouts to address localized distress. These measures aim to extend pavement life by at least ten years, improve ride quality, reduce long-term maintenance costs, enhance safety for all travelers, and accommodate cyclists by providing compliant shoulders. The project also addresses outdated or deteriorating Traffic Management System components by installing new traffic monitoring stations with loops and piezoelectric sensors at key locations, and replacing all signs, pavement markers, and delineators to meet current standards. Drainage improvements are a major component, with 44 culverts being rehabilitated using cut-and-cover methods and liner installation, along with minor vegetation removal and temporary access roads constructed at four locations to support the work. Three additional culverts were identified for potential future rehabilitation if funding becomes available. Stormwater management will be addressed through best management practices including infiltration areas, biostrips, and bioswales within the right-of-way to treat runoff from 1.94 acres of new impervious surface created by the shoulder widenings. Construction will occur over two seasons, requiring approximately 150 working days, with staging areas established within existing Caltrans right-of-way at three locations. No permanent land acquisition is anticipated, but temporary easements and encroachment permits will be secured for driveway realignments and culvert work. Permits from the Army Corps of Engineers, California Department of Fish and Wildlife, and Central Valley Regional Water Quality Control Board are expected, and consultation with Indigenous tribes continues throughout the project’s development.

General Info

Rehabilitate SR-89 with asphalt overlays, new shoulders, rumble strips, culvert repairs, and drainage improvements to enhance safety and extend pavement life.

Agency

California → Caltrans, District 2 - Redding

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

State Route 89, post miles 0.0 to 21.1, CA

Set-Aside

NONE

Documents

(1)

Bartle CAPM Project Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 2 - Redding
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 2 - Redding
Office AddressN/A
Contacts
Keith PelfreySenior Environmental Scientist

Full Description

Show more
The California Department of Transportation, using state and federal funding, proposes to rehabilitate State Route (SR) 89 through repaving activities, drainage improvements, and construction of appurtenant infrastructure. The project limits occur between post mile (PM) 0.0 and 21.1, in Siskiyou County. Purpose The purpose of this project is to reduce distressed lane miles, improve ride quality, minimize future maintenance and capital efforts/costs, reduce worker exposure, extend the useful pavement life for a minimum of 10 years, and improve safety and facility reliability for all modes for travel and goods movement. The project would restore the pavement, culverts, and TMS elements to good condition. Need The majority of pavement within the project limits exhibits various forms and levels of distress, including cracking, rutting, and poor ride quality. This pavement condition requires a high level of maintenance activities and costs and will eventually need repairs beyond routine maintenance. In the 2029 delivery year, all lane miles will be in fair condition. Shoulders are nonstandard and do not allow for use by cyclists, who are forced to share the lane with vehicles. Some culverts within the project limits have deficiencies, including rusted inverts, displaced joints, collapsed pipes, or blockages resulting in poor or fair conditions. Other assets within the project limits, including Traffic Management System elements, signs, and striping, are non-standard, do not meet current design guidance, are obsolete, or have a poor or fair condition. Project implementation would include the following improvements: Pavement • Overlay hot mix asphalt over the main roadway from edge of pavement to edge of pavement • Overlay paved driveways and public road connections up to the existing right of way or end of pavement with hot mix asphalt • Install 8-foot-wide shoulders, 3-foot shoulder backing, 4:1 fill slopes, and 2:1 cut slopes on both sides of the highway between PMs 20.02 and 21.02. The new impervious surface area is estimated at 1.94 acres. • Install shoulder backing to support edge of pavement • Perform pavement digouts at spot locations • Install centerline rumble strips along the length of the project and shoulder rumble strips along the shoulder widening limits (PMs 20.02 to 21.02) Signs and Delineation • Replace signs, pavement markers, and roadway delineators in accordance with current standards. Traffic Management System • Install traffic monitoring stations near the intersection of 43N19 Military Pass and 40N44 Middle Falls: o Install four loops, two piezos, and one cabinet at PM 14.42. Work would include minor trenching to connect to the proposed cabinet. o Install two loops near PM 14.19. Drainage As part of the proposed project, 44 culverts occurring along the corridor would be rehabilitated through cut and cover and liner installation. Minor vegetation removal would be required. Temporary access roads would be constructed at PM 1.55, 5.24, 5.39, and 12.47 to facilitate the drainage improvements. An additional three culverts (PM 1.22, 5.90, and 13.62), were evaluated and are included in the environmental clearance. Due to a lack of funding, these culverts were not included in the scope. Should additional funds become available, or as part of a future maintenance effort, the culverts can be rehabilitated with minimal environmental review. Disposal/Borrow Sites Project implementation would include approximately seven acres of ground disturbance; the maximum excavation depth is estimated at 15 feet. Excess soil material and construction debris would become the property of the contractor. An existing disposal site for maintenance activities located at PM 1.5 (eastbound) would be expanded. Stormwater Treatment Best Management Practices The project is located within the Central Valley Regional Water Quality Control Board (RWQCB). Permanent stormwater treatment best management practices (BMP) are anticipated to be required by the RWQCB as the combined acreage for new impervious surfaces, not excluded from the threshold calculation, exceeds 10,000 square feet. New impervious surfaces are estimated at 1.94 acres. Additional stormwater runoff created from the new impervious surface would be treated within existing Caltrans right of way along the shoulder widening section (PM 20.02 to 21.02) utilizing Design Pollution Prevention Infiltration Areas, biostrips, and/or bioswales BMP strategies. Staging Staging activities would occur within Caltrans right-of-way at PMs 1.51 (westbound), 19.52 (eastbound), and 20.56 (eastbound). Utilities No utility conflicts are anticipated. Right-of-Way Caltrans would acquire temporary construction easements at various locations to conform driveways and to accommodate culvert installation. Encroachment permits would be acquired to conform public road connections. No permanent right-of-way take is anticipated. Schedule The work would be completed in two construction seasons and would require approximately 150 working days. Permits Based on the current scope of work, permits are anticipated to be required from the Army Corps of Engineers, California Department of Fish and Wildlife, and Central Valley Regional Water Quality Control Board. Coordination/Consultation Caltrans has performed a review of resource records and databases and consulted with applicable agencies and individuals. Consultation with tribes is ongoing and will continue through project completion.