Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Barton Beach Mobility Mat Installation

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Tahoe Conservancy is managing the Barton Beach Mobility Mat Installation project in South Lake Tahoe, California. The project involves the annual installation of a temporary, seasonal mobility mat, measuring up to 50 feet long by 6.5 feet wide, to provide a stabilized walkway for individuals with varying physical mobility. The mat will extend from an existing dirt trail toward the water and will be in place each year from approximately Memorial Day through Labor Day. As part of the project requirements, the Conservancy will also transfer 488 square feet of restoration credit to El Dorado County Assessor Number 026-023-006. The project is classified as a forecast and is designated as exempt under CEQA Categorical Exemption Section 15301 Class 1, as it involves minor, temporary alterations to existing facilities with negligible expansion of use. Administrative oversight is led by Kristin Anderson, the Recreation and Public Access Planner. The project is located west of the terminus of Lakeview Avenue in South Lake Tahoe. There are currently no specified contract values, formal FAR clauses, or complex evaluation factors, as the documentation primarily focuses on environmental compliance and project scope.

General Info

Seasonal mobility mat installed at Barton Beach Memorial Day to Labor Day, no permanent changes, 488 sq ft credit transferred.

Agency

California → Tahoe Conservancy

Place of Performance

West of the terminus of Lakeview Avenue in South Lake Tahoe, CA 96150, South Lake Tahoe, CA, 96150

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Tahoe Conservancy
Contacts1 person available
OfficeN/A
Organization / Agency
California → Tahoe Conservancy
Office AddressN/A

Full Description

Show more
This project will add a seasonal, temporary mobility mat, up to 50ft long by 6.5 ft. wide, on top of the sand of Barton Beach to create a stabilized walkway for people with varying physical mobility. The mat will extend out from an existing dirt trail towards the water. The mat will be in place between approximately Memorial Day and Labor Day each year. The Conservancy will also transfer 488 square feet of restoration credit to AN 026-023-006.

Similar Contracts

Same NAICS industry code

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS