This Solicitation opportunity from Department Of State was posted on July 31, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Basketball court reconstruction
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The U.S. Embassy Vienna, under the Department of State, has issued a solicitation for the complete reconstruction of a basketball half-court at the U.S. Tri-Mission Marine House in Vienna, Austria. The project involves the demolition and removal of the existing 7x8 meter asphalt court, basketball basket, posts, and outdoor lighting, followed by excavation of a new 13x14 meter foundation pit to a depth of 0.3 meters, including oil removal and proper disposal. The new court will feature a properly prepared subbase and base course with drainage, surfaced with EPDM rubber or an equivalent material, and will include point foundations for one height-adjustable basketball hoop and two reinstalled light poles with updated wiring. Additional work includes laying concrete lawn edging stones, painting court lines, and final site cleanup. The solicitation is identified by number 19AU9026Q0020, posted on July 31, 2026, with proposals due by August 24, 2026, under NAICS code 237990 for other heavy and civil engineering construction. Primary contact is Zahid Raja at rajazm@state.gov, with secondary contact Daniel Worel at woreld@state.gov. The work is to be performed in Vienna, with the contracting office located in Washington, D.C.
General Info
Agency
NAICS
Place of Performance
Vienna, AT-9, AUTSet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
This solicitation is for reconstruction of the basketball half-court at the U.S. Tri-Mission Marine House in Vienna, Austria. The work includes but is not limited to the following tasks – all as specified in the attached Statement of Work:
- Site Installation
- Demolition
- Demolition, removal, and disposal of the existing half-court basketball court (asphalt layer 7 x 8 m) and the basketball basket with posts.
- Excavation, oil removal and disposal of the foundation pit for new basketball half- court dimension (13mx14m = 182m²), 0.3m depth
- Removal of the existing outdoor lighting and reinstallation in a new location
- Construction of a new sports court, half-court basketball court (13 m x 14 m = 182 m²)
- Preparation and installation of the subbase and base course, including drainage
- Installation of the surface layer (EPDM rubber surfacing or equivalent)
- Installation of point foundations for 1 basketball hoop and 2 existing light poles
- Installation of 1 height-adjustable basketball hoop and 2 existing light poles, including wiring/rewiring
- Laying of concrete lawn edging stones
- Painting lines
- Final cleaning
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
