Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on November 4, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Bastrop County Complex HVAC Replacement

Closed
RFP25BCP11BState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project was necessitated by a sprinkler system failure and requires the remediation of all visible and exposed interior components, as well as the cleaning or replacement of damaged theater seating cushions. All work must be performed in accordance with ANSI/IICRC S520 standards, EPA guidelines, OSHA regulations, and the April 11, 2024, Micro Air Inc. Mold Testing report, with Indiana state laws prevailing where more stringent than federal requirements. Key deliverables include the provision of a Certified Industrial Hygienist to conduct daily site visits and a final clearance walkthrough, a detailed remediation plan featuring HEPA filtration and negative air pressure, and the submission of all required permits and licenses. This is a small business set-aside opportunity requiring a single lump sum bid. Award decisions are based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Successful offerors must provide proof of a valid Indiana Contractor's License, Davis-Bacon Act wage rate compliance, and specific automobile and workers compensation insurance naming Adams and Associates, Inc. as an additional insured. The contractor must commence work within 14 days of the Notice to Proceed and provide a sequenced construction schedule within 10 days of that notice. Payment terms are Net 30. Proposals must include a detailed cost breakdown, a timeline for substantial completion, a W9, and a completed vendor questionnaire.
Atterbury Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in 12 days
NAICS: 562910
New
SLED
Environmental Clean-Up Services
Solicitation # IFB-080-3112101-EL
The County of Orange OC Public Works is soliciting bids under IFB-080-3112101-EL for emergency and non-emergency environmental clean-up services. The scope of work involves investigating and addressing pollution incidents, including accidental spills, illegal discharges, and abandoned materials, across unincorporated communities, County roadways, facilities, harbors, parks, beaches, and Flood Control District channels. Key deliverables include containment and recovery, high-pressure washing, waste management, and specialized remediation such as trauma scene and blood-borne pathogen decontamination. The contract has a not-to-exceed ceiling of 1,500,000.00 dollars, with payments made net thirty days in arrears based on quoted unit rates for labor, equipment, and materials. Qualified contractors must hold California State Contractor License Board Class A and HAZ certifications, maintain a valid U.S. EPA Identification Number, and ensure staff are HAZWOPER certified. Emergency response requirements are stringent, requiring resource confirmation within 10 minutes, a field supervisor on-scene within 30 minutes, and full mobilization within 90 minutes. Bids will be awarded to the lowest responsive and responsible bidder, with preference percentages applied to certified OCLSB and DVBE businesses. Submissions must be made electronically via the OpenGov portal by November 4, 2026, at 2:00 PM PT. Awardees are required to provide a Faithful Performance Bond and a Labor and Material Payment Bond, and must comply with California prevailing wage laws and OSHA safety standards.
OC Public Works

POSTED

1 day ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The Bastrop County Complex HVAC Replacement project involves comprehensive upgrades to the HVAC systems across multiple buildings, including the courthouse, annex, and outside mechanical plant in Bastrop, Texas. The scope encompasses removing and restoring building assemblies as needed, extending an existing stair in the annex to access the roof, and constructing a metal-framed penthouse enclosure with a metal roof deck, siding, and TPO roofing. Structural steel modifications are required to support rooftop HVAC units and the new stair penthouse. Additionally, the work includes repairing the exterior envelope to ensure weather-tightness, performing asbestos and lead abatement concurrently with construction, and limited site work such as demolition and restoration of below-grade HVAC lines. The project emphasizes adherence to updated specifications, weatherproofing, and environmental safety standards, with detailed technical and architectural revisions outlined in multiple addenda. The solicitation, issued by Bastrop County, Texas, under RFP25BCP11B, is targeted at contractors capable of delivering HVAC replacement services with an estimated contract value between two and five million dollars. The procurement process includes several addenda that modify the original bid documents, extend the proposal deadline to December 9, 2025, and clarify specifications for materials like metal wall panels and mechanical equipment. The project manual and construction drawings are available for download, but specific contract clauses, evaluation criteria, and detailed pricing information are not included in the provided documents. The contract will likely require compliance with federal and state environmental regulations, insurance, bonding, and site-specific safety protocols. The primary point of contact is Leon Scaife, who can be reached via email and phone for further inquiries. Overall, the project aims to modernize the HVAC infrastructure of the county’s courthouse complex while ensuring environmental safety, structural integrity, and weather resistance.

General Info

Place of Performance

TX, USA

Set-Aside

NONE

Documents

4

Addendum 3 - RFP 25BCP11B - HVAC Replacement Bastrop County Complex

PDF, High priority: read this first28 pages · amendment
High

Addendum No. 1 for Bastrop County Complex HVAC Replacement

PDF, High priority: read this first9 pages · amendment
High

Addendum No. 2 for Bastrop County Complex HVAC Replacement

PDF, High priority: read this first36 pages · amendment
High

RFP 25BCP11B - Bastrop County Complex HVAC Replacement

PDF, High priority: read this first1 page · rfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Dec 9, 2025 to Dec 2, 2025. NAICS code changed from 238120 to 562910.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Bastrop County
Contacts1 person available
OfficeN/A
Organization / AgencyTexas → Bastrop County
Office AddressN/A

Full Description

Show more
HVAC, Base work includes replacement of the HVAC systems in thecourthouse including the addition/extension, the outside mechanical plant, and the Annex buildingthroughout. Remove and restore building assemblies throughout as required to complete thereplacement of the HVAC system. Extend one existing stair in the Annex building to access the roofincluding a light gauged metal framed penthouse enclosure with metal roof deck, metal siding, and TPOroofing. Structural steel modifications to Annex building to support new stair penthouse and new steeldunnage to support roof top HVAC units. Modification and repairs to exterior envelope for roof and wallpenetrations for weathertight assembly. Site work limited to demo and installation of below grade HVAClines, and restoration of site affected by HVAC work. Asbestos and lead abatement coincident to thework of this contract.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS