Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on July 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Battery Energy Storage System (BESS) Relocation

Closed
W50S8D26QA015Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract solicitation W50S8D26QA015, titled Battery Energy Storage System (BESS) Relocation, is a first-time requirement with no incumbent contractor and is set aside entirely for small businesses under FAR 19.5. The scope involves relocating a single Generac Model SBE500 BESS unit weighing 27,062 pounds from a contractor-owned storage lot near Dover Air Force Base, Delaware, to Hangar 101 at Stewart Air National Guard Base in Newburgh, New York, with a firm performance period from August 17 to September 30, 2026. The contractor is solely responsible for all aspects of the move, including visual inspection and documentation of the unit’s condition before and after transport, secure loading and offloading using contractor-provided equipment, and placement on dunnage to protect the ground surface—no government-provided cranes, forklifts, or lifting devices will be available. The contractor must also ensure compliance with UN 38.3 transport standards and provide supporting documentation including the Safety Data Sheet and emergency response information, all while adhering to Wage Determination 2015-4159, Revision 32, for labor compensation. Packaging, preservation, and marking are not prescribed by the government, leaving the contractor to determine appropriate methods capable of supporting the load and safeguarding the lithium-ion battery system during transit, with an implied expectation of adherence to DOT and IATA hazard communication standards. Proposals must be submitted via email to Kevin Fenner by August 6, 2026, and are evaluated against the detailed requirements in the attached Performance Work Statement and technical exhibits including the BESS image and manufacturer spec sheets. The place of performance is officially listed as Newburgh, NY, with no CLINs or pricing structure provided, meaning contractors must propose complete pricing for the full scope without government-furnished cost estimates. Payment details, accounting codes, invoicing procedures, and formal evaluation factors are not specified, and no COR, COTR, or PCO is named, though Kevin Fenner serves as the primary point of contact for all submissions and inquiries.

General Info

Relocate Generac BESS from Delaware to New York; small business set-aside; contractor provides all equipment and handling.

Agency

Department Of Defense → W7NR Uspfo Activity Nyang 105View Agency

NAICS

488510 - Freight Transportation ArrangementView NAICS

Place of Performance

Newburgh, NY, 12550, USA

Set-Aside

SBA

Documents

(7)

Solicitation W50S8D26QA015 Battery Energy Storage System Relocation

PDFrfq

Performance Work Statement for Battery Energy Storage System Relocation

PDFperformance-work-statement

Generac SBE500 Lithium-Ion Battery Energy Storage System Specification Sheet

PDFspecifications

Questions and Answers - BESS Relocation

DOCXq-and-a

Questions and Answers for BESS Relocation

DOCXq-and-a

Dover+BESS+Picture.png

PNG

Wage Determination No. 2015-4159 Revision 32 for New York Orange County

PDFwage-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

3 updates
PhaseClosed
Posted

Combined Synopsis

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Amendment 3

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W7NR Uspfo Activity Nyang 105
Contacts2 people available
OfficeNEWBURGH, NY, 12550-5042, USA
Organization / Agency
Department Of Defense → W7NR Uspfo Activity Nyang 105
View Agency Profile
Office AddressNEWBURGH, NY, 12550-5042, USA

Full Description

Show more

27 July 2026  -Edited to add Questions and Answers.


21 July 2026  -Edited to add Questions and Answers.


21 July 2026 - Edited to add Wage Determination.


There is NO incumbent contractor or existing contract in place for this requirement. This is a first time requirement. 


Relocation of a Generac Model SBE500 Battery Energy Storage System (BESS) from a contractor storage lot in the vicinity of Dover Air Force Base (AFB), Delaware, to a designated site at Hanger 101, Stewart Air National Guard Base (ANGB), New York. Contractor will be responsible for, but not limited to: visually inspecting BESS and documenting, load and transfer BESS to 12550, off load BESS on dunnage provided by the contractor for BESS to ensure no damage to the ground surface. All other requirements for this project are listed in the attached Performance Work Statement (PWS). I've also attached a picture of the BESS and the spec sheets. NOTE: the contractor is responsible for loading and offloading the BESS. The government will NOT supply a crane, forklift, or any other means to perform this task. Loading and offloading the BESS is the responsibility of the contractor.  
 

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS