Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on June 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Bayshore Bikeway Segment 5 and Connections (PLA project)

Closed
CIP No. 19-24State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
2027030
Solicitation # 2027030
Spartanburg County Government is soliciting proposals for the New Cut Road Intersection Improvements at Mount Zion and Blackstock Roads under RFP 2027030. The project involves comprehensive roadway realignment and infrastructure updates, including grading, drainage installation, and the application of hot mix asphalt surface and intermediate courses. All construction must adhere to the latest SCDOT Standard Specifications and Drawings, with specific requirements for thermoplastic pavement markings and strict compliance with the Manual on Uniform Traffic Devices and the SCDOT Work Zone Traffic Control Manual. The project has a specified completion deadline of October 31, 2027, and requires the prime contractor to be SCDOT approved. The contract will be awarded to the responsive and responsible proposer based on a weighted evaluation of cost at 80 percent and compliance with proposal requirements at 20 percent. This is a unit price bid covering all labor, materials, and equipment. Selected contractors must provide a one-year written warranty for materials and workmanship and maintain insurance as required by the county. Administrative terms include a 60-day proposal validity period, a drug-free workplace requirement per South Carolina law, and a five-year record retention policy for audits. Payment is made from appropriated funds, with undisputed invoices due upon receipt and considered past due after 30 days.
Spartanburg County Government

POSTED

about 2 hours ago

DEADLINE

in 2 days
NAICS: 237310
New
Opportunity to quote asphalt repairs_Laura Street Sewer Improvements Project
Solicitation # opportunity-quote-asphalt-repairslaura-street-sewer-improvements-project
D.R. Phillips, LLC is soliciting quotes from qualified asphalt paving contractors for the Laura Street Sewer Improvements project located in Robbinsville, North Carolina. This request is specifically for bidding purposes to help the prime contractor prepare their project bid. The scope of work includes asphalt pavement replacement, restoration, milling, removal, and the placement of surface and binder courses. Additionally, contractors will be responsible for pavement patching, trench restoration, hauling, compaction, and the application of tack coats, along with other incidental asphalt-related tasks necessary for project completion. Interested parties must submit their proposals by November 27, 2026. Submissions should include company contact information, itemized pricing for the asphalt work, equipment and workforce availability, and evidence of relevant experience with municipal sewer, utility, and roadway restoration projects. While all contractors are encouraged to apply, there is a strong emphasis on participation from SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone Small Businesses, as well as DBE and MBE certified firms. Project plans and specifications are available upon request, and a quick payment agreement will be included.
D.R. Phillips, LLC

POSTED

about 2 hours ago

DEADLINE

in 9 days
NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additionally, the project requires surface improvements including asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services like storm water pollution prevention. Required materials range from ready mix and precast concrete to manhole materials and various valves and gaskets. This solicitation is specifically targeting qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise firms, including MBE, VBE, and OBE certifications. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. The response deadline is December 16, 2026, and interested parties should coordinate through Lead Estimator Ken Johnston via the Building Connected system.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 28 days
NAICS: 237310
New
SLED
Construction On State Highway In Napa County Near Calistoga At No Name Creek Bridge
Solicitation # 04-2J88U4
The California Department of Transportation has issued solicitation 04-2J88U4 for construction work on the State Highway in Napa County near Calistoga at the No Name Creek Bridge. With an estimated project cost of 880,000 USD, the scope of work focuses on bridge scour repair, including the use of shotcrete for scour holes and partially grouted rock slope protection. Additional requirements include the installation of a Midwest Guardrail System, culvert cleaning, structure excavation, and extensive landscaping and erosion control involving hydroseeding, fiber rolls, and soil amendment. The project also necessitates the removal of existing guardrails and thermoplastic traffic stripes, which are handled as hazardous waste. Performance is subject to strict environmental and regulatory constraints, including a restricted work window within creek channels from June 15 to October 15. Contractors must comply with prevailing wage laws and meet a 5 percent goal for both Small Business Enterprise (SBE) and Disabled Veteran Business Enterprise (DVBE) participation. Technical standards require that temporary concrete barriers be fabricated at authorized facilities and that local materials meet specific pH and lead concentration limits. Administrative requirements include the submission of a baseline schedule, weekly working days reports, and electronic payroll records via LCPtracker Pro. Bids are due by December 15, 2026, and must be submitted on a unit price basis.
California Department of Transportation

POSTED

about 3 hours ago

DEADLINE

in 28 days
NAICS: 237310
New
SLED
NHANG PEASE AIR NATIONAL GUARD BASE – PAVEMENT REPAIRS
Solicitation # RFB-DMAVS-2027-05
The New Hampshire Department of Military Affairs and Veteran Services is soliciting bids for pavement repairs at the NHANG Pease Air National Guard Base, specifically targeting the Building 158 roadway, the Contract Gate, and the Building 145 parking lot. The project requires the contractor to provide all necessary materials, tools, and safety devices to ensure smooth, stable, and properly compacted pavement with positive drainage and safe transitions. Key deliverables include a proposed work schedule, traffic-control and quality-control plans, asphalt mix-designs, and comprehensive closeout documentation including a marked repair-area plan and warranty information. Award eligibility is based on the lowest cost among vendors who meet the established criteria, including having a completed Vendor Application Package on file with the NH Bureau of Purchase and Property, meeting Federal System for Awards Management (SAM) requirements, and providing proof of comprehensive general liability insurance. The contract is governed by State of New Hampshire Form P-37 and modified by Exhibit A, requiring both performance and payment bonds equal to the contract price. Compliance with the Davis-Bacon and Related Acts, the Buy America Preference, and various federal non-discrimination statutes is mandatory. Payments are processed monthly via bank draft or electronic funds transfer, with a 5% retainage deducted from partial estimates until final project completion. Bids must be submitted by December 14, 2026.
Department Of Military Affairs & Veteran Services

POSTED

about 3 hours ago

DEADLINE

in 27 days

AI Contract Overview

Show more

The contract involves the comprehensive construction of a bikeway network, pedestrian enhancements, vehicle safety features, and supporting infrastructure improvements across four interconnected segments within the City of National City, California. The first segment, the Marsh Segment, covers improvements along Paradise Marsh and Marina Way, starting from the existing Bayshore Bikeway connection and extending north to the intersection of Marina Way and Bay Marina Drive. The second, the 5th Segment, includes upgrades on Harrison Avenue north of Marina Way, along 23rd Street between Harrison and McKinley Avenues, on McKinley Avenue between 23rd and 14th Streets (excluding a section between 20th and 18th Streets), and under the I-5 southbound on-ramp, as well as along Harbor Drive between Civic Center Drive and BNSF’s right-of-way. The Railroad Segment focuses on enhancements within BNSF’s right-of-way near the railroad crossing on Harbor Drive, while the W 19th Street Segment involves improvements on 19th and 18th Streets between Wilson Avenue and McKinley Avenue, including sections of McKinley Avenue between 20th and 18th Streets. The project solicitation, titled "Bayshore Bikeway Segment 5 and Connections," was issued on June 26, 2025, with a response deadline of July 22, 2025. The contract is valued between five million and fifteen million dollars and is managed by the City of National City, California. The NAICS code associated with the project is 237310, indicating a focus on highway, street, and bridge construction. The primary point of contact for the project is Luca Zappiello, reachable via email or phone, and further project details can be accessed through the designated vendor portal.

General Info

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 2027030Open now, due in 3 days
  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 10 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of National City
Contacts1 person available
OfficeN/A

Full Description

Show more
The general scope of work is the construction of a complete bikeway network, pedestrian improvements, and vehicle travel safety components, and supporting infrastructure improvements along four joined segments: 1. MARSH SEGMENT: consists of improvements along the Paradise Marsh, and on marina Way, starting at the connection with the existing Bayshore Bikeway at the southern limits of the project, traveling north to the intersection of Marina Way and Bay Marina Drive.2. SEGMENT 5 SEGMENT: consists of improvements on Harrison Avenue north of the intersection of Marina Way and Bay Marina Drive, on 23rd Street between Harrison Avenue and McKinley Avenue, on McKinley Avenue between 23rd Street and 14th Street (except between 20th Street and 18th Street), under the I-5 southbound on-ramp, parallel to Harbor Drive between the intersection with Civic Center Drive and BNSF’s right-of-way3. RAILROAD SEGMENT: consists of improvements within BNSF’s right-of-way near the crossing of the railroad tracks on Harbor Drive.4. W 19th St SEGMENT: consists of the improvements on 19th Street and 18th Street between Wilson Avenue and McKinley Avenue, and on McKinley Avenue between 20th Street and 18th Street.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS