Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Bayside Village Marina LLC (BVM) - Back Bay Landing (BBL) Bayfront Stabilization and Improvement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Newport Beach

Place of Performance

E Coast Hwy and N Bayside Drive, Newport Beach, CA, 92660

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Newport Beach
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Newport Beach
Office AddressN/A
Contacts
Joselyn PerezSenior Planner
David CrookProject Manager

Interested Companies (1)

Environmental Science AssociatesLos Angeles, CA

Full Description

Show more
The Project aims to address deteriorating infrastructure and enhance the existing marina while increasing marina parking and expanding public access and recreational opportunities at the Back Bay Landing (BBL) site. Key components include the replacement of the existing Bayside Village Marina (BVM) seawall, originally constructed in 1958, and the extension of this seawall along the BBL bayfront, which would terminate under the Bay Bridge near a proposed gravity wall on the south bayfront. Additionally, the Project would involve upland soil stabilization to mitigate seismic lateral spreading, marina dock and boat slip extensions to add 67 wet slips, and maintenance dredging within the basin. It would also incorporate ADA-compliant features, such as accessible gangways and increased surface parking. Furthermore, the Project would identify and offer to dedicate public access easements along the perimeter of the new seawalls to facilitate future construction of public bayfront promenades and bike paths as outlined in the BBL Planned Community Development Plan. The existing approximately 100-year-old BC 09 City water main that runs through the BBL site and crosses under the Newport Channel to Lower Castaways Park would be replaced and relocated.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
2026-0011
Solicitation # 48935
The Cornerstone of Centerville South Phase I Public Improvements project is a civil and electrical construction solicitation issued by the City of Centerville, Ohio. With an engineer's estimate of $4,973,490.39, the project focuses on essential infrastructure including roadway extensions, sanitary sewer and water main installation, and comprehensive site electrical work. The electrical scope is a design-build effort encompassing the installation of light poles, fused and non-fused connector kits, and weather-resistant GFI receptacles. Civil requirements include the construction of concrete drive aprons with aggregate bases, pavement markings, and the installation of an irrigation system. All work must adhere to ODOT specifications, the Ohio Building Code, and NFPA Standard 70. This is a unit price contract awarded to the lowest and best bidder, with a project completion deadline of September 30, 2027. Bidders must submit proposals electronically via Bid Express, including a bid bond for the full amount or a 10% certified check. The successful contractor is required to provide a 100% performance bond and maintain liability insurance limits of $2,000,000 per occurrence for CGL and $1,000,000 for auto and workers compensation. Payment is structured as one partial payment per month, subject to a 6% retainer and the submission of certified payroll reports to ensure compliance with Ohio Prevailing Wage laws. Final acceptance is determined by the City and its Construction Manager, Oberer Construction Managers Ltd.
City of Centerville

POSTED

about 10 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237990
New
Federal
RESERVE BASIN MAINTENANCE DREDGING CONTRACT FOR SITES AT THE PHILDELPHIA NAVY YARD IN THE PUBLIC WORKS DEPARTMENT PENNSYLVANIA AREA OF RESPONSIBILIY
Solicitation # N4008526B0002
Solicitation N4008526B0002 is a sealed bid for maintenance dredging at the Philadelphia Navy Yard, specifically within the North Side (Wharf N) of the Reserve Basin and the Schuylkill River Access Channel. The project requires the removal of approximately 96,611 cubic yards of sediment using a sealed environmental clamshell bucket to ensure safe vessel maneuverability for the decommissioning of US Naval vessels. Dredging must reach a minimum depth of -30 feet MLLW, with a maximum over-dredge depth of -32 feet MLLW. The contract is a firm-fixed-price lump sum award based on the most advantageous price and price-related factors, with a total performance period of 270 calendar days from the date of award receipt. Key operational constraints include a strict environmental window prohibiting dredging between March 1 and June 30, 2026, and a required minimum daily production rate of 2,500 to 5,000 cubic yards. The contractor is responsible for disposing of dredged material at approved offsite facilities, with pre-acceptance letters indicating capacity at sites such as Biles Island. Compliance requirements include adherence to the Davis-Bacon Act for prevailing wages, strict quality control management involving independent third-party teams, and the use of the PIEE Solicitation Module for all electronic bid submissions. Award is subject to a responsibility determination involving the review of financial statements, bonding capacity, and past performance on similar dredging projects.
Navfacsyscom Mid-Atlantic

POSTED

about 11 hours ago

DEADLINE

in 3 months
View Details
NAICS: 237990
New
Federal
GIWW Freeport to Matagorda Maintenance Dredging
Solicitation # W912HY26BA021
Solicitation W912HY26BA021 is a firm-fixed-price contract issued by the US Army Corps of Engineers, Galveston District, for maintenance dredging of the Gulf Intracoastal Waterway from Freeport to Matagorda Bay, Texas. The project, with an estimated value between $10 million and $25 million, involves the removal of shoaled materials across Brazoria, Matagorda, and Calhoun Counties. The scope is divided into a base schedule and four options, with Schedule 1 requiring the dredging of approximately 345,000 cubic yards between Freeport Harbor and the Brazos River, plus 51,000 cubic yards at the Brazos River Crossing. Additional options include dredging the channel to Palacios, the Colorado River, and boathouses at the Brazos River Floodgates and Colorado River Locks. The performance period for the base work is generally 210 to 220 calendar days from the Notice to Proceed. Contractors must adhere to strict technical specifications, including the use of the Texas State Plane Coordinate System NAD83 and compliance with EM 385-1-1 safety standards and EM 1110-2-5025 for dredged material management. Contract administration requires the use of the Resident Management System and the Construction Management Platform for quality control and deficiency tracking. Bids must be submitted via the PIEE Solicitation Module, and the successful awardee must provide performance and payment bonds within five calendar days of the award. Payment is processed electronically through the Wide Area WorkFlow system.
W076 Endist Galveston

POSTED

about 11 hours ago

DEADLINE

in 10 days
View Details
NAICS: 237990
New
Federal
Webbers Falls Excitation System Replacements
Solicitation # W912BV26RA029
Solicitation W912BV26RA029 is a Request for Proposal issued by the Department of Defense, specifically the US Army Corps of Engineers Tulsa District, for the design and installation of three excitation systems at the Webbers Falls Powerhouse in Oklahoma. The scope of work includes the demolition of existing equipment and the installation of new full inverting potential source rectifier exciters featuring microprocessor digital controllers and power potential transformers. The project requires the systems to operate in environmental conditions up to 40 degrees Celsius and 95 percent relative humidity. Key deliverables include the equipment, comprehensive O&M data packages, field test reports, personnel training, and duplicate spare parts. The performance period is 300 calendar days from the date of the notice to proceed. Award will be determined using the Lowest-Price, Technically Acceptable process, where the lowest evaluated price is selected among proposals meeting minimum technical standards. To be deemed acceptable, prime contractors must demonstrate experience with at least three similar projects completed within the last five years, with at least one project valued over 2 million dollars. Technical requirements include compliance with NFPA 70 and IEEE C2 standards, the development of a Construction Quality Control Plan, and adherence to MIL-STD-129 for shipment and storage marking. Additionally, the prime contractor must possess a Facility Clearance and ensure personnel complete required Information Assurance and CUI training. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment portal by October 23, 2026.
W076 Endist Tulsa

POSTED

about 11 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237990
New
Federal
Fall River Lake and Dam Damsite Park Lagoon Repair
Solicitation # W912BV26QA095
Solicitation W912BV26QA095 is a request for quotations from the U.S. Army Corps of Engineers, Tulsa District, for the repair, reconstruction, and modernization of the Damsite Park wastewater lagoons at Fall River Lake in Fall River, Kansas. This total small business set-aside will be awarded as a firm-fixed-price contract to a responsible offeror based on price, past performance, and conformance with subcontracting regulations. The project scope includes the removal and disposal of wastewater, earthwork and slope reconstruction to a strict 3:1 ratio, the installation of a new 60 mil HDPE liner complying with KDHE regulations, and the replacement of perimeter security fencing. The primary requirement focuses on the north westerly facing lagoon, with an optional secondary bid for the south easterly facing lagoon. The period of performance is scheduled from October 15, 2026, to April 13, 2027, with all work to be completed within 180 calendar days of the Notice to Proceed. Contractors must adhere to EM 385-1-1 safety standards, provide personnel with OSHA 30 and CPR certifications, and ensure all staff are E-Verified. A critical responsibility requirement is the submission of a National Institute of Standards and Technology score in the Supplier Performance Risk System; failure to provide this score will result in a non-responsible determination. Quotes must be submitted via the PIEE Solicitation Module by October 13, 2026, at 2:00 P.M. CST. Award is contingent upon the availability of appropriated funds and requires an active registration in the System for Award Management.
W076 Endist Tulsa

POSTED

about 11 hours ago

DEADLINE

in 11 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS