RESERVE BASIN MAINTENANCE DREDGING CONTRACT FOR SITES AT THE PHILDELPHIA NAVY YARD IN THE PUBLIC WORKS DEPARTMENT PENNSYLVANIA AREA OF RESPONSIBILIY
Open
N4008526B0002Federal
Response Deadline
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
This project involves maintenance dredging of approximately 96,611 cubic yards of sediment within the North Side (Wharf N) of the Reserve Basin and the Schuylkill River Access Channel at the Philadelphia Navy Yard. The primary objective is to ensure that river pilots can safely maneuver vessels into the Reserve Basin berths, which are used to decommission US Naval vessels, by maintaining a minimum depth of -30 MLLW and a maximum over-dredge depth of -32 MLLW. The work requires the use of a sealed environmental clamshell bucket, with dredged spoils to be transported and disposed of at either the Weeks Marine Whites Rehandling Basin in New Jersey or the Waste Management Corporation Biles Island site in Pennsylvania.
The contract is a sealed bid procurement with no set aside used, where the award will be made to the low responsible bidder. The period of performance is 270 calendar days from the date of award receipt, with a specific work restriction from March 1 to June 30 to protect fish migrations. Bidders must submit their proposals in PDF format via the PIEE Solicitation Module. To be determined responsible, the low bidder must provide detailed personnel and management plans, evidence of financial resources through bank references and three years of financial statements, and a summary of past performance on similar dredging projects. The contract is subject to the Davis-Bacon Act and requires the submission of a comprehensive Quality Control plan for government approval prior to the start of construction.
General Info
Maintenance dredging of 96,611 cubic yards at Philadelphia Navy Yard via sealed bid.
PDF, High priority: read this first1 page · amendment
HighAI Summary for AMEND0003 Material Acceptance Letter for NAVFAC Dredging: This document dated August 4, 2025, is an amendment letter from Weeks Marine, Inc. to EA Engineering regarding material acceptance for the NAVFAC Maintenance Dredging project at the Philadelphia Navy Yard Reserve Basin. It confirms Weeks Marine's capacity to receive approximately 72,100 cubic yards of dredged material, contingent upon sediment chemical characterization approval, required approvals, and commercial terms satisfaction. The letter serves as a formal communication related to contract modifications for material handling.
PDF
PDF, High priority: read this first18 pages · amendment
HighAI Summary for AMEND0003 Rev Spec Section 01 45 00 Quality Control for PNY Reserve Basin FY26 Maintenance Dredging: This document is Amendment 0003, Revised Specification Section 01 45 00, dated 08-11-2026, for the PNY Reserve Basin FY26 Maintenance Dredging project (contract 1783178). It details the Quality Control requirements including references to ASTM standards and USACE safety regulations, payment terms, submittal procedures, and the establishment and maintenance of a Quality Control program. The amendment outlines roles, meetings, coordination, and documentation necessary to ensure compliance with contract quality standards throughout construction operations.
PDF
PDF, High priority: read this first5 pages · amendment
HighAI Summary for Amendment 0001 RFI Responses: This document is Amendment 0001 containing responses to a Request for Information (RFI) related to a dredging project. It addresses clarifications on survey data, disposal site instructions, contractor responsibilities for fees, permit updates, and project management requirements. The amendment confirms waivers for certain qualifications, outlines survey and permit procedures, and clarifies disposal site acceptance and contractor obligations. The document is critical for bidders to understand project specifications, compliance, and operational expectations.
PDF
PDF, High priority: read this first3 pages · amendment
HighAI Summary for Amendment 0001 to Solicitation N4008526B0002 - Maintenance Dredging Philadelphia Navy Yard: This document is Amendment 0001 to Solicitation N4008526B0002 for Maintenance Dredging at Philadelphia Navy Yard, Philadelphia, PA. Effective 18 May 2026, it extends the bid due date to 05 June 2026 at 1400 EDT. The amendment includes revised specification pages, a revised description of work removing a paragraph about dredged material disposal, and responses to Requests for Information (RFI). The project involves dredging the west side berthing area of Pier #4 to required depths, disposal of dredge spoils at approved offsite facilities, and a minimum daily production rate of 5,000 CY. The amendment maintains all other terms and conditions of the original solicitation.
PDF
PDF, High priority: read this first3 pages · amendment
HighAI Summary for Amendment 0001 - Updated Construction Quality Control Specifications: This document is Amendment 0001, providing updated specifications for Construction Quality Control (QC) management under the contract. It details the roles, qualifications, and responsibilities of the QC Manager, including experience requirements, training certifications, and language proficiency. It also specifies the duties and qualifications of specialized QC personnel such as the Underwater Quality Control Team and Fire-Protection Quality Control Specialist (FPQC). The amendment emphasizes the need for independent third-party QC teams and outlines the FPQC's professional credentials and responsibilities related to fire protection and life safety systems. This update is critical for ensuring compliance with contract quality and safety standards.
PDF
PDF, High priority: read this first2 pages · amendment
HighAI Summary for Amendment 0002 to Solicitation N4008526B0002 for Maintenance Dredging: This document is Amendment 0002 to Solicitation N4008526B0002 issued by NAVFACSYSCOM MID-ATLANTIC for Maintenance Dredging at Philadelphia Navy Yard, Philadelphia, PA. The amendment, effective 02 June 2026, extends the bid due date from 05 June 2026 to 19 August 2026 at 1400 EDT. It includes instructions for acknowledging the amendment and states that all other terms and conditions remain unchanged. The contracting officer is Brittany N. Cristelli.
PDF
PDF, High priority: read this first4 pages · amendment
HighAI Summary for Amendment 0003 - Nationwide Permit 35 Verification for Naval Reserve Basin Dredging NAP-2024-00345-46: This document is Amendment 0003 dated June 12, 2026, from the U.S. Army Corps of Engineers Philadelphia District. It verifies authorization under Nationwide Permit 35 for mechanical maintenance dredging of the Philadelphia Naval Reserve Basin and access channel, involving up to 96,611 cubic yards of dredged material. The amendment outlines special conditions including compliance with project plans, notification requirements, environmental protections, and disposal site approvals. The authorization is valid until March 15, 2031, subject to compliance with all terms and conditions.
PDF
PDF, High priority: read this first3 pages · amendment
HighAI Summary for Amendment 0003 to Solicitation N4008526B0002 - Maintenance Dredging, Philadelphia Navy Yard: This document is Amendment 0003 to Solicitation N4008526B0002 dated 23 Apr 2026 for Maintenance Dredging at Philadelphia Navy Yard. Effective 13 Aug 2026, it extends the bid due date to 15 October 2026 at 1400 EDT. The amendment includes updated wage determinations PA20260002 and PA20260028, revised specification section 01/45, and responses to RFI #1 with instructions for file submission. Several attachments accompany the amendment, including revised specifications, wage determinations, RFI responses, and other related documents. All other terms and conditions remain unchanged.
DOCX
DOCX, High priority: read this first18 pages · wage-determination
HighAI Summary for Amendment 0003 Wage Determination PA20260002 07-30-26: This document is Amendment 0003 to the Wage Determination PA20260002, dated July 30, 2026, for construction types Heavy and Highway in multiple counties of Pennsylvania. It provides updated prevailing wage rates and fringe benefits for various construction trades such as Boilermaker, Bricklayer, Carpenter, Electrician, and others, specifying rates by county and trade classification. The document includes modification history with publication dates and detailed wage schedules applicable to federal and state construction contracts in the specified regions.
DOCX
DOCX, High priority: read this first7 pages · wage-determination
HighAI Summary for Amendment 0003 Wage Determination PA20260028 05/18/2026: This document is Amendment 0003 to Wage Determination PA20260028, published on May 18, 2026. It covers prevailing wage rates and fringe benefits for heavy construction work in multiple counties across Pennsylvania. The determination includes classifications such as dredging operators, welders, engineers, and boat operators, with specified hourly rates and incentive pay based on certifications and licenses. It also details paid holidays and vacation pay provisions applicable to the covered crafts.
PDF
PDF, High priority: read this first2 pages · amendment
HighAI Summary for Amendment 0004: Amendment 0004 to a solicitation extending the response due date from October 15, 2026, to January 15, 2027. The document also incorporates several DFARS clauses by reference, including restrictions on certain magnets, tantalum, and tungsten, prohibitions relating to Chinese military companies, and prohibitions on the transfer of DoD employee data and procurement of foreign-made UAS.
DOCX
DOCX, High priority: read this first4 pages · bid-schedule
HighAI Summary for Attachment C - Bid Schedule Form FY26 Maintenance Dredging: This document is Attachment C, the Bid Schedule Form for FY26 Maintenance Dredging at the Philadelphia Navy Yard, Philadelphia, PA, Reserve Basin (eProjects WO# 1783178). It details the Contract Line Item Number (CLIN) 0001 base price and its subcomponents (0001AA to 0001AE) including mobilization, bucket dredging, downtime compensation, and debris removal. The schedule notes a work restriction from March 1 to June 30 to protect fish migrations, with dredging to be completed by November 30, 2026. The form requires unit prices and total prices for each CLIN item and specifies award criteria based on total cost for CLIN 0001. The document includes general bid notes and references relevant FAR and DFARS clauses.
PDF
PDF, High priority: read this first3 pages · sow
HighAI Summary for FY 2026 Maintenance Dredging Plans for Reserve Basin Philadelphia Navy Yard: This document is the site plan and statement of work for the FY 2026 maintenance dredging of the Reserve Basin at the Philadelphia Navy Yard, Philadelphia, PA. It includes hydrographic notes detailing survey methods and datums, estimated dredging quantities with contract depths and disposal locations, and dredging and design notes outlining contractor responsibilities such as utility verification, power line protection, and coordination requirements. The document provides critical technical specifications and operational instructions for the dredging project.
PDF
PDF, High priority: read this first375 pages · specifications
HighAI Summary for FY26 Maintenance Dredging Reserve Basin Specifications NAVFAC 1783178: This document contains the specifications for the FY26 Maintenance Dredging project at the Reserve Basin, Philadelphia Navy Yard, Philadelphia, PA, designed by NAVFAC Mid-Atlantic. Dated November 5, 2025, it includes detailed project descriptions, work covered by contract documents, location details, and utility coordination requirements. The document also provides a project table of contents covering procurement, general requirements, and waterway construction divisions, along with a list of contract drawings. Key content includes dredging methods, disposal sites, utility protection, and submittal procedures, essential for contractor compliance and government approvals.
DOCX
DOCX, High priority: read this first12 pages · subcontracting-plan
HighAI Summary for Individual Small Business Subcontracting Plan Template: This document is a template for an Individual Small Business Subcontracting Plan (SBSP) consistent with FAR 19.109 and FAR clause 52.219-9. It is intended for use by large businesses submitting subcontracting plans as part of federal contracts. The template includes sections for contractor information, contract details, and subcontracting goals by business category such as small business, HUBZone, WOSB, SDB, VOSB, SDVOSB, AbilityOne, and Alaskan Native Corporations & Indian Tribes. It also provides instructions for filling in subcontracting percentages and rationale for goals. The plan requires signatures from the contractor, Small Business Professional, SBA Procurement Center Representative, and Procuring Contracting Officer, with provisions for approval if zero goals are set in any category. This template supports compliance with federal subcontracting requirements and facilitates acceptance or rejection of bids/offers based on subcontracting commitments.
PDF
PDF, High priority: read this first4 pages · amendment
HighAI Summary for N4008526B0002 Amendment 0003 RFI Responses: Amendment 0003 to solicitation N4008526B0002 provides detailed responses to Requests for Information (RFIs) related to the contract. Dated around early 2024, it clarifies technical and procedural questions including survey data availability, disposal site usage, quality control team applicability, coordination requirements for utilities and debris handling, and availability of bathymetric and sediment data. The document serves to update and refine contract requirements and instructions for prospective contractors.
PDF
PDF, High priority: read this first40 pages · ifb
HighAI Summary for N4008526B0002 Maintenance Dredging IFB: Sealed bid solicitation SF 1442, Solicitation No. N4008526B0002, issued 23 Apr 2026 for Maintenance Dredging at the Philadelphia Navy Yard, Philadelphia, PA. The document includes the bid opening date of 27 May 2026 at 2:00 PM local time, performance/bond requirements, offer instructions, and the project scope for dredging approximately 96,611 cubic yards in the North Side (Wharf N) of Reserve Basin and Schuylkill River Access Channel. It also references the DPAS priority rating DO-C2 and begins the attached procurement/contract requirements and table of contents.
PDF
PDF, High priority: read this first5 pages · approved-plans
HighAI Summary for NAP-2024-00345-46 Final Approved Plans E1-E5: This document, identified as NAP-2024-00345-46, contains the final approved engineering plans labeled E1 through E5 for a project at White's Residency, Panyang, Bras Basah Hsp, Pulau Ubin, Singapore. Dated 02/10, the plans include detailed technical drawings and sections such as transfer sections through residue and deep beds, transverse sections through access channels, and proposed offflowing at Biles Island. The document provides critical technical specifications and design details necessary for project execution and compliance.
XLSX
XLSX, High priority: read this first2 pages · rfi
HighAI Summary for Pre-Proposal Inquiry Submission Form N4008526B0002 Maintenance Dredging Philadelphia Navy Yard: This document is a Pre-Proposal Inquiry (PPI) Submission Form related to solicitation number N4008526B0002 for Maintenance Dredging at the Philadelphia Navy Yard. It is intended for submitting questions and inquiries prior to proposal submission. The form includes fields for submitter information, submission date, reference details, and specific questions related to the solicitation. This RFI form facilitates communication between potential contractors and the contracting agency to clarify solicitation requirements.
DOCX
DOCX, High priority: read this firstsources-sought
HighAI Summary for Sources Sought - Contractor Information Form: This document is a Sources Sought Contractor Information Form used to collect general information about contractors. It includes fields for UEI number, CAGE code, firm name, address, point of contact details, types of business certifications, bonding capacity details, and space for additional clarifications. The form is intended to be limited to one page and is used to identify potential contractors for future procurement opportunities.
DOCX
DOCX, High priority: read this first5 pages · wage-determination
HighAI Summary for Wage Determination PA20260028 Heavy Dredging Pennsylvania: This document is Wage Determination PA20260028 dated January 30, 2026, for heavy dredging construction work in Pennsylvania statewide. It supersedes PA20250028 and includes classifications and prevailing wage rates for various dredging-related job titles such as Deck Captain, Crane Operator, Welder, and others. The document specifies hourly rates, fringe benefits, incentive pay, and paid holidays. It also references compliance with Executive Orders 13706 and 13658 regarding paid sick leave and minimum wage requirements for federal contractors. The wage determination provides detailed classifications, union and survey rate identifiers, and conditions for adding unlisted classifications after award.
PDF
PDF, High priority: read this first5 pages · wage-determination
HighAI Summary for Wage Determination PA20260028 Heavy Dredging Pennsylvania: This document is Wage Determination PA20260028 dated January 30, 2026, for heavy dredging construction work in Pennsylvania statewide. It supersedes PA20250028 and provides prevailing wage rates and fringe benefits for various classifications of dredging workers, including deck captains, crane operators, welders, and laborers. The document includes incentive pay details, paid holidays, vacation pay, and notes on compliance with Executive Orders 13706 and 13658 regarding paid sick leave and minimum wage requirements for federal contractors. It also explains union rate identifiers and classifications relevant to the wage determination.
PDF
PDF, Low priorityother
LowAI Summary for Biles Island Pre-Acceptance Letter for Dredged Material: May 26, 2026 letter from Waste Management Disposal Services of Pennsylvania, Inc. confirming available capacity in Cell #3 at the Biles Island property for acceptance of 100,000 cys of dredged material for the NAVFAC Reserve Basin Maintenance Project. The letter notes disposal acceptance conditions, including that placement may be delayed until U.S. Army Corps of Engineers work is completed, and references historical use of sediments for landfill cover and capping material.
PDF
PDF, Low priority7 pages · other
LowAI Summary for PIEE Vendor Access Instructions Guide: This document provides step-by-step instructions for vendors to self-register or add roles in the Department of Defense's Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. It explains the two vendor roles available: Proposal Manager and Proposal View Only, detailing the registration process, role addition, and account management. The guide includes sections on getting started, account support, technical support, and a roles and actions/functions matrix to clarify permissions and menu items for each role. The document aims to facilitate secure and automated solicitation submissions and responses within the DoD PIEE platform.
XLSX
XLSX, Low priority1 page · past-performance
LowAI Summary for Project Matrix Past Performance Data: This document appears to be a past performance data matrix related to dredging maintenance and construction projects. It includes fields for project title, location, completion date, firm role (prime or subcontractor), project size and scope, and general information such as small business designation, bonding capacity, UEI, CAGE code, address, number of offices, and employees. The matrix is intended to demonstrate experience with dredging approximately 100,000 cubic yards of sediment using a sealed environmental clamshell bucket. The document is structured as a spreadsheet with multiple rows for project entries.
DOCX
DOCX, Low priority3 pages · sources-sought
LowAI Summary for Sources Sought Notice for Maintenance Dredging at Philadelphia Navy Yard: This Sources Sought Notice from Naval Facilities Engineering Command Mid-Atlantic is a market research tool to identify qualified small businesses for a maintenance dredging project at the Philadelphia Navy Yard. The project involves dredging approximately 96,611 cubic yards of sediment using a sealed environmental clamshell bucket, with disposal at designated sites in New Jersey or Pennsylvania. The notice specifies environmental restrictions, project schedule, and small business participation requirements. It is not a solicitation and no proposals will be requested or accepted at this time. The anticipated contract award is in the second quarter of FY26, with a contract term of about 270 days and an estimated value between $5 million and $10 million. Respondents are requested to submit capabilities packages including relevant project experience and company profile information.
DOCX
DOCX, Low priority1 page · sources-sought
LowAI Summary for Sources Sought Project Information Form: This document is a Sources Sought Project Information Form used to provide supporting information demonstrating project experience relevant to a subject announcement. It allows submission of up to five projects, with details such as contractor name, project number, contract number, delivery/task order number, project title, location, award date, final contract price, completion date, type of work, customer/owner name, point of contact, contract type, and detailed project descriptions. The form is intended to gather information for market research or capability assessment purposes.
The project consists of Maintenance Dredging within the North Side (Wharf N) of Reserve Basin and Schuylkill River Access Channel for the Government sites at the Philadelphia Navy Yard in the Public Works Department Pennsylvania area of responsibility. Maintenance dredging of approximately 96,611 cubic yards of sediment, using a sealed environmental clamshell bucket. Dredging within the Reserve Basin is in support of the Naval Support Activity Mechanicsburg, Philadelphia Navy Yard Annex. The Reserve Basin is being used to decommission various US Naval vessels. For the river pilots to be able to safely maneuver vessels through the Schuylkill River into the Reserve Basin berths and to ensure that tidal cycles will not cause sediment accumulation around the hulls making final removal very difficult, the berths need to be dredged to a minimum depth of -30 MLLW and a maximum over-dredge depth of -32 MLLW.
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.