Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Utah was posted on October 23, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

BD26-39 New Floating Breakwater for Strawberry Marina

Closed
BD26-39State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
C26863031 CASWELL MEMORIAL STATE PARK - Campground and Day Use Improvements
Solicitation # C26863031
The California Department of Parks and Recreation is soliciting bids for contract C26863031 to upgrade the campground and day use areas at Caswell Memorial State Park in San Joaquin County. This lump sum project, with an engineer's estimate between 4.2 million and 5.8 million dollars, requires the contractor to provide all labor, materials, and equipment to perform work including asphalt demolition, clear and grub operations, and AC overlay. The project must be completed within 365 calendar days from the notice to proceed, with a maximum of 30 days allocated for punch list items and final completion. Eligible bidders must hold a Class A and/or B license and be registered with the Department of Industrial Relations per SB 854. Award is based on the low price method, though incentives are provided for Disabled Veteran Business Enterprise participation exceeding the mandatory 6 percent goal, subject to a 100,000 dollar cap. Certified small businesses may also receive a 5 percent preference. Bids must be submitted electronically in PDF format to the designated email address by the specified deadline. The contractor is responsible for adhering to local prevailing wage rates, ADA compliance, and strict material storage and labeling standards. Quality control will be managed through on-site inspections, required testing logs, and the use of approved mockups to establish aesthetic and workmanship standards.
California Department of Parks & Recreation

POSTED

about 4 hours ago

DEADLINE

in 27 days
NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and reconstruction of eight launching ramps across four bays, designed to accommodate vessels exceeding 35 feet and weighing over 10 tons. Key project activities include the demolition of existing concrete structures, dredging and grading of native soils, placement of various gravel fills, and the installation of new concrete ramps using either a precast slab system or pour-in-place solution. Additionally, the contractor is responsible for the temporary relocation and re-anchoring of floating docks to ensure ADA-compliant travel, the installation of articulated concrete mattresses for scour protection, and the implementation of strict environmental controls, including turbidity curtains and stormwater pollution prevention plans. Bidders must be pre-qualified in Marine Construction for at least 750,000 dollars and provide a bid security deposit equal to 10 percent of their maximum bid price. The project must be completed within 180 calendar days from the Notice to Proceed, with a hard deadline for full public restoration by February 15, 2027. To minimize public disruption, the contract limits the simultaneous closure of all four ramps to a maximum of 45 calendar days. Performance will be verified through third-party topographic surveys, with acceptance based on post-grading soundings compared to the design template. Progress payments will be prorated monthly based on the physical percentage of project completion.
Public Works

POSTED

about 7 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The contract involves the construction and installation of a new floating breakwater at Strawberry Reservoir Marina, with a scope that includes fabrication, delivery, and anchoring of a structure approximately 160 feet long and 8 feet wide, designed to replace the existing breakwater by June 15, 2026. The project emphasizes adherence to Forest Service-approved engineering specifications, utilizing salvaged components where feasible, and requires the vendor to submit a maintenance plan ensuring a minimum service life of 10 years. The procurement process is conducted through an Invitation for Bid (IFB) issued by the Utah Division of Purchasing, with the award anticipated to be made to the lowest responsive and responsible bidder, based solely on price and compliance with mandatory minimum requirements. The contract duration extends from the award date until the project completion deadline, with vendors required to guarantee their pricing throughout this period. Regarding regulatory and contractual governance, the project is governed by Utah state procurement laws and administrative codes, with no specific FAR clauses incorporated or referenced. All terms, including certifications against boycotts of Israel, restrictions on foreign entities involved in forced labor, and compliance with state laws, are mandatory and non-negotiable. The solicitation emphasizes strict adherence to the state's standard terms and conditions, with no allowance for vendor modifications. Inspection and acceptance are to occur at the project site, with the Utah Division of Wildlife Resources responsible for verifying compliance with design specifications, dimensions, and proper installation before final acceptance. The procurement process mandates electronic submission via the Utah Public Procurement Place, with no specified page limits or proposal formats, and requires vendors to monitor for any addenda or updates issued prior to the response deadline. Overall, the contract is structured to ensure compliance with state laws, technical specifications, and project timelines, with clear emphasis on responsible bidding and adherence to mandatory requirements.

General Info

Documents

3

General Construction Notes for Dock and Finger Floats

PDF, High priority: read this firstsow
High

Scope of Work for Strawberry Marina Breakwater Replacement BD26-39

PDF, High priority: read this first12 pages · sow
High

Vendor Prerequisites for IFB Agency Solicitation

PDF, High priority: read this first7 pages · ifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah → Division of Purchasing
ContactsNo contacts available
OfficeN/A
Organization / AgencyUtah → Division of Purchasing
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Issuing Procurement Unit: State of Utah Division of Purchasing Conducting Procurement Unit: Division of Wildlife Resources The purpose of this IFB is to enter into a contract to provide: services to construct and install a new floating breakwater section at the Strawberry Reservoir Marina approximately 160' x 8' using provided designs and specifications in order to replace the existing breakwater by June 15th, 2026. Bid should include a maintenance plan that ensures a minimum service life of 10 years for the new breakwater. Mandatory Site Visit: A site visit will NOT be held prior to bidding. It is strongly recommended that each potential bidder inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. It is anticipated that this IFB will result in a single contract award to the lowest cost responsive and responsible vendor. Length of Contract: From time of award until June 15th, 2026 Vendor must guarantee its pricing for the duration of the contract.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS