This Solicitation opportunity from West Virginia was posted on April 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
BDR-2-27
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The WV Parkways Bridge Deck Replacement Contract (BDR-2-27) involves the full replacement of the northbound bridge deck over Little Valley Road at I-77 Milepost 48.00 in Raleigh County, West Virginia. This project includes installing precast deck panels and barriers through accelerated bridge construction methods. Additional work encompasses extensive steel bridge painting, shotcrete repairs to substructure units, and applying protective concrete coatings to all piers, abutments, and wingwalls. Specifically, the contract requires replacement of approximately 9,412 square feet of deck, painting 15,870 square feet of steel, 11 square yards of mortar repairs, and coating 5,830 square feet of concrete surfaces. The deck replacement for Bridge 3041N must be completed by October 31, 2026, with all contract work finalized by May 27, 2027. The bid opening will be conducted via teleconference, with interested parties provided dial-in details and participant codes to access bid results. The solicitation was posted on April 9, 2026, with responses due by April 14, 2026, under the management of the West Virginia Parkways Authority. This project emphasizes accelerated construction techniques to minimize traffic disruptions while ensuring durable bridge infrastructure improvements.
General Info
Place of Performance
Set-Aside
Documents
6AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 3 days
- North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1Open now, due in 18 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Organization & Contact Information
Full Description
The BDR-2-27 project is located along the West Virginia Turnpike at I-77 Milepost 48.00. It consists of fully replacing the northbound bridge deck over Little Valley Road (County Route 4/1) with precast deck panels and barriers utilizing accelerated bridge construction. It also includes fully repainting steelwork, pneumatically applied mortar (shotcrete) repairs to substructure units, and concrete protective coating on all piers, abutments and wingwalls for the bridge over Little Valley Road. The complete bridge deck shall be replaced during the designated ABC timeframe. The deck replacement of Bridge 3041N shall be completed by October 31, 2026.
Work on Bridge 3041N consists of approximately 9,412 square feet of bridge deck replacement, 15,870 square feet of steel bridge painting, 11 square yards of shotcrete repairs and 5,830 square feet of concrete protective coating.
All work under this contract shall be completed by May 27th, 2027.
The bid opening will be held via teleconference. To hear bid results, dial the number below and enter the Participant Code:
Conference Dial-In: (816)-702-6618 Participant Code: 439506264#
More opportunities from West Virginia Parkways Authority
Same awarding agency
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
