BEACH - Buzze EV Affordable Charging Hub
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The project involves the installation of at least 124 Level 2 electric vehicle charging ports across approximately 18 multifamily housing communities in California to expand access to EV charging for residents in existing paved parking areas without new land disturbance or tree removal. The initiative, known as BEACH – Buzze EV Affordable Charging Hub, is being led by the California Energy Commission with Buzze Inc. as the implementing entity, targeting equitable geographic distribution across Northern and Southern California. The project qualifies for categorical exemptions under the California Environmental Quality Act, specifically Sections 15301, 15303, and 15304 of Title 14 of the California Code of Regulations, which classify the work as minor alterations to existing facilities and small new constructions on developed sites with negligible environmental impact. A Notice of Exemption was signed on November 14, 2025, and the public notice was posted on November 17, 2025. There is no publicly disclosed contract value, pricing structure, or specified period of performance, and no federal acquisition regulations apply as this is a state-funded and state-administered project. Technical standards such as NEC or SAE J1772 are not referenced, nor are federal contract clauses, inspection criteria, payment terms, accounting codes, or invoicing procedures outlined. The California Energy Commission serves as the lead agency with Beau Blackwell-Mangan listed as the primary point of contact, though no formal designation as COR, COTR, or PCO is provided. No federal representations, certifications, or socioeconomic status declarations are included, as the procurement does not follow federal acquisition protocols. Delivery and performance occur across multiple sites statewide, with acceptance and inspection likely handled locally at each installation location. No formal proposal submission guidelines, deadlines, or submission portals are specified, and no contractual options, security requirements, or conflict of interest provisions are detailed. The project is administratively supported by CEQA compliance documentation rather than formal contract structures.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
