Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Beach Nourishment and Sand Placement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Documents

This scope was carved out of BDC07-26/27.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

ITB: BDC07-26/27 - Long Key State Park – Long Key Beach Nourishment and Campground Rebuild

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyFlorida → Department of Environmental Protection
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs beach nourishment activities for prime contractors on Florida Department of Environmental Protection (FDEP) coastal projects. Dredges, transports, and places sand to restore beach width and elevation per environmental permits. Utilizes dredging equipment, barges, and sand pumping systems. Must comply with FDEP environmental regulations and Executive Order 07-126 green building standards. Delivers restored beach area meeting specified elevation and width.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
2026-0011
Solicitation # 48935
The Cornerstone of Centerville South Phase I Public Improvements project in Centerville, Ohio, is a civil and electrical infrastructure initiative with an engineer's estimate of $4,973,490.39. The scope of work includes the installation of concrete drive aprons and curbing, sanitary sewer and water main work, and a design-build electrical component covering site lighting, service conductors, and associated infrastructure. Key deliverables include the installation of 22 decorative light fixtures, weather-resistant receptacles, and specific roadway and traffic signal marking. All work must adhere to the Ohio Building Code, N.E.C., N.F.P.A. Standard 70, and ODOT specifications, with a project completion deadline of September 30, 2027. The contract is administered by Oberer Construction Managers, Ltd. on behalf of the City of Centerville. Award is based on the lowest and best unit price bid submitted via Bid Express. Bidders are required to provide a bid bond for the full amount or a certified check for 10 percent of the bid, and the successful contractor must post a 100 percent performance bond. Financial requirements include minimum liability insurance limits of $2,000,000 for CGL and $1,000,000 for auto and employers liability. A 6 percent retainer will be held upon completion to serve as a maintenance bond. Compliance with Ohio Prevailing Wage laws and anti-discrimination clauses is mandatory.
City of Centerville

POSTED

about 5 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237990
New
Federal
RESERVE BASIN MAINTENANCE DREDGING CONTRACT FOR SITES AT THE PHILDELPHIA NAVY YARD IN THE PUBLIC WORKS DEPARTMENT PENNSYLVANIA AREA OF RESPONSIBILIY
Solicitation # N4008526B0002
Solicitation N4008526B0002 is a firm-fixed-price sealed bid contract issued by Navfacsyscom Mid-Atlantic for maintenance dredging at the Philadelphia Navy Yard in Pennsylvania. The project focuses on the North Side (Wharf N) of the Reserve Basin and the Schuylkill River Access Channel to support the decommissioning of US Naval vessels by ensuring safe vessel maneuverability and preventing sediment accumulation. The scope involves removing approximately 96,611 cubic yards of sediment using a sealed environmental clamshell bucket to achieve a minimum depth of -30 feet MLLW, with a maximum over-dredge depth of -32 feet MLLW. Dredged materials are to be transported via scow or barge to approved offsite facilities, specifically the Weeks Marine Whites Rehandling Basin in New Jersey or Waste Management Corporation Biles Island in Pennsylvania. The contract has a total performance period of 270 calendar days from the date of award receipt, with a specific work restriction from March 1 to June 30 to protect fish migrations and a final completion deadline of November 30, 2026. Award will be granted to the low responsible bidder, with a 10 percent price evaluation preference applied to HUBZone small businesses. Contractors must adhere to strict quality control standards, including a three-phase control system and daily reporting, and comply with Davis-Bacon Act wage determinations. Bids must be submitted electronically in PDF format via the PIEE Solicitation Module, including detailed technical plans, financial statements, and evidence of past performance for projects of similar magnitude.
Navfacsyscom Mid-Atlantic

POSTED

about 5 hours ago

DEADLINE

in 3 months
View Details
NAICS: 237990
New
Federal
GIWW Freeport to Matagorda Maintenance Dredging
Solicitation # W912HY26BA021
The GIWW Freeport to Matagorda Maintenance Dredging project, solicitation W912HY26BA021, is a firm-fixed-price contract issued by the US Army Corps of Engineers, Galveston District. The project involves the removal of shoaled materials within the Gulf Intracoastal Waterway across Brazoria, Matagorda, and Calhoun Counties, Texas. The estimated contract value ranges between $10 million and $25 million. The scope of work is divided into a base schedule and four options, with Schedule 1 requiring the dredging of approximately 345,000 cubic yards between Freeport Harbor and the Brazos River, and 51,000 cubic yards at the Brazos River Crossing. Additional options include dredging the channel to Palacios, the Colorado River, and boathouses at the Brazos River Floodgates and Colorado River Locks. The performance period for Schedule 1 is 225 calendar days from the Notice to Proceed. Contractors must adhere to strict technical specifications, including the use of the Texas State Plane Coordinate System (NAD83) and compliance with EM 385-1-1 safety standards and the Davis-Bacon Act. Quality control will be managed through the Resident Management System (RMS) and the Construction Management Platform (CMP). Bids must be submitted electronically via the PIEE suite by October 19, 2026. Award evaluation includes a 10 percent price preference for HUBZone small business concerns. Required deliverables include a magnetometer survey report certifying the removal of submerged pipelines and the submission of Performance and Payment Bonds within five calendar days of award.
W076 Endist Galveston

POSTED

about 5 hours ago

DEADLINE

in 10 days
View Details
NAICS: 237990
New
Federal
Webbers Falls Excitation System Replacements
Solicitation # W912BV26RA029
Solicitation W912BV26RA029 is a Request for Proposal issued by the Department of Defense, specifically the US Army Corps of Engineers Tulsa District, for the replacement of excitation systems at the Webbers Falls Powerhouse in Oklahoma. The project requires the design, manufacture, factory testing, and delivery of three identical digital solid-state excitation systems and three power potential transformers. The scope of work includes the disassembly and removal of existing equipment, inspection of collector rings, and the provision of comprehensive training for maintenance personnel and operators. The performance period is 300 calendar days from the date of the notice to proceed, with a requirement for the contractor to begin work within 10 calendar days of that notice. Award will be determined using the Lowest-Price, Technically Acceptable process, with no trade-offs permitted. To be deemed technically acceptable, prime contractors must demonstrate experience with at least three similar projects completed within the last five years, including at least one project valued over 2 million dollars. Technical requirements include compliance with IEEE C2 and NFPA 70 standards, the development of a Construction Quality Control Plan, and adherence to MIL-STD-129 for marking and shipping. Additionally, the prime contractor must possess a Facility Clearance and ensure personnel complete required security and CUI training. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment portal by October 23, 2026.
W076 Endist Tulsa

POSTED

about 5 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237990
New
Federal
Fall River Lake and Dam Damsite Park Lagoon Repair
Solicitation # W912BV26QA095
Solicitation W912BV26QA095 is a request for quotations from the U.S. Army Corps of Engineers, Tulsa District, for the repair, reconstruction, and modernization of the Damsite Park wastewater lagoons at Fall River Lake in Fall River, Kansas. This total small business set-aside will be awarded as a firm-fixed-price contract to a responsible offeror based on price, past performance, and conformance with subcontracting regulations. The project scope includes the removal and disposal of wastewater, earthwork and slope reconstruction to a strict 3:1 ratio, the installation of a new 60 mil HDPE liner complying with KDHE regulations, and the replacement of perimeter security fencing. The primary requirement focuses on the north westerly facing lagoon, with an optional secondary bid for the south easterly facing lagoon. The period of performance is scheduled from October 15, 2026, to April 13, 2027, with all work to be completed within 180 calendar days of the Notice to Proceed. Contractors must adhere to EM 385-1-1 safety standards, provide personnel with OSHA 30 and CPR certifications, and ensure all staff are E-Verified. A critical responsibility requirement is the submission of a National Institute of Standards and Technology score in the Supplier Performance Risk System; failure to provide this score will result in a non-responsible determination. Quotes must be submitted via the PIEE Solicitation Module by October 13, 2026, at 2:00 P.M. CST. Award is contingent upon the availability of appropriated funds and requires an active registration in the System for Award Management.
W076 Endist Tulsa

POSTED

about 5 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237990
New
International
Ladner Dredging and Harbour Repairs, Ladner, BC
Solicitation # 30008380
Fisheries and Oceans Canada is soliciting bids for maintenance dredging and potential harbour repairs at the Ladner Small Craft Harbour in Ladner, British Columbia. The primary scope of work involves dredging operations to achieve a target design depth of -4.5 meters, with the disposal of up to 48,000 cubic metres of material at the Point Grey site. This disposal is strictly governed by Disposal at Sea Permit PYR-00567-1 and the Canadian Environmental Protection Act, requiring adherence to a specific Material Management Plan and environmental mitigation measures. Optional work may include various float and wharf repairs, such as the replacement of decking, bullrails, rubboards, fender and batter piles, and the temporary relocation of floats to facilitate dredging. All project activities, including site cleanup and demobilization, must be completed within the least risk fisheries window, with a final deadline of February 28, 2027. This solicitation is open exclusively to Canadian Contractors and requires the submission of a Combined Price Form, integrity verification, and a Reciprocal Procurement Declaration by October 18, 2026. Successful bidders must provide contract security in the form of performance and payment bonds or a security deposit and maintain commercial general liability insurance for six years beyond the project's completion. The contract is subject to the Federal Prompt Payment for Construction Work Act, ensuring payment within 28 calendar days of a proper invoice.
Department of Fisheries and Oceans

POSTED

about 12 hours ago

DEADLINE

in 10 days
View Details

More opportunities from Florida → Department of Environmental Protection

Same awarding agency

NAICS: 236220
New
SLED
Addendum 1 BDC08-26-27 Charlotte Harbor Preserve State Park - Maintenance Building Replacement
Solicitation # BDC08-26/27
The Florida Department of Environmental Protection, Bureau of Design and Construction, is soliciting formal, competitive, sealed bids for the replacement of the maintenance building at Charlotte Harbor Preserve State Park in Punta Gorda, Florida. The scope of work requires the contractor to provide all labor, materials, equipment, supervision, and permitting necessary to complete the replacement. Bids must be submitted no later than 3:30 pm ET on Wednesday, October 14, 2026, to Logan Lee-Marple at the Bureau of Design and Construction in Tallahassee. To be considered, bidders must be licensed to work in the jurisdiction and provide a biennial pre-qualification letter from the FDEP Bureau of Design and Construction. Those not pre-qualified must instead submit a current State Contractor license certification or registration and a current Corporate Charter registration. The project must adhere to green building standards per Executive Order 07-126 and Section 255.252(3), F.S., and the contractor must utilize the U.S. Department of Homeland Security’s E-Verify system for all employees and subcontractors. Additionally, Builder’s Risk insurance is mandatory and must be included in the bid price. The Department also encourages the use of diverse subcontractors to reflect the citizenship of the State of Florida.
Commercial and Institutional Building Construction

POSTED

about 21 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
SLED
ITB: BDC07-26/27 - Long Key State Park – Long Key Beach Nourishment and Campground Rebuild
Solicitation # BDC07-26/27
The Florida Department of Environmental Protection, Bureau of Design and Construction, is soliciting formal, competitive, sealed bids for the Long Key State Park Beach Nourishment and Campground Rebuild project, solicitation number BDC07-26/27. The scope of work requires the contractor to provide all labor, materials, equipment, supervision, and permitting necessary for the campground modification project at Long Key State Park in Long Key, Florida. All work must be designed and constructed in accordance with applicable green building standards pursuant to Executive Order 07-126 and Section 255.252(3), F.S. Bids must be submitted no later than 3:30 pm ET on Thursday, November 12, 2026, to Alisha Sadler at the Bureau of Design and Construction in Tallahassee. Bidder prequalification is mandatory; applicants must provide a biennial pre-qualification letter from the FDEP or, if not pre-qualified, submit a current State Contractor license certification and Corporate Charter registration. Additionally, the selected contractor must utilize the U.S. Department of Homeland Security’s E-Verify system for all employees and subcontractors. The Department encourages the use of diverse subcontractors to reflect the citizenship of Florida and ensures ADA accessibility for all bid-related activities.
Other Heavy and Civil Engineering Construction

POSTED

about 24 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
Bid Results and anticipated award of BDC03-26-27 Grayton Beach - Beach Re-Nourishment
Solicitation # BDC03-26/27
The Florida Department of Environmental Protection, Bureau of Design and Construction, is soliciting formal, competitive, sealed bids for the Grayton Beach State Park Beach Re-Nourishment project located in Santa Rosa Beach, Florida. The selected contractor will be responsible for providing all labor, materials, equipment, supervision, and permitting required for the project. All work must be designed and constructed in accordance with applicable green building standards pursuant to Executive Order 07-126 and Section 255.252(3), F.S. Additionally, the contractor and all subcontractors must utilize the U.S. Department of Homeland Security's E-Verify system to confirm employment eligibility for all personnel working within the state of Florida. Bids must be submitted no later than 3:30 pm (ET) on Wednesday, September 30, 2026, to Alisha Sadler at the Bureau of Design and Construction in Tallahassee. Bidder pre-qualification is mandatory; applicants must provide a biennial pre-qualification letter from the FDEP Bureau of Design and Construction or, if not pre-qualified, submit a current State Contractor license certification or registration and a current Corporate Charter registration. The Department emphasizes a commitment to diversity in its procurement program and encourages the inclusion of minority businesses in sub-contracting opportunities. Any protests regarding bid specifications must be filed with the Agency Clerk within the designated 72-hour window following the posting of specifications.
Other Heavy and Civil Engineering Construction

POSTED

about 24 hours ago

DEADLINE

in 4 days
View Details
NAICS: 236220
New
SLED
Addendum 3 BDC02-26/27 Blue Spring - Restroom Replacement
Solicitation # BDC02-26/27
Solicitation BDC02-26/27 is a project managed by the Florida Department of Environmental Protection for the replacement of restrooms at Blue Spring State Park. The scope of work involves the construction of a new facility featuring restrooms and changing rooms, with specific requirements for CMU block benches with concrete tops, ceiling-hung high-density solid-polymer toilet compartments based on the Bobrick Sierra Series, and fiberglass-reinforced polymer doors installed in 16-gauge Type 304 stainless-steel frames. Site work includes the installation of Bahia type sod and a grading design that utilizes slopes to direct runoff away from the building, as the project has been revised to eliminate the need for retaining walls, guardrails, and below-grade waterproofing. Additionally, the facility will feature a seamless, slip-resistant fluid-applied epoxy flooring system and will not include gutters or downspouts. Bids must be submitted to Contracts Specialist Logan Lee-Marple by 3:30 PM ET on October 13, 2026. To avoid potential rejection, bidders must include signed acknowledgments of receipt for all addenda with their submissions. Contractors are responsible for site security, including a minimum six-foot fence height and the protection of designated trees. Insurance requirements specify that Builder's Risk coverage must encompass the total project cost, including any existing DEP-owned property. All door and glazing assemblies must comply with applicable safety-glazing and accessibility standards.
Commercial and Institutional Building Construction

POSTED

2 days ago

DEADLINE

in 4 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS