Bear Butte Livestock Water Pipeline Replacement

Forecast
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

1082720

Place of Performance

MT, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyDepartment of the Interior → Bureau of Land Management
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
The Bear Butte livestock water system will be maintained and replaced with new 1-½ to 2-inch high-density polyethylene (HDPE) pipe and installed by trenching at depths 5-6 feet deep. The current pipeline and spurs were originally installed in the 1980s and 1990s during three different installment segments with PVC pipe. The current pipe is eroding, and half the livestock water line is no longer functioning. The pipeline will be replaced and updated within the already disturbed area of the current pipeline route. Required Design features will be applied to avoid or limit impacts to other resources. These design features address construction activities and limit potential impacts to other buried utility lines, cultural resources, noxious weeds, erosion, and migratory birds (see below). The Bear Butte pipeline would be replaced along the already existing surveyed routes. Stock water tanks would be replaced with new rectangular fiberglass tanks and equipped with the required design features such as wildlife escape ramps, calf barriers, floats, and overflow pipes. Approximately 27,800 feet of existing stock water pipeline will be replaced with new High-Density Polyethylene (HDPE) pipe. Twelve new rectangular fiberglass water tanks will be installed in the existing tank locations along the replacement pipeline routes and spurs (one tank location currently has a double tank and will be replaced by only one rectangular tank). All tanks will hold a minimum of 1,000 gallons of water. Tanks would not be filled with water until it is needed for livestock and would remain full until October 1 or until the first freeze. All old tanks and hydrants will be removed from the site once the new system is installed. This pipeline provides livestock water to the Bear Butte Allotment within Fort Meade in South Dakota that revenues $103 an AUM through a closed bid system. Bear Butte allotment serves as the highest AUM priced allotment in the United States managed by the BLM and currently there is no available stock water available for half of the total allotment. If pipeline isn't available by spring of 2027, BLM's revenue could be significantly reduced. All Environmental Analysist and cultural clearances have been completed for this project.

Similar Contracts

Same NAICS industry code

More opportunities from Department of the Interior → Bureau of Land Management

Same awarding agency

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS