Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from New York was posted on May 31, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Bear Mountain Bridge Deck Replacement - Design

Closed
2110598State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 8 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The New York State Bridge Authority is seeking proposals from licensed professional engineering firms to design a deck replacement for the historic Bear Mountain Bridge, a suspension structure spanning the Hudson River and listed on the National Register of Historic Places. The project involves evaluating multiple deck replacement systems, including panelized or modular options, with the goal of installing a new deck capable of supporting HS25 load ratings and ensuring a fifty-year service life. The scope includes comprehensive SEQRA and SHPO reviews, along with all necessary permit pre-application processes, given the bridge's historic status. The selected firm must demonstrate prior successful experience with similar bridge projects of comparable size and complexity. Proposals are due by July 12, 2024, with questions to be submitted by June 28, 2024. The contract is expected to conclude by October 31, 2025, and the project is located in Putnam and Rockland counties near Fort Montgomery, NY. The contract size ranges from five to fifteen million dollars, and the project emphasizes MWBE participation goals of 30%, including a 6% target for Service-Disabled Veteran-Owned Business contracting. Interested firms can request the full RFP package by contacting Teresa Ceragioli, Assistant to the Chief Engineer, via email. The project underscores the importance of experience with historic bridge infrastructure and aims to ensure the longevity and safety of this iconic structure.

General Info

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 10 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 14 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNew York → NYS Bridge Authority
Contacts1 person available
OfficeN/A

Full Description

Show more
The New York State Bridge Authority (NYSBA) is soliciting proposals from firms of licensed professional engineers to design a deck replacement for the Bear Mountain Bridge. The bridge is on the National Register of Historic Places and requires a substantial SEQRA and SHPO review. All SEQRA and SHPO tasks as well as all necessary permit pre-applications are a part of the assignment.  The Bear Mountain Bridge is a 2,555 foot long suspension bridge, carrying NYS Routes 6 and 202 over the Hudson River, located approximately 35 miles north of New York City. The bridge was opened in 1924 and was redecked in 1976 and supports two (2) 12 foot lanes and two (2) 7 foot wide shoulders.  Work will involve evaluating 3-4 deck replacement systems for use on this project, including panelized or modular deck replacement systems. It is the intent of this project to provide a new deck and existing stringers and floor beams with an HS25 load rating a fifty (50) year expected life service.  The successful proposer shall demonstrate to NYSBA a successful history of similar performances for operators of bridges of the type and size of NYSBA's facilities.  To request the entire RFP package, please contact Teresa Ceragioli, Assistant to the Chief Engineer, at Sign up to see this detail with your complete contact information.  Service-Disabled Veteran-Owned Set Aside: No Total MWBE Participation Goals: 30% Service-Disabled Veteran-Owned Business Contracting Goal: 6% Due date:07/12/2024 3:00 PM Questions due by noon on Friday, June 28th, 2024 Contract term: October 31, 2025 County(ies): Putnam, Rockland Location: Bear Mountain Bridge, Fort Montgomery, NY Business entities awarded an identical or substantially similar procurement contract within the past five years: None

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS