BEAVERHEAD-DEERLODGE NATIONAL FOREST - Boulder Trail Bridges

Awarded
AG-0356-S-14-0021Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 11 hours ago

DEADLINE

in 6 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 11 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 11 hours ago

DEADLINE

in about 19 hours
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 11 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 16 hours ago

DEADLINE

N/A

AI Contract Overview

Show more

This project involves the removal and replacement of three trail bridges within the Flint Mountain Range of Granite County, Montana, specifically on the Boulder Lake and Copper Lake trails. The contractor is responsible for all fabrication, installation, and the provision of all necessary hardware, timber, geocell, rock, and fill materials. Specific requirements include a 25-foot bridge at Boulder Lake Trail MP 0.0, a 40-foot bridge relocated 30 feet downstream at Boulder Lake Trail MP 0.1 including 150 feet of excavation, and a 40-foot bridge at Copper Lake Trail MP 0.0. All new structures must feature rock retainer crib and turnpike approaches. The contract is a total HUB Zone set-aside with a construction magnitude between 25,000 and 100,000 dollars. The mandatory period of performance runs from August 15, 2014, to August 31, 2015, with strict environmental restrictions to protect native trout; specifically, no on-site work is permitted during September 2014 or from August 31, 2014, to July 15, 2015. All required production and commercial certificate submittals must be provided by February 15, 2015.

General Info

Contract Value

$79,370

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Pintler Ranger District, PHILIPSBURG, MT, 59858, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline added: Jun 19, 2014. The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Custer Gallatin National Forest
Contacts2 people available
OfficeBOZEMAN, MT, 59715, USA
Office AddressBOZEMAN, MT, 59715, USA
Contacts

Full Description

Show more
Y Boulder Trail Bridges on the Pintler Ranger District This requirement is a TOTAL HUB Zone Set Aside per FAR 19.1305 Location and Directions. The three proposed bridges all reside in Granite County within the Flint Mountain Range. Please see the maps for detailed locations. Directions to the bridges are as follows: a) Boulder Lake Trail is located in the Flint Mountains. The trailhead is accessed from Phillipsburg by traveling north for 11 miles to Maxville. From Maxville, travel 8.8 miles up Road 676 to the Boulder Lakes Trailhead Sign. The trailhead is accessible by high clearance vehicles. b) Copper Lake Trail is approximately one and a half miles prior to Boulder Lake Trail along the same access road. The bridge is at the trailhead. Description of Work. The project consists of removing and replacing three trail bridges. All fabrication and installation of the bridge shall be done by the contractor. All hardware, timber, geocell, rock and fill material are to be furnished by the contractor. Production and commercial certificates sunmittals are required prior to installation for all components see Section 106 of the specifications for what constitutes a production or commercial certificate submittal. Submittals are due no later than February 15, of 2015. The work is at the following three locations: a) Boulder Lake Trail No. 8033 MP 0.0. The current trail bridge at milepost 0.0 has sound decking, no sill logs, native stringers, and is too short. The lack of sill logs is causing the bridge to lean into the creek. The current bridge shall be removed. The new bridge shall be 25 feet in length by 6 feet in width and shall have rock retainer crib and turnpike approaches. This trail is non-motorized. b) Boulder Lake Trail No. 8033 MP 0.1. The current bridge has failed and is unusable. The current bridge has created a pond and widened the creek prior to the bridge. This has created an undesirable existing bridge site at the current location. The new bridge shall be 40 feet in length by 6 feet in width and shall have rock retainer crib and turnpike approaches. The bridge will be located 30 feet downstream from the existing location. A current trail connects the new crossing with the old trail, but this trail is not up to clearing and excavation standards. 150 feet of excavation and clearing and grubbing is necessary at this location. c) Copper Lake Trail No. 8034 MP 0.0. The current bridge has untreated materials that are beginning to show decay. The curbs are smashed and rotten. The new bridge shall be 40 feet in length by 6 feet in width and shall have rock retainer crib and turnpike approaches. Period of Performance: August 15, 2014 to August 31, 2015. Performance period is mandatory do to a native trout species. Work shall be completed no later than August 31, 2015. No on site work can be performed from 8/31/14 to July 15, 2015. Additionally, no work can be performed in September of 2014. Construction Magnitude: $25,000 - $100,000 Full details and solicitation documents will be posted in late May 2014.

More opportunities from Department Of Agriculture → Custer Gallatin National Forest

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS