Beckstoffer Replant Phase 4b (PL-26-274)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Beckstoffer Replant Phase 4b project involves the removal of existing vines across approximately 45 acres of vineyard located on parcels 009-006-78, 009-006-24, 009-006-44, and 009-006-90 in Lake County, California. The scope of work includes the removal of surface irrigation tubing and trellises, after which vines will be pushed over and piled within the existing vineyard block boundaries. The project is designed to maintain the current farming footprint, ensuring that no native vegetation is disturbed and no material is stored outside the existing vineyard area. To mitigate environmental impact, the project stipulates that no grading, cutting, or filling will occur, and all activities will remain at least thirty feet away from the top of banks of watercourses, wetlands, lakes, or vernal pools. The removal process targets plants with stable woody root systems extending at least twelve inches below the soil surface, specifically in areas with moderate or severe Erosion Hazard Ratings. This forecast project is managed by the Lake County agency, with Daniel Brancati serving as the primary point of contact.
General Info
Agency
NAICS
Place of Performance
Highway 29 and Soda Bay Rd, CA, 94573Set-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
