Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on March 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

BELAIR SUBDIVISION GAS MAIN & SERVICE REPLACEMENT

Closed
FVUC-1-26State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237120
New
SLED
WH Ford RTC Fueling System Repairs, Kentucky
Solicitation # W9128F27RA054
The WH Ford RTC Fueling System Repairs project is a design-build effort located in Greenville, Kentucky, managed by the Bristol Alliance of Companies. The scope of work involves comprehensive upgrades and repairs to the fueling system, including upgrading tank automatic tank gauges (ATG), repairing dispenser and offload concrete, installing emergency fuel shut-off (EFSO) systems, and mounting leak detector probes on two diesel above-ground storage tanks. Additional requirements include providing concrete circulation pavement, replacing canopy and fuel pipe coatings, installing splash blocks, replacing roof penetration boot seals, providing dead man control for truck loading, and modifying tank access platforms. All tanks must be cleaned and vapor-free before work begins, and the project must adhere to UFC, NFPA, and ASTM standards, as well as ADA and ABA accessibility guidelines. This firm-fixed-price solicitation (W9128F27RA054) uses a Lowest Price Technically Acceptable (LPTA) selection process. Proposals must be submitted in two separate volumes: a technical volume covering specialized experience, a Gantt chart for the contract duration, and a technical approach, and a separate pricing volume. The period of performance is 410 calendar days, with a final delivery date of June 18, 2027. The contractor is required to maintain a quality control system complying with FAR 52.246-12 and must adhere to Davis-Bacon Act wage determinations. There is no specific set-aside status for this contract.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 28 days
NAICS: 237120
New
Federal
Mather Fueling System Repairs
Solicitation # PANNWD26P028176
The Mather Fueling System Repairs project, located in Mather, California, is a design-build effort to upgrade and repair fueling infrastructure at the Mather Army Aviation Support Facility. The scope of work includes installing a sampling gauge hatch and a clock-type mechanical gauge on a manway, recoating the tank exterior, replacing collision barriers, adding a full-tank catwalk, and replacing audible and visual alarms. Additional requirements include fixing remote containment basin drainage, replacing asphalt on the northeast side of the facility, repairing refueler parking concrete, installing a non-coalescing filter and water draw-off system, replacing asphalt near the loading facility with a concrete path, replacing the POL building, installing and testing an ATG system on the AVGAS Fuel Storage Tank, and relocating a generator from a compartmentalized area. This is a Firm Fixed-Price contract restricted as a Small Business Set Aside - Total. The government will use the Lowest Price Technically Acceptable (LPTA) selection method, evaluating technical proposals based on project experience—requiring three examples of projects valued at $1 million or more—and the proposed project schedule. The projected period of performance is 365 days. The project must adhere to strict regulatory standards, including UFC 3-460, OSHA, EPA, and DOT requirements, and is subject to the Davis-Bacon Act for prevailing wage rates. Performance and payment bonds are required within 10 days of award.
W071 Endist Omaha

POSTED

about 21 hours ago

DEADLINE

in 10 days
NAICS: 237120
New
International
Expansion And Improvement of Fuel Storage Facilities at OSESGY Premises In Aden, Yemen Chief Procurement Unit
Solicitation # EOIOSESGY24933
The Office of the Special Envoy of the Secretary-General for Yemen requires a qualified contractor to expand and improve diesel fuel storage facilities at its Office and Accommodation premises in Aden, Yemen. The project involves the supply, installation, testing, and commissioning of a horizontal diesel tank with at least 20,000 L capacity at the Office and a vertical tank with at least 5,000 L capacity at the Accommodation. Key tasks include improving fuel containment, enhancing maintenance access, reinstating finishes, and connecting to existing generator fuel systems while ensuring an uninterrupted diesel supply during the works. The project must be completed within two calendar months from the commencement date. Interested vendors must be registered at least at the Basic Level in UNGM to be considered. Required documentation includes a signed Qualification Checklist, a company registration certificate showing at least three years of operation in Yemen, and a company profile. Contractors must demonstrate experience in at least three similar projects valued at USD 30,000 or more completed within the last five years. Additionally, the contractor must provide qualified key personnel, including a Project Manager and Civil Engineer with five years of experience, and commit to warranties covering materials for one year, workmanship for two years, and structural works for ten years.
UN Secretariat

POSTED

1 day ago

DEADLINE

N/A
NAICS: 237120
New
SLED
Hammerman Gas/Diesel Tank Replacement Gunpowder Falls State Park
Solicitation # BPM059366
This project involves the removal and replacement of above-ground gasoline and diesel fuel storage systems at the Hammerman Area of Gunpowder Falls State Park in Middle River, Baltimore County, Maryland. The scope of work requires the contractor to provide all labor, equipment, materials, insurance, and permits to remove existing tanks, dispensers, piping, electronic systems, concrete pads, and bollards. The installation includes a 2500-gallon gasoline tank and a 1000-gallon diesel tank, along with new concrete pads, side-mount dispensers, pumps, and a magnetic digital Automatic Tank Gauge. To maintain operations during the project, the contractor must provide temporary gasoline and diesel tanks with metered dispensers. This is a Small Business Reserve Procurement, limited to certified small businesses. The procurement has established participation goals of 15% for Minority Business Enterprises (MBE) and 2% for Veteran-owned Small Business Enterprises (VSBE). The contract is estimated between $100,000 and $500,000, with the award based on the lowest responsive and responsible bidder. All work must comply with Maryland Department of the Environment regulations, NFPA 30, 30A, and 78 fire safety standards, as well as API standards 650, 620, and recommended practice 1604. Final acceptance is contingent upon approval from the Facility Manager and DNR Project Engineer, and requires the submission of inspection certificates and disposal manifests.

POSTED

5 days ago

DEADLINE

in 21 days
NAICS: 237120
New
SLED
27-006 Gas Utility Installer
Solicitation # 27-006
The City of Commerce is seeking a gas utility installer for a one-year contract, with options to renew annually for up to three additional years. The scope of work focuses on the installation of gas mains using directional boring, specifically including 3-inch and 4-inch polyethylene gas mains and 3-inch tap, stop, or bottom out steel tie-ins. This is a solicitation for a SLED organization in Georgia, and there is no specified set-aside status for this opportunity. Proposals will be evaluated by a committee based on cost (40 points), proposal completeness (20 points), quality of previous similar projects (20 points), project understanding (15 points), and the ability to meet the timeline (5 points). The City reserves the right to select the response that is in its best interest. Payment is processed 30 days after the completion of construction and successful testing of all installed products, subject to available funds. Contractors must provide a bid bond of at least 5% and a performance bond equal to 100% of the construction contract amount upon completion. Required insurance includes general liability covering $1,000,000 per incident and Georgia-mandated workman's compensation. Additionally, the successful vendor must provide operator qualifications, a drug and alcohol testing plan, and submit PHMSA Drug and Alcohol Testing Data to the City on a quarterly basis. Submissions must be delivered in a sealed package by December 21, 2026.
City of Commerce

POSTED

6 days ago

DEADLINE

in 27 days

AI Contract Overview

Show more

The Fort Valley Utility Commission is soliciting sealed bids for the replacement of approximately 1,700 feet of 2-inch steel gas main with 2-inch polyethylene pipe, along with the installation of 12 residential gas services on Crestwood Drive in Fort Valley, Georgia. Bids must be submitted by 10:00 am on Wednesday, April 15, 2026, to the Commission's administration office located at 500 Anthoine St., Fort Valley, GA. Late submissions will not be accepted. Bidders are required to submit their proposals in sealed envelopes, including a Utility Contractors License, appropriate insurance certificates, and a list of contractor employees with their tasks and qualifications under the current GMA Operator Qualification Plan. A mandatory pre-bid meeting will take place on March 25, 2026, at 10:00 am at the same address to discuss project specifics and answer questions. Bid submissions must also be accompanied by a bid bond equal to at least 10% of the bid amount. The awarded contractor will be required to furnish both a performance bond and a payment bond amounting to 100% of the contract value. The Fort Valley Utility Commission reserves the right to reject any or all bids, waive formalities, and re-advertise if necessary. For further inquiries and electronic bid documents, bidders can contact Jason Baker of Sapp Engineering & Services, while Tara Giles serves as the primary point of contact for the Commission.

General Info

Fort Valley seeks bids for 2-inch gas main replacement and 12 residential services by April 15, 2026.

Documents

2
PDF, High priority: read this first147 pages · rfb
High
PDF, High priority: read this first1 page · advertisement-for-bid
High

Read all 2 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • WH Ford RTC Fueling System Repairs, KentuckyOpen now, due in 28 days
  • Mather Fueling System RepairsOpen now, due in 11 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Fort Valley Utility Commission
Contacts1 person available
OfficeN/A

Full Description

Show more
Sealed bids will be received by the Fort Valley Utility Commission Administration Office, 500 Anthoine St., Fort Vally, GA 31030 until: Wednesday, April 15, 2026, at 10:00 am for the furnishing of labor, tools, skill, equipment and incidentals for the construction and installation of: Replacing approximately 1,700 ft of 2¿ Steel with 2¿ PE gas main and 12 residential gas services on Crestwood Dr. in Fort Valley, GA. Bids received after the designated time will not be considered. Bids should be submitted in a sealed envelope addressed to the above address for the Fort Valley Utility Commission. To be considered, the bid shall include a copy of the Utility Contractors License, appropriate insurance certificate and a summary list of contractor employees showing tasks and expiration dates for Operator Qualification under the current GMA OQ Plan. Electronic versions of the bid documents and construction specifications are available by contacting Jason Baker at Sign up to see this detail. A mandatory prebid meeting will be held at the above address on Wednesday, March 25, 2026 at 10:00 am to answer questions and review the details of the project. All bid forms must be accompanied by a Bid Bond in an amount not less than ten percent (10%) of the amount bid. The successful bidder, if awarded the Contract, will be required to furnish a Performance Bond and Payment Bond, each in the amount of one hundred percent (100%) of the Contract amount. The Fort Valley Utility Commission reserves the right to reject any or all bids and to waive formalities and re-advertise. All questions should be directed to Jason Baker Sapp Engineering & Services Sign up to see this detail Sign up to see this detail .

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS