Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Belle Fountain Ditch Cleanout Phase 2

Active
W912EQ26BA002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Solicitation W912EQ26BA002 is a firm-fixed-price invitation for bid issued by the US Army Corps of Engineers, Memphis District, for the Belle Fountain Ditch Cleanout Phase 2 project in Pemiscot County, Missouri. The project involves providing all plant, labor, and materials for channel cleanout of the Belle Fountain Ditch region, specifically covering the Bypass of Steele and Main Ditch. Work limits begin at the confluence of New Franklin Ditch and Bypass of Steele, extending north through the Bypass of Steele into the Main Ditch, and ending approximately 100 feet before the intersection of Main Ditch and County Rd 442. Key deliverables include clearing and snagging from STA 0+00 to STA 349+92.87, channel cleanout excavation, fill operations, stone protection, and the establishment of turf. The estimated value of the work is between 1 million and 5 million dollars. This procurement is set aside for Service-Disabled Veteran Owned Small Businesses (SDVOSB) under NAICS code 237990. Bids are submitted as a lump sum with required unit prices for specific items. The government will award the contract based on best value, evaluating responsiveness, price reasonableness, financial resources, and technical experience. Bidders must provide a bid bond if the bid exceeds 150,000 dollars, and the successful awardee must furnish performance and payment bonds equal to 100 percent of the contract price. Compliance with the Davis-Bacon Act and various environmental regulations, including a Storm Water Pollution Prevention Plan, is mandatory. The final bid response deadline is November 3, 2026.

General Info

US Army Corps of Engineers SDVOSB contract for Belle Fountain Ditch cleanout project.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Pemiscot County, Missouri, TN

Set-Aside

SDVOSBC

Documents

7

Amendment 0001 to Solicitation W912EQ26BA002 - Belle Fountain Phase

PDF, High priority: read this first62 pages · amendment
High

Amendment 0001 - W912EQ26BA002 Belle Fountain Phase 2

PDF, High priority: read this first62 pages · amendment
High

Solicitation Amendment W912EQ26BA002-0002 - Belle Fountain Phase 2

PDF, High priority: read this first121 pages · amendment
High

W912EQ26BA002 - Belle Fountain Ditch Cleanout Phase 2

PDF, High priority: read this first296 pages · ifb
High

W912EQ26BA002 - Belle Fountain Ditch Cleanout Phase 2 IFB

PDF, High priority: read this firstifb
High

W912EQ-26-BA002 - Belle Fountain Ditches Cleanout Phase 2 Drawings

PDF, High priority: read this first44 pages · specifications
High

Deleted Attachments Notice - W912EQ26BA002

TXT, Low priority1 page · special-notice
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseSolicitation
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Response deadline changed from Oct 20, 2026 to Oct 27, 2026. The notice description changed.

Notice updated

Response deadline changed from Oct 27, 2026 to Nov 3, 2026. The notice description changed.

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist Memphis
Contacts2 people available
OfficeMEMPHIS, TN, 38103-1894, USA
Office AddressMEMPHIS, TN, 38103-1894, USA

Full Description

Show more
Title of Work: Belle Fountain Ditch Cleanout Phase 2 Project Description: The work consists of furnishing all plant, labor, and materials for channel cleanout of Belle Fountain Ditch region including Bypass of Steele and Main Ditch according to the plans and specifications and any incidental related work. The project limits are starting at the confluence of New Franklin Ditch and Bypass of Steele, heading North through Bypass of Steele and it turns into Main Ditch, and ending at the intersection of Main Ditch and County Rd. 442 located approximately 2.5 miles south of Braggadocio, Missouri as shown on the plans. Work Location: The work shall be located at Bypass of Steele where it intersects with New Franklin ditch, then heads north through Main Ditch, and ends 100 ft before the intersection of Main Ditch and County Rd. 442, approximately as indicated. The North American Industry Classification System code is 237990 - Other Heavy and Civil Engineering Construction, with a Small Business Size Standard of $45M. This project is advertised as a Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside using sealed bid procedures. Amendment 0001 has been posted. Amendment 0002 has been posted.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
9585 - Castle Creek Channel Improvements at Warner Park
Solicitation # 9585
The City of Madison is soliciting bids for contract 9585, project 13863, to perform the Castle Creek Channel Improvements at Warner Park in Dane County, Wisconsin. The scope of work involves reconstructing an existing concrete lined channel by lowering and widening the channel from Sherman Avenue to Warner Lagoon, implementing storm sewer improvements, and performing native plant restoration. The project includes the potential removal, salvage, and reinstallation of existing bridges following final grading and riprap placement. Contractors must adhere to various environmental permits, including authorizations from the US Army Corps of Engineers, the WDNR for hydrologic restoration and storm water construction, and the City of Madison for erosion control. Bidders must be prequalified, specifically in category 246 for Ecological Restoration, or utilize a prequalified subcontractor for related work items. The contract is designated as a Best Value Contract for multi-trade bids equal to or greater than 386,500 dollars. A 5 percent bid bond is required, and the project carries a Small Business Enterprise goal of 12 percent. Awardees must provide payment and performance bonds and comply with the City of Madison Affirmative Action Ordinance. Performance is subject to strict quality standards, including a one-year guarantee on seeded areas and compliance with Wind Sock Standards for erosion control. Failure to comply with specific contract articles may result in liquidated damages of 0.5 percent of the award price per week, capped at 5 percent or 10,000 dollars. Grant funds for the project are administered on a reimbursement basis.
City of Madison

POSTED

1 day ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
SLED
Fuel Pump Renovation
Solicitation # 6581
The Town of Trumbull is soliciting sealed proposals for the Department of Public Works Fuel Pump Renovation project, identified as solicitation 6581. The scope of work requires the contractor to provide all labor, materials, and equipment for the demolition, removal, and installation of fuel pump facilities. Key deliverables include the construction of fuel islands, tank slabs, and canopies, as well as the implementation of fire suppression and electrical systems. The project must adhere to the 2024 Connecticut Sediment and Erosion Control Guidelines, Town of Trumbull noise regulations, and technical standards such as NFPA 30, 30A, and 70. Proposals are due by December 1, 2026, at 2:00 PM ET and must be submitted in a sealed envelope to the Purchasing Agent. The selection process may evaluate proposers based on their previous experience with comparable work and available financial and technical resources. Required submission documents include a completed bid form, a list of subcontractors, and evidence of similar services provided to at least four clients in the last five years. The successful contractor must provide a 10% bid security, 100% performance and payment bonds, and a Certificate of Insurance naming the Town of Trumbull and the State of Connecticut as additional insureds. Additionally, the contractor must comply with Connecticut State Prevailing Wage Rates and ensure personnel have completed the 10-hour OSHA Construction Safety and Health Course. Payment is structured via estimates with a 5% retainage, though the Town may approve payments for long-lead equipment prior to delivery.
DAS Procurement

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of Defense → W07V Endist Memphis

Same awarding agency

NAICS: 237990
New
Federal
St Francis Town Levee Renovation
Solicitation # W912EQ27S0004
The United States Army Corps of Engineers, Memphis District, is conducting market research through a Sources Sought announcement for the St Francis Town Levee Renovation in St Francis, Arkansas. This project involves the construction of approximately 0.4 miles of new levee to provide flood protection, requiring roughly 70,000 cubic yards of compacted earthen material. The scope of work includes the installation of a 60 inch RCP culvert with dual closures, four levee ramps, a seepage berm, access roads, and borrow pit slough realignment and cleanup. All work must comply with the USACE Safety and Health Requirements Manual EM 385-1-1 and all applicable federal, state, and local regulations. The government intends to award this project as a competitive Invitation for Bid with a firm-fixed price contract, with an estimated construction value between 5 million and 10 million dollars. The anticipated award date is approximately March 30, 2027. Interested firms must submit a response by November 23, 2026, detailing their business size, bonding capability, and providing at least three examples of comparable work performed within the last five years. While this is not a solicitation for bids, the government is evaluating capabilities to determine the procurement method and potential set-aside status for small businesses, including HUBZone, SDVOSB, 8(a), or WOSB categories.
Other Heavy and Civil Engineering Construction

POSTED

3 days ago

DEADLINE

in 30 days
View Details
NAICS: 541380
New
Federal
Hickman Borings Drilling and Testing
Solicitation # W912EQ26QA050
Solicitation W912EQ26QA050 is a Firm Fixed Price request for geotechnical drilling and testing services issued by the USACE Memphis District. The primary objective is to recover intact samples of cemented sand and gravel from the bottom of the Mississippi River near Hickman, Kentucky, to support government engineering analyses. The scope of work requires the contractor to execute river-based rotosonic borings and rock coring at designated coordinates, perform laboratory testing, and integrate all resulting data into the Bentley OpenGround database. Field operations are specifically targeted for the low-water season, with a performance period requiring all field work to be completed by December 31, 2026, and all final deliverables submitted within 120 calendar days of award. The government will utilize the Lowest Price Technically Acceptable (LPTA) source selection process, awarding the contract to the responsible offeror with the lowest evaluated price who meets all technical requirements. Evaluation factors include technical capability and approach, relevant experience in marine geotechnical work, and total price. Offerors must submit a two-volume proposal consisting of administrative and price data in Volume I and a technical offer in Volume II, which is limited to 15 pages. Strict adherence to ASTM D4220 for sample preservation and packaging is required, and all payments will be processed electronically through the Wide Area Workflow system.
Testing Laboratories and Services

POSTED

4 days ago

DEADLINE

in 1 day
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS