MKBc10 - West Blue Rock Reclamation SOUTH
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The West Blue Rock Reclamation South project, managed by the ODNR Division of Mineral Resources Management, involves the reclamation of approximately 7,550 feet of unreclaimed highwalls and hazardous water bodies in Muskingum County, Ohio. Located near Roseville at 6575 Center Road, the scope of work covers a 36-acre footprint and includes the dewatering of 1.7 million gallons of water and the movement of 348,000 cubic yards of onsite soil to create backfill slopes. Additional requirements include the construction of access roads, sediment control installation, wetland creation, revegetation, and tree planting. The engineer's estimate for the project is 2,524,561.76 dollars. Interested parties must attend a mandatory pre-bid meeting on October 13, 2026, at 10:00 AM at the project site. The response deadline for this solicitation is October 29, 2026, at 5:30 PM. Project coordination is handled by project officer Jordan Binkley and project engineer Ron Warner.
General Info
NAICS
Place of Performance
OH, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Project Name: West Blue Rock Reclamation South
Project Description: The West Blue Rock Reclamation South Project is located in Brush Creek Township of Muskingum County. From the Intersection of S.R. 555 and S.R. 719 in Zanesville Ohio, Ohio travel South on State Route 555 for 6.25 miles and the entrance to the project is located on the right side of the road. The closest address is 6575 Center Road, Roseville, OH 43777. Coordinates for the site are Latitude: 39.83181 & Longitude: -81.98706.
The project consists of approximately 7,550 feet of existing unreclaimed highwalls and associated impoundments/hazardous water bodies from previous surface mining operations. These features are situated approximately 50 to 100 feet from Turkey Run. Dewatering of approximately 1.7 million gallons of water from the impoundments shall occur and then approximately 348,000 C.Y. of onsite soils shall be utilized to create the highwall backfill slopes of approx. 2.5:1. Project work shall occur on a construction footprint of approximately 36 total acres.
Additional work for the site shall include access road/staging area construction; installation of sediment control, clearing and grubbing, installation of temporary stream crossings, rock/concrete lined channels, temporary seeding, application of lime, revegetation, wetland creation, installation of farm gates, soil ripping and tree planting.
The project officer for this project is Jordan Binkley in the Cambridge Office (740) 260-0138 The project engineer is Ron Warner, P.E. in the Cambridge Office (740) 303-4209. Engineer's Estimate: $2,524,561.76 Project Location: The closest address is 6575 Center Road, Roseville, OH 43777. Coordinates for the site are Latitude: 39.83181 & Longitude: -81.98706. Pre-bid Meeting Location (Mandatory): 6575 Center Rd. Roseville, Ohio 43777
More opportunities from Ohio → ODNR-Division of Mineral Resources Management
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS