Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Ohio was posted on May 31, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Bellevue, Lyman, Esther and Burr - Water Main Replacement and Loop Closure

Closed
10007962State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont, North Carolina, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and significant upgrades to the Morgans Branch Pumping Station. The scope of work includes installing a new wet well and valve vault with associated appurtenances, as well as the demolition of existing pumps and piping. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days following the issuance of a Notice to Proceed. The contract is administered using EJCDC standard forms and will be awarded to the responsible bidder submitting the lowest responsive bid. Key requirements for bidders include the submission of bid security, evidence of authority to sign, and specific M/WBE compliance documentation, including a Good Faith Efforts Form and Table A. Participation goals are set at 10.9 percent for MBE and 10.4 percent for WBE per EPA guidelines, with a combined state goal of 10 percent. The contractor must provide performance and payment bonds, maintain insurance from providers with an A.M. Best rating of A-VII or better, and adhere to OSHA fall protection and various technical standards, including AWS D1.2 for welding and NEMA MG1 for motors. Payment will be processed in equal monthly amounts via EJCDC C-620 applications, with a 200,000 dollar contingency allowance available for authorized additional work.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in about 19 hours
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The City of Winchester is soliciting bids for the Jefferson Street Pump Station Replacement project in Virginia under solicitation ITB-2026141. The scope of work includes the construction of a new pump station featuring a precast concrete building, controls, and a standby generator, as well as site electrical work, yard piping, security fencing, grading, and paving. Additionally, the project requires the relocation of an existing fuel tank and the demolition of existing facilities. All work must be completed within 610 calendar days following the Notice to Proceed, with adherence to VDOT 2020 Road and Bridge Specifications and the City of Winchester Standards Manual. WG Construction is seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. Bids are due by 2:00 pm on November 12, 2026, via the City's e-Procurement Portal. The contract will be awarded to the lowest responsive and responsible bidder based on qualifications, compliance, and pricing. Requirements include a 5 percent bid guarantee, performance and payment bonds equal to 100 percent of the contract amount, and compliance with Davis-Bacon wage determinations and OSHA safety standards. Bidders must provide a minimum of three similar project references and confirm they are not on any government debarment lists.
WG Construction Co., Inc.

POSTED

about 6 hours ago

DEADLINE

in about 19 hours

AI Contract Overview

Show more

The contract involves a comprehensive water main replacement and roadway resurfacing project in Ohio, specifically targeting Bellevue Road, Lyman Road, Esther Street, and Burr Street. The scope includes installing approximately 720 feet of 8-inch diameter water main to replace existing 4-inch and 6-inch lines, as well as an additional 77 feet of 8-inch water main across Eleanor Avenue to close a loop on a dead-end main. The project also entails resurfacing Bellevue from W. Sylvania Avenue to Westbrook Drive, Lyman Road from Royalton Road to Eleanor Avenue, and Esther and Burr Streets from Front Street to Consaul Street. The work aims to improve water infrastructure and roadway conditions in the area, with the contract size estimated between $500,000 and $1.5 million, and responses due by June 17, 2025. Key contractual requirements include adherence to Project Labor Agreements (PLAs), which mandate the use of skilled local labor, prohibit strikes or lockouts during construction, and establish dispute resolution procedures. Contractors and subcontractors involved must sign and comply with these agreements, ensuring a coordinated labor effort. Additionally, the project requires compliance with tax exemption policies for materials incorporated into the work, as well as affidavits confirming child support obligations for relevant personnel. The overarching goal is to facilitate efficient, safe, and responsible construction, fostering local employment and ensuring adherence to legal and contractual standards. The project is managed under the jurisdiction of Ohio’s transportation and construction agencies, emphasizing responsible contracting practices and compliance with city and state regulations.

Documents

8
PDF, High priority: read this first1 page · specifications
High
PDF, High priority: read this first3 pages · bid-submittal-checklist
High
DOCX, High priority: read this first2 pages · letter-of-assent
High
PDF, Low priorityother
Low
DOC, Low priority3 pages · other
Low
PDF, Low priority18 pages · contract-document
Low
PDF, Low priority2 pages · fact-sheet
Low
PDF, Low prioritytax-exemption-certificate
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOhio → Transportation/Eng & Construction Mgmt
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
THIS PROJECT WILL INSTALL 720-FEET OF 8-INCH DIAMETER WATER MAIN TO REPLACE EXISTING 4-INCH & 6-INCH DIAMETER WATER MAIN ON BELLEVUE ROAD FROM W. SYLVANIA AVENUE TO EASTBROOK DRIVE. THIS PROJECT WILL RESURFACE BELLEVUE FROM W. SYLVANIA AVENUE TO WESTBOOK DRIVE.THIS PROJECT WILL INSTALL 77-FEET OF 8-INCH DIAMETER WATER MAIN BY HORIZONTAL DIRECTIONAL DRILLING ACROSS ELEANOR AVENUE TO CLOSE THE LOOP ON A DEAD END MAIN. THIS PROJECT WILL RESURFACE LYMAN ROAD FROM ROYALTON ROAD TO ELEANOR AVENUE. THIS PROJECT WILL INSTALL 600-FEET OF 8-INCH DIAMETER WATER MAIN TO REPLACE EXISTING 4-INCH DIAMETER WATER MAIN ON ESTHER STREET FROM FRONT STREET TO BURR STREET. THIS PROJECT WILL RESURFACE ESTHER AND BURR FROM FRONT STREET TO CONSAUL STREET.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS