Bello Reservoir Liner And Cover Replacement Project

Active
20261003010State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Bello Reservoir Liner and Cover Replacement Project, managed by the City of Pismo Beach, involves the comprehensive rehabilitation of a 470,000-gallon in-ground concrete potable water storage reservoir. The scope of work includes the removal and disposal of the existing floating cover, cleaning and repairing concrete surfaces and joints, and replacing a 12-inch PVC fill pipe. A new system consisting of a conductive underlayment, Enviro Liner 6040 geomembrane liner, and a CSPE floating flexible membrane cover will be installed. The project concludes with electrical liner leak location testing, disinfection, and returning the reservoir to service. Due to the site's location adjacent to Judkins Middle School, strict safety measures for public separation are required, and geomembrane seaming must adhere to specific temperature and wind limitations. The City is seeking both construction management services and a construction contractor. Consultants will be evaluated on a 100-point weighted scale focusing on qualifications, technical competency, and risk management, while the construction award will be based on the base bid among the three lowest bidders. The successful contractor must provide performance, payment, and a 10 percent maintenance bond, and must comply with State Prevailing Wage laws and DIR registration. All materials must be packaged and labeled according to ASTM D7865 standards. Proposals are due by 2:00 p.m. on October 29, 2026, and must be submitted exclusively through the City's electronic bidding platform.

General Info

City of Pismo Beach seeks contractors to rehabilitate the Bello water reservoir.

Place of Performance

Pismo Beach, CA, 93449, USA

Set-Aside

NONE

Documents

1

RFP - Bello Reservoir Liner and Cover Replacement CM Services

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Pismo Beach
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Daniel Contreras

Full Description

Show more
The project involves the removal and disposal of the existing floating cover system at Bello Reservoir, followed by cleaning and preparation of exposed concrete reservoir surfaces. Minor concrete crack and construction joint repairs will be completed, and the existing 12-inch reservoir fill pipe will be replaced. A new conductive underlayment, Enviro Liner 6040 geomembrane liner system, and CSPE floating cover system will be furnished and installed. The project also includes electrical liner leak location testing, disinfection, and returning the reservoir to service. The work site has limited access, is adjacent to an active school campus, and requires operations within a potable water facility. Geomembrane seaming is subject to weather limitations on temperature and wind.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements Redesign Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening, a new influent eccentric manhole, a concrete flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC, plumbing, and testing infrastructure. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as grading, earthwork, and asphalt resurfacing. This solicitation is open to small businesses and certified DBE, MBE, and WBE firms across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026. Primary coordination for this opportunity is handled by Christina Pauls at GSE Construction Co., Inc.
GSE Construction Co., Inc.

POSTED

about 6 hours ago

DEADLINE

in 15 days
View Details

More opportunities from California → City of Pismo Beach

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS