Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on October 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Bello Reservoir Liner And Cover Replacement Project

Closed
20261003010State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Bello Reservoir Liner and Cover Replacement Project, managed by the City of Pismo Beach, involves the comprehensive rehabilitation of a 470,000-gallon in-ground concrete potable water storage reservoir. The scope of work includes the removal and disposal of the existing floating cover, cleaning and repairing concrete surfaces and joints, and replacing a 12-inch PVC fill pipe. A new system consisting of a conductive underlayment, Enviro Liner 6040 geomembrane liner, and a CSPE floating flexible membrane cover will be installed. The project concludes with electrical liner leak location testing, disinfection, and returning the reservoir to service. Due to the site's location adjacent to Judkins Middle School, strict safety measures for public separation are required, and geomembrane seaming must adhere to specific temperature and wind limitations. The City is seeking both construction management services and a construction contractor. Consultants will be evaluated on a 100-point weighted scale focusing on qualifications, technical competency, and risk management, while the construction award will be based on the base bid among the three lowest bidders. The successful contractor must provide performance, payment, and a 10 percent maintenance bond, and must comply with State Prevailing Wage laws and DIR registration. All materials must be packaged and labeled according to ASTM D7865 standards. Proposals are due by 2:00 p.m. on October 29, 2026, and must be submitted exclusively through the City's electronic bidding platform.

General Info

City of Pismo Beach seeks contractors to rehabilitate the Bello water reservoir.

Place of Performance

Pismo Beach, CA, 93449, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstrfp
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 11 days
  • Lift Station No. 85 ReplacementOpen now, due in 22 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Pismo Beach
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Daniel Contreras

Full Description

Show more
The project involves the removal and disposal of the existing floating cover system at Bello Reservoir, followed by cleaning and preparation of exposed concrete reservoir surfaces. Minor concrete crack and construction joint repairs will be completed, and the existing 12-inch reservoir fill pipe will be replaced. A new conductive underlayment, Enviro Liner 6040 geomembrane liner system, and CSPE floating cover system will be furnished and installed. The project also includes electrical liner leak location testing, disinfection, and returning the reservoir to service. The work site has limited access, is adjacent to an active school campus, and requires operations within a potable water facility. Geomembrane seaming is subject to weather limitations on temperature and wind.

More opportunities from California → City of Pismo Beach

Same awarding agency

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS