This Solicitation opportunity from Georgia was posted on February 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Benton Boulevard Intersection Signalization
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves comprehensive demolition and site preparation work at the intersection of Benton Boulevard and West Mulberry Boulevard/Towne Center Drive in Georgia. The scope includes removing four existing traffic signs, approximately 513 square feet of sidewalk, various lengths of curb and gutter, traffic island surfaces, tactile paving, and pavement striping. Following demolition, the contractor is responsible for installing five concrete ADA ramps, new curb and gutter sections, heavy-duty asphalt pavement, and various thermoplastic pavement markings such as crosswalk striping, skip and solid striping, stop bars, and turn arrows. Additionally, the project requires furnishing and installing street signage, conduit and directional bore for signalization, and the complete setup of traffic signal and control boxes ready for operation. The contractor must also provide traffic control throughout the work and ensure proper offsite disposal of all demolition debris. This solicitation, titled “Benton Boulevard Intersection Signalization,” is issued by the City of Pooler and was posted in February 2026 with a response deadline in mid-March 2026. The contract aims to improve pedestrian accessibility and traffic control at a key intersection, with all pavement markings specified to be thermoplastic to ensure durability and visibility. The project includes detailed technical requirements for installation and removal tasks to enhance traffic flow and safety in the area.
General Info
Agency
Place of Performance
Set-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 3 days
- Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 7 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
