Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on February 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Benton Boulevard Intersection Signalization

Closed
PE-66418-NONST-2026-000000019State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting quotes for the North Hollywood Central Remediation Well Collector Line project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, covering site preparation, construction, and finishing services. Key activities include land surveying, site photography, subsurface investigation, tunneling, boring, jacking, micro tunneling, and the installation of utilities and cathodic protection. Additionally, the project requires asphalt paving, concrete drilling, saw cutting, welding services, landscaping, and the provision of materials such as ready mix and precast concrete. Environmental and safety requirements include storm water pollution prevention (SWPPP) and traffic control. This opportunity is set aside for Small Business (SB), SBA certified Women-Owned Small Business (WOSB), and Disadvantaged Business Enterprise (DBE) – Dept of Transportation. To be considered responsive, bidders must possess a valid California Contractor’s license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with Kiewit reimbursing the bond premiums. Bidders must also demonstrate an ability to foster and maintain labor harmony on the project. Interested firms should contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of December 16, 2026.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The contract involves comprehensive demolition and site preparation work at the intersection of Benton Boulevard and West Mulberry Boulevard/Towne Center Drive in Georgia. The scope includes removing four existing traffic signs, approximately 513 square feet of sidewalk, various lengths of curb and gutter, traffic island surfaces, tactile paving, and pavement striping. Following demolition, the contractor is responsible for installing five concrete ADA ramps, new curb and gutter sections, heavy-duty asphalt pavement, and various thermoplastic pavement markings such as crosswalk striping, skip and solid striping, stop bars, and turn arrows. Additionally, the project requires furnishing and installing street signage, conduit and directional bore for signalization, and the complete setup of traffic signal and control boxes ready for operation. The contractor must also provide traffic control throughout the work and ensure proper offsite disposal of all demolition debris. This solicitation, titled “Benton Boulevard Intersection Signalization,” is issued by the City of Pooler and was posted in February 2026 with a response deadline in mid-March 2026. The contract aims to improve pedestrian accessibility and traffic control at a key intersection, with all pavement markings specified to be thermoplastic to ensure durability and visibility. The project includes detailed technical requirements for installation and removal tasks to enhance traffic flow and safety in the area.

General Info

Demolition, ADA ramp installation, pavement markings, signalization, and traffic control at Benton Boulevard intersection.

Place of Performance

GA, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstitb
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 3 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 7 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Pooler
Contacts1 person available
OfficeN/A

Full Description

Show more
The work shall consist of the demolition and removal from the site four (4) existing traffic signs and approximately 513 SF of existing sidewalk, 71 LF of existing curb, 45 LF of existing curb and gutter, 178 SF of existing traffic island, 14 SF of existing tactile paving and 161 LF of existing pavement stripping. The contractor shall also furnish and install five (5) concrete ADA ramps, 14 LF of 18¿ normal curb and gutter, 37 SY of heavy duty asphalt pavement, 1,783 LF of 8 thermoplastic crosswalk striping, 243 LF of 4 thermoplastic skip striping, 114 LF of 4 thermoplastic solid striping, 142 LF of 24 thermoplastic stop bar, three (3) GDOT Type 3 thermoplastic turn arrows, street signage, 1,125 LF of 2 conduit, 244 LF of 6 directional bore and the traffic signal and control boxes complete and ready to operate. All pavement markings shall be thermoplastic. The project area is located at the intersection of Benton Boulevard and West Mulberry Boulevard/Towne Center Drive. The Contractor shall be responsible for providing traffic control at the site and for the offsite disposal of all items/debris to be demolished or removed.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS