Bert Crane Wastewater Treatment Plant Discharge Improvements Project

Forecast
2026010223State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Atwater is implementing the Bert Crane Wastewater Treatment Plant Discharge Improvements Project to meet Sustainable Groundwater Management Act requirements by enhancing the discharge of tertiary-treated effluent. The project involves constructing new conveyance and discharge facilities to allow the City to redirect effluent flows from the existing force main to the Merced Irrigation District via Black Rascal Creek or Bear Creek, providing flexibility to distribute flows between these creeks and Gallo Ranch. Common infrastructure for all proposed options includes the installation of a 42-inch tee, automatic actuated butterfly valves, an air relief valve, a magnetic flow meter, a new pump station, and an outfall structure with a flap valve, all integrated into the City's SCADA system. Three alignment alternatives are under consideration: Alternative 1 involves 4,400 linear feet of 18-inch pipeline and an outfall into Bear Creek; Alternative 2 includes 4,300 linear feet of pipeline and an outfall into Black Rascal Creek; and Alternative 3 involves 5,400 linear feet of pipeline, capacity increases to the Deckert Lateral, and a replacement outfall structure. Estimated project costs range from 5,476,773 dollars for Alternative 2 to 6,446,732 dollars for Alternative 3. The project is subject to extensive environmental review under CEQA, including a Draft Environmental Impact Report and consultations with the California Department of Fish and Wildlife and the Native American Heritage Commission to mitigate impacts on biological and tribal cultural resources. Compliance with the Storm Water Pollution Prevention Plan and Central Regional Water Quality Control Board standards is required for all construction and operational activities.

General Info

Atwater is upgrading wastewater discharge facilities with three pipeline alternatives for groundwater management.

Place of Performance

South Bert Crane Road and Oak Avenue alignment, Atwater, CA, 95301

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Atwater
Contacts2 people available
OfficeN/A
Organization / AgencyCalifornia → City of Atwater
Office AddressN/A
Contacts
Jonnie Hanson LanCommunity Development Director
Bonique EmersonVP of Planning

Interested Companies (1)

Full Description

Show more
The City of Atwater owns and operates the Bert Crane Regional Wastewater Treatment Plant (WWTP), located on the southeast corner of South Bert Crane Road and Oak Avenue Alignment (APN 056-200-026), which provides tertiary-level treatment for wastewater. Treated effluent from the WWTP is currently released via an effluent pump station and a 42-inch force main into the Atwater/Peck Drain, which flows through Joseph Gallo Farms (Gallo Ranch), where a significant portion is diverted for agricultural and wetland use. In order to meet Sustainable Groundwater Management Act (SGMA) groundwater recharge requirements, the City of Atwater intends to construct improvements to discharge its treated effluent to the Merced Irrigation District (MID) via Black Rascal Creek or Bear Creek. These improvements would connect into the existing force main with a tee fitting and automatic actuated butterfly valves integrated into the City’s Supervisory Control and Data Acquisition (SCADA) system. The improvements would allow the City to redirect effluent flows to the Gallo Ranch, the creeks, or both. A Discharge Study was prepared to evaluate three (3) alternatives for future improvements for discharge into either Black Rascal Creek or Bear Creek: Alternative 1 – Bert Crane Road Alignment, Alternative 2 – South WWTP Alignment, and Alternative 3 – Deckert Lateral Alignment. All three (3) alternatives share common infrastructure improvement recommendations, such as connecting to the existing force main from the WWTP, construction of a new pump station, and construction of an outfall structure. The following summarizes the recommended improvements that are applicable to each alternative: • Installation of a 42-inch x 42-inch x 18-inch tee • Installation of a 42-inch automatic actuated butterfly valve • Installation of an 18-inch automatic actuated butterfly valve • Installation of an air relief valve • Installation of an 18-inch magnetic flow meter • Construction of a pump station • Installation of power source and connection to City SCADA system • Construction of an outfall structure equipped with a flap valve. The alternative specific improvements are as follows: • Alternative 1 would include construction of 4,400 linear feet of 18-inch pipeline, traffic control, and flow diversion and dewatering. A new outfall structure into Bear Creek would be constructed. • Alternative 2 would include construction of 4,300 linear feet of 18-inch pipeline and flow diversion and dewatering. A new outfall structure into Black Rascal Creek would be constructed • Alternative 3 would include connection to the existing Deckert Lateral culvert, construction of 5,400 linear feet of 18-inch pipeline, increases to MIDs Deckert Lateral capacity, replacing the existing MID outfall structure to Black Rascal Creek, and traffic control.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, pumps, a generator, and odor control equipment, as well as the demolition of existing pumps and piping. Additional requirements include the installation of new gravity sewers, manholes, stormwater facilities, and site restoration. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on qualifications, financial ability, and compliance with M/WBE requirements, including the submission of Good Faith Efforts forms. Bidders must adhere to strict technical standards, such as AWWA Specification C-600 for pipelines and NEMA standards for motors. Contract administration is managed by Willis Engineers on behalf of the City of Belmont, utilizing EJCDC standard forms for agreements and payment applications. Required security includes performance and payment bonds, and insurance providers must typically maintain an A.M. Best rating of A-VII or better.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 1 day
View Details

More opportunities from California → City of Atwater

Same awarding agency

NAICS: 712120
SLED
Castle Air Museum Aviation Pavilion Project (RSO 0272-25, SP 25-10-0200, AR 25-10-0300)
Solicitation # RSO 0272-25, SP 25-10-0200, AR 25-10-0300
The Castle Air Museum Aviation Pavilion Project, managed by the City of Atwater, involves the multi-phased development of a 31.14-acre parcel located at 5050 Santa Fe Drive, Atwater, California. The project scope includes new building construction, site improvements, and the relocation of a pre-engineered metal building from Beale Air Force Base. Development is structured in three phases: Phase 1 includes a 60,000 square foot pavilion building, a 28,000 square foot roof covered area, and the relocation of the 9,600 square foot SR-71 Hangar. Phase 2 consists of a 50,000 square foot pavilion building, a 10,000 square foot cafe and gift shop, a 30,000 square foot roof covered area, and a parking lot with 177 stalls. Phase 3 involves the construction of an 80,000 square foot pavilion building. The project is subject to the California Environmental Quality Act (CEQA) and was approved on November 19, 2025, following a Mitigated Negative Declaration. Environmental compliance includes addressing biological, cultural, and geological concerns, as well as adhering to San Joaquin Valley Air Pollution Control District regulations. The Department of Toxic Substances Control has provided specific guidance regarding the protection of groundwater monitoring and extraction systems on the site. Administrative oversight is handled through Resolution RSO 0272-25, Site Plan Review SP 25-10-0200, and Architectural Review AR 25-10-0300, with verification of work performed through the standard building permit and inspection process.
Historical Sites

POSTED

11 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS