Bert Crane Wastewater Treatment Plant Discharge Improvements Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Atwater is implementing the Bert Crane Wastewater Treatment Plant Discharge Improvements Project to meet Sustainable Groundwater Management Act requirements by enhancing the discharge of tertiary-treated effluent. The project involves constructing new conveyance and discharge facilities to allow the City to redirect effluent flows from the existing force main to the Merced Irrigation District via Black Rascal Creek or Bear Creek, providing flexibility to distribute flows between these creeks and Gallo Ranch. Common infrastructure for all proposed options includes the installation of a 42-inch tee, automatic actuated butterfly valves, an air relief valve, a magnetic flow meter, a new pump station, and an outfall structure with a flap valve, all integrated into the City's SCADA system. Three alignment alternatives are under consideration: Alternative 1 involves 4,400 linear feet of 18-inch pipeline and an outfall into Bear Creek; Alternative 2 includes 4,300 linear feet of pipeline and an outfall into Black Rascal Creek; and Alternative 3 involves 5,400 linear feet of pipeline, capacity increases to the Deckert Lateral, and a replacement outfall structure. Estimated project costs range from 5,476,773 dollars for Alternative 2 to 6,446,732 dollars for Alternative 3. The project is subject to extensive environmental review under CEQA, including a Draft Environmental Impact Report and consultations with the California Department of Fish and Wildlife and the Native American Heritage Commission to mitigate impacts on biological and tribal cultural resources. Compliance with the Storm Water Pollution Prevention Plan and Central Regional Water Quality Control Board standards is required for all construction and operational activities.

General Info

Atwater is upgrading wastewater discharge facilities with three pipeline alternatives for groundwater management.

Agency

California → City of Atwater

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

South Bert Crane Road and Oak Avenue alignment, Atwater, CA, 95301

Set-Aside

NONE

Documents

(9)

Bert Crane WWTP Improvements Notice of Completion

PDFnotice-of-completion

Bert Crane Wastewater Treatment Plant Discharge Improvements Project - Notice of Availability

PDFspecial-notice

Bert Crane WWTP Discharge Improvements Initial Study December 2025

PDFinitial-study

Bert Crane WWTP Discharge Improvements Project - Public Review DEIR

PDFother

Bert Crane WWTP Improvements Notice of Preparation

PDFpresolicitation

Bert Crane Wastewater Treatment Plant Discharge Improvements Project - Summary Form

PDFother

CDFW Comment on Bert Crane Wastewater Treatment Plant Discharge Improvements Project NOP

PDFcomment

2026010223 NAHC Comment on Bert Crane Wastewater Treatment Plant Project

PDFcomment

Bort Creek Wastewater Treatment Plant Discharge Improvements Project - Notice of Completion

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Atwater
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Atwater
Office AddressN/A
Contacts
Jonnie Hanson LanCommunity Development Director
Bonique EmersonVP of Planning

Interested Companies (1)

Show more

Full Description

Show more
The City of Atwater owns and operates the Bert Crane Regional Wastewater Treatment Plant (WWTP), located on the southeast corner of South Bert Crane Road and Oak Avenue Alignment (APN 056-200-026), which provides tertiary-level treatment for wastewater. Treated effluent from the WWTP is currently released via an effluent pump station and a 42-inch force main into the Atwater/Peck Drain, which flows through Joseph Gallo Farms (Gallo Ranch), where a significant portion is diverted for agricultural and wetland use. In order to meet Sustainable Groundwater Management Act (SGMA) groundwater recharge requirements, the City of Atwater intends to construct improvements to discharge its treated effluent to the Merced Irrigation District (MID) via Black Rascal Creek or Bear Creek. These improvements would connect into the existing force main with a tee fitting and automatic actuated butterfly valves integrated into the City’s Supervisory Control and Data Acquisition (SCADA) system. The improvements would allow the City to redirect effluent flows to the Gallo Ranch, the creeks, or both. A Discharge Study was prepared to evaluate three (3) alternatives for future improvements for discharge into either Black Rascal Creek or Bear Creek: Alternative 1 – Bert Crane Road Alignment, Alternative 2 – South WWTP Alignment, and Alternative 3 – Deckert Lateral Alignment. All three (3) alternatives share common infrastructure improvement recommendations, such as connecting to the existing force main from the WWTP, construction of a new pump station, and construction of an outfall structure. The following summarizes the recommended improvements that are applicable to each alternative: • Installation of a 42-inch x 42-inch x 18-inch tee • Installation of a 42-inch automatic actuated butterfly valve • Installation of an 18-inch automatic actuated butterfly valve • Installation of an air relief valve • Installation of an 18-inch magnetic flow meter • Construction of a pump station • Installation of power source and connection to City SCADA system • Construction of an outfall structure equipped with a flap valve. The alternative specific improvements are as follows: • Alternative 1 would include construction of 4,400 linear feet of 18-inch pipeline, traffic control, and flow diversion and dewatering. A new outfall structure into Bear Creek would be constructed. • Alternative 2 would include construction of 4,300 linear feet of 18-inch pipeline and flow diversion and dewatering. A new outfall structure into Black Rascal Creek would be constructed • Alternative 3 would include connection to the existing Deckert Lateral culvert, construction of 5,400 linear feet of 18-inch pipeline, increases to MIDs Deckert Lateral capacity, replacing the existing MID outfall structure to Black Rascal Creek, and traffic control.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Federal
Z2NZ-- 658-23-108 Correct Stormwater Drainage
Solicitation # 36C24626B0031
Solicitation 36C24626B0031 is an Invitation for Bids (IFB) issued by the Department of Veterans Affairs Network Contracting Office 6 for Project 658-23-108, which involves correcting stormwater drainage at the Salem VA Medical Center in Salem, Virginia. The project is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with an estimated construction magnitude between $10,000,000 and $20,000,000. The scope of work includes providing all labor, materials, and equipment for general construction and utility work, specifically the installation of a dewatering system to control ground surface water during excavation. The performance period is 450 calendar days from the issuance of the Notice to Proceed. The contract will be awarded based on FAR Part 14 Sealed Bidding procedures, typically to the lowest responsive and responsible bidder. Eligible SDVOSB bidders must be registered in the System for Award Management (SAM) and are required to perform at least 25% of the construction work. Key requirements include a bid guarantee of at least 20% of the bid price (capped at $3,000,000), adherence to Davis-Bacon wage determinations, and the ability to demonstrate the completion of three similar projects within the last three years. The final bid submission deadline was extended to October 20, 2026, with a public bid opening on October 21, 2026.
246-NETWORK Contracting Office 6 (36C246)

POSTED

about 6 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 14 hours ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS