This Solicitation opportunity from Texas was posted on August 28, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Bid NO. 25-40 Tanyard Creek Lift Station Improvements & Expansion, Project #23-10-01

Closed
NO.25-40State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business designations, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by the deadline of December 4, 2026. The scope of work involves comprehensive sewer installation and site development, including the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Key structural requirements include the installation of standard and doghouse manholes, interior drop assemblies, and a CSO regulator fit out. Specialized tasks include 24-inch DIP trenchless crossings with associated launch and receiving shafts, as well as the abandonment of existing pipes and manholes. Site work entails clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Critical project deliverables include the maintenance of flows and bypass for all pipes and manholes to ensure operational continuity, along with geotechnical instrumentation and monitoring. Additionally, the project requires specific railroad insurance. The bid schedule outlines various general and contingent items, including mobilization and extra depth excavation, though the total estimated contract value is not specified.
Cleary Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer connections. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding the submission of MWBE documents, including the Good Faith Efforts Form and Table A. Performance is governed by EJCDC standard forms, including the C-700 General Conditions and C-800 Supplementary Conditions. The contractor is required to provide performance and payment bonds, as well as proof of insurance. Project timelines are triggered by a Notice to Proceed, and failure to achieve substantial completion will result in liquidated damages of 1,000 dollars per day. Payment is processed via applications for payment submitted to the Engineer, with terms due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

The contract pertains to the construction and expansion of the Tanyard Creek Lift Station in Huntsville, Texas, with an estimated project cost of approximately 4.39 million dollars. The scope involves removing and replacing the existing lift station while maintaining its operational status until the new facility is tested, commissioned, and accepted by the City. The work must be completed within 300 calendar days from the issuance of the Notice to Proceed. Bids are to be submitted in sealed envelopes marked with the project details by September 30, 2025, at 2:30 p.m. Central Time, with a non-mandatory pre-bid conference scheduled for September 9, 2025. The project is managed by the City of Huntsville, and documents including plans and specifications are accessible at the City Engineer’s Office, LJA Engineering, and online portals such as the City’s website, Electronic State Business Daily, CIVCAST, and Public Purchase. Analysis of the contractual clauses reveals no explicit references to federal or state standard clauses, nor are there detailed provisions regarding evaluation criteria, contractual amendments, or specific legal or regulatory citations. The bidding process is governed by straightforward requirements: bids must be sealed, properly marked, and submitted physically by the deadline, with the City reserving the right to reject any or all bids or accept the most advantageous proposal. The contract emphasizes operational continuity during construction, with the existing lift station remaining in service until the new one is fully tested and accepted. The performance period is set at 300 days, and the project location is the site of the lift station in Huntsville. No specific clauses regarding security, key personnel, or conflict of interest are present, and the evaluation process is primarily at the discretion of the City, with no detailed scoring or weighting criteria provided. Overall, the contract emphasizes straightforward procurement procedures, clear project timelines, and access to technical documents, with detailed technical and contractual specifics available in the full set of bid documents.

General Info

Documents

1

Bid No. 25-40: Tanyard Creek Lift Station Improvements & Expansion

DOC, High priority: read this firstitb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → City of Huntsville
Contacts1 person available
OfficeN/A
Organization / AgencyTexas → City of Huntsville
Office AddressN/A

Full Description

Show more
Tanyard Creek Lift Station Improvements & Expansion

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS