This Solicitation opportunity from Florida was posted on May 30, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Bid Results - BDC49-24/25 Topsail Hill - Facilities Redevelopment

Closed
BDC49 - 24/25State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between 80 million and 100 million dollars, with a solicitation expected around March 15, 2027. Construction is slated to begin in September 2027 and span approximately two years, divided into two dredging seasons ending August 31, 2029. The scope involves the mechanical dredging of approximately 5.5 million cubic yards of material using closed clamshell buckets. The work is divided into two primary sequences. First, the contractor must construct a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, which includes digging an access channel and excavating 3.2 million cubic yards of material for disposal at four designated sites. Second, the contractor will perform maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth, removing approximately 2.3 million cubic yards of material to be placed in the newly constructed CAD cell. Strict operational requirements include maintaining a production rate of 300,000 cubic yards every 30 calendar days, working 24 hours a day, 7 days a week. All activities must adhere to prescribed environmental windows to protect aquatic wildlife, and extensions to these windows are not permitted. Interested firms must demonstrate experience with mechanical dredging at the required production rate and open water placement in New England during winter months. Capabilities packages are due by December 3, 2026.
W2SD Endist New England

POSTED

about 5 hours ago

DEADLINE

in about 1 month

Documents

1

BDC49 24-25 Alternate included - Bid Results.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Department of Environmental Protection
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
TABULATION OF BIDS, BID NUMBER: BDC49-24/25OPENING DATE AND TIME: May 22, 2025, 3:30 PM ETTopsail Hill – Facilities Redevelopment Vendor Base Bid Alternate #1 Total Bid Floridian Construction & Dev. Co. Inc. $1,462,980.00 $165,816.00 $1,628,796.00P.O. Box 2412Santa Rosa Beach, FL 32459(850) 305-9580 2. Inland Construction & Engineering, Inc. $1,582,766.00 $85,000.00 $1,667,766.001243 Jenks AvenuePanama City, FL 32401(850) 872-2129 3. MKM Quality Construction, Inc. $1,556,680.00 $149,620.00 $1,706,300.001220 Sleepy Hollow RoadMexico Beach, FL 32456(850) 955-4663 4. Loftis Marine LLC $1,645,000.00 $185,000.00 $1,830,000.002106 W Gimble StreetPensacola, FL 32502(850) 619-3395 5. Empire Builders Group, Inc. $3,007,931.44 $394,732.69 $3,402,664.131220 Sleepy Hollow RoadMexico Beach, FL 32456(850) 955-4663 Posting period begins at 5:00 pm ET on Friday, May 30, 2025, and ends at 5:00 pm ET on Wednesday, June 4, 2025. Bids were opened by: Ralph Perkins, Contracts Section Leader Bids were witnessed by: Alisha Sadler, Government Operations Consultant II NOTE: All bids/proposals accepted by the Department are subject to the Department/State's terms and conditions and any and all additional terms and conditions submitted by the bidders/proposers are rejected and shall have no force and effect. Offers from the vendors/contractors listed herein are the only offers received timely as of the above opening date and time. All other offers submitted in response to this solicitation, if any, are hereby rejected as late. Failure to file a protest within the time prescribed in section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under chapter 120, Florida Statutes. Anticipated Award: Floridian Construction & Dev. Co. Inc.

More opportunities from Florida → Department of Environmental Protection

Same awarding agency

NAICS: 236220
New
SLED
Bid Results and Anticipated Award BDC08-26-27 Charlotte Harbor - Maintenance Building Replacement
Solicitation # BDC08-26/27
The Florida Department of Environmental Protection, Bureau of Design and Construction, is soliciting formal, competitive, sealed bids for the replacement of the maintenance building at Charlotte Harbor Preserve State Park under solicitation number BDC08-26/27. The project requires the contractor to provide all labor, materials, equipment, supervision, and permitting necessary for the facility's replacement. Key technical requirements include the installation of a new 400A, 1 phase electrical panel, the use of St. Augustine sod for site restoration, and adherence to 2023 plumbing codes and green building standards pursuant to Executive Order 07-126 and Section 255.252(3), F.S. The contractor is also responsible for all concrete and compaction testing and must provide sample selections for window colors for agency approval. Bids must be submitted by 3:30 PM ET on October 22, 2026, to Contracts Specialist Logan Lee-Marple in Tallahassee, Florida. To avoid rejection, bidders must include signed copies of all addenda, including Addendum No. 2, which provides critical clarifications on door jambs, window colors, and structural tie beams. Applicants must be pre-qualified through the Bureau of Design and Construction or provide a current State Contractor license and Corporate Charter registration. Additionally, the selected vendor must utilize the U.S. Department of Homeland Security’s E-Verify system for all employees and subcontractors and maintain a builder's risk insurance policy.
Commercial and Institutional Building Construction

POSTED

about 5 hours ago

DEADLINE

in 5 days
View Details
NAICS: 238160
New
SLED
Addendum 1 BDC10-26/27 Dr. Von D. Mizell-Eula Johnson State Park – Education Center Roof Replacement
Solicitation # BDC10-26/27
The Florida Department of Environmental Protection, Bureau of Design and Construction, is soliciting formal, competitive, sealed bids for the roof replacement of the Education Center at Dr. Von D. Mizell-Eula Johnson State Park in Dania Beach, Florida. The scope of work requires the contractor to provide all labor, materials, equipment, supervision, and permitting necessary to complete the project. Key requirements include adherence to local, federal, and state code compliance, maintenance of manufacturer warranties, and construction in accordance with green building standards per Executive Order 07-126 and Section 255.252(3), F.S. Bidders must include the cost of Builders Risk insurance in their bid price and utilize the U.S. Department of Homeland Security’s E-Verify system for all employees and subcontractors. Bids are due by 3:30 pm ET on October 28, 2026, and must be submitted to Contracts Specialist Logan Lee-Marple. To avoid rejection, submissions must include a signed copy of Addendum No. 1, which clarifies that bidders are responsible for providing all materials necessary to meet code and warranty requirements, specifically regarding hard foam board, valley strips, and fire barriers. Additionally, bidders must provide a biennial pre-qualification letter from the FDEP Bureau of Design and Construction or, if not pre-qualified, a current State Contractor license certification and Corporate Charter registration. The agency also encourages diversity in all sub-contracting opportunities.
Roofing Contractors

POSTED

5 days ago

DEADLINE

in about 3 hours
View Details
NAICS: 237990
SLED
ITB: BDC07-26/27 - Long Key State Park – Long Key Beach Nourishment and Campground Rebuild
Solicitation # BDC07-26/27
The Florida Department of Environmental Protection, Bureau of Design and Construction, is soliciting formal, competitive, sealed bids for the Long Key State Park Beach Nourishment and Campground Rebuild project, solicitation number BDC07-26/27. The scope of work requires the contractor to provide all labor, materials, equipment, supervision, and permitting necessary for the campground modification project at Long Key State Park in Long Key, Florida. All work must be designed and constructed in accordance with applicable green building standards pursuant to Executive Order 07-126 and Section 255.252(3), F.S. Bids must be submitted no later than 3:30 pm ET on Thursday, November 12, 2026, to Alisha Sadler at the Bureau of Design and Construction in Tallahassee. Bidder prequalification is mandatory; applicants must provide a biennial pre-qualification letter from the FDEP or, if not pre-qualified, submit a current State Contractor license certification and Corporate Charter registration. Additionally, the selected contractor must utilize the U.S. Department of Homeland Security’s E-Verify system for all employees and subcontractors. The Department encourages the use of diverse subcontractors to reflect the citizenship of Florida and ensures ADA accessibility for all bid-related activities.
Other Heavy and Civil Engineering Construction

POSTED

20 days ago

DEADLINE

in 15 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS