Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on March 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Big Canyon Restoration Project - Phase 3

Closed
9532-1State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Public Works

POSTED

about 9 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The Big Canyon Restoration Project - Phase 3 involves comprehensive construction work aimed at restoring and stabilizing the area, including all incidental tasks necessary to complete the project effectively. The contract emphasizes the importance of project phasing, as outlined in Section 7-7.1, to mitigate the risk of mass erosion during storm events, with specific requirements for a Storm Water Pollution Prevention Plan (SWPPP) incorporating best management practices (BMPs). The scope of work is detailed in the special provisions, ensuring all aspects of the restoration are addressed to meet project goals. This solicitation, posted by the City of Newport Beach, California, on March 26, 2025, invites responses by May 6, 2025. The project is classified under NAICS code 237990 and is valued between one million and five million dollars. The contract is managed by Bob Stein, whose contact information is provided for inquiries. The project is part of a larger effort to improve and protect the Big Canyon area, with the work performed within California under the jurisdiction of the City of Newport Beach.

General Info

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Newport Beach
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The work necessary for the completion of thiscontract consists of the following items and all other incidental work items necessary to completethe work in place. See Section 7-7.1 for a suggested project phasing guide to reduce the threat ofmass erosion during a storm event and additional detail on the best management practices (BMPs)to be included in Contractor’s Storm Water Pollution Prevention Plan (SWPPP).Please see the special provisions for the full scope of services.

More opportunities from California → City of Newport Beach

Same awarding agency

NAICS: 237310
SLED
On-Call Asphalt, Concrete And Concrete Grinding Repair Services
Solicitation # RFB 27-14
The City of Newport Beach is soliciting bids for RFB 27-14 to secure on-call asphalt, concrete, and concrete grinding repair services. The contract is estimated at 1,250,000 dollars and will run from July 1, 2026, through June 30, 2029. Services are provided on an as-needed basis and authorized via individual Letter Proposals under a time-and-expense framework. The scope of work includes citywide street repairs, such as full and partial depth asphalt and concrete replacement and street marking, as well as concrete flatwork for sidewalks, access ramps, and curbs. Additionally, the contractor must perform sidewalk grinding to reduce tripping hazards using specific dry vertical carbide equipment to meet a 1 inch to 1 foot ratio. All work must adhere to City Standards, the Greenbook, and ADA requirements. To be eligible, contractors must possess a valid California State Contractor License Classification A and have at least five years of experience performing similar repairs for local governments, supported by three satisfactory references from the last three years. Mandatory requirements include registration with the California Department of Industrial Relations and the maintenance of a Newport Beach business license. Bidders must provide a Bidder's Bond or a deposit of at least 10 percent of the bid price. Insurance requirements are stringent, requiring 5,000,000 dollars in Pollution Liability, 1,000,000 dollars in Automobile Liability, and 1,000,000 dollars in Workers Compensation, with general liability maintained for ten years post-completion. Bids must be submitted electronically via PlanetBids by October 15, 2026, at 1:00 PM.
Highway, Street, and Bridge Construction

POSTED

27 days ago

DEADLINE

in 18 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS