This Solicitation opportunity from Minnesota was posted on October 23, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Big Rice Lake Outlet Stream Restoration
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract pertains to the Big Rice Lake Outlet Stream Restoration project, designated as State Project No. 2026-343-8W251, and is targeted towards economically disadvantaged veteran-owned businesses under a single prime contract. The scope of work includes site preparation activities such as excavation, grading, and shaping of an access road to facilitate construction traffic, along with clearing and grubbing of the area. Additionally, the project involves the excavation and removal of existing rock material from the outlet stream, followed by the furnishing and placement of rock boulders, base rock, and chinking rock to stabilize the stream environment. Erosion control measures and vegetation establishment are also key components to ensure long-term site stability and ecological restoration. The project plans and specifications are provided by the Minnesota Department of Natural Resources, with primary contact being Jon Hendrickson. The solicitation was posted on October 23, 2025, with a response deadline of November 13, 2025. The contract value is estimated to range between $500,000 and $1,500,000, and the project is managed by the Minnesota Department of Administration under the NAICS code 561730, which pertains to landscaping services. Interested parties can access additional details and submit responses through the provided online platform.
General Info
Agency
Place of Performance
MN, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
This Project is Targeted Group (TG) Economically Disadvantaged (ED) Veteran-Owned preference. A. The work will be completed under one prime contract. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract.
1. Excavation, Grading, and Shaping of current access road to allow for construction traffic 2. Clearing and Grubbing 3. Excavation and Removal of current rock material at outlet stream 4. Furnish and Place Rock Boulders, Baserock, and Chinking Rock material 5. Erosion Control and Vegetation Establishment
Plans and Specifications were prepared by the Minnesota Department of Natural Resources, Contact: Jon Hendrickson at 218-834-1410
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
