This Solicitation opportunity from Pennsylvania was posted on November 4, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Big Ridge Sanitary Sewer Relocation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the construction of an 8-inch high-density polyethylene (HDPE) sanitary sewer force main beneath Pond Creek utilizing horizontal directional drilling techniques. This project aims to replace the existing sewer line attached beneath the Big Ridge Drive bridge, with all work to be executed in strict accordance with the detailed specifications outlined in the Project Manual. The scope includes site preparation, trenchless installation, utility connections, pavement restoration, and environmental protections, supported by comprehensive construction plans, geotechnical reports, and technical standards. The work is overseen by Middle Smithfield Township in Monroe County, Pennsylvania, with an estimated project value ranging from $200,000 to $500,000, though specific bid prices are not provided. Bidders are required to submit their proposals electronically via PennBid by December 4, 2025, following detailed instructions for bid formatting, submission, and compliance with wage and safety standards. The contract documentation encompasses a broad set of contractual and technical documents, including bid specifications, general and supplementary conditions, detailed construction plans, geotechnical reports, and supporting exhibits such as bonds and insurance certificates. The specifications specify quality assurance measures aligned with ASTM standards and PennDOT guidelines, emphasizing proper concrete placement, testing, and environmental controls. While the contract does not explicitly incorporate FAR clauses, it references internal contractual articles and project-specific provisions, including change procedures, safety requirements, and environmental protections. The procurement process emphasizes responsibility and responsiveness, with award criteria primarily based on the lowest responsible bid that meets all technical and compliance requirements. The project schedule is defined by the period of performance starting shortly after contract award, with no fixed completion date specified in the available documents. Overall, the contract establishes a comprehensive framework for the design, construction, and inspection of the sewer relocation, ensuring adherence to environmental, safety, and technical standards throughout the project lifecycle.
General Info
Place of Performance
PA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
