This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on October 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Big Springs Horse Corral Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Solicitation 1240LT26Q0179 is a total small business set-aside for the Big Springs Horse Corral Replacement project located in the Westside Ranger District of the Caribou-Targhee National Forest in Caribou County, Idaho. The project requires the supply and installation of a 20 by 60 foot four-rail divided steel oil pipe corral with concrete post embedment. The contractor is responsible for all mobilization, clearing and grubbing, and the implementation of temporary traffic control measures, including closing local traffic and posting public notices for the duration of the work. There are two optional award items: the construction of one additional 20 by 60 foot corral and the installation of a hitching rail. The contract is a firm fixed price agreement with an estimated performance period from June 1, 2027, through July 31, 2027, allowing for 61 calendar days for completion. Award will be made to the lowest technically rated offeror with fair and reasonable pricing and acceptable or neutral past performance, evaluated via an experience questionnaire focusing on general construction and concrete work. Payment bonds are required for contracts exceeding 35,000 dollars. The project is subject to the Davis-Bacon Act, requiring prevailing wage rates and specific paid sick leave and minimum wage standards. Bids must be submitted to the USDA Forest Service by October 29, 2026.
General Info
Place of Performance
Lava Hot Springs, ID, 83246, USASet-Aside
Documents
11AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Manhole RehabilitationOpen now, due in 13 days
- MAIN WASTEWATER TREATMENT PLANT SECONDARY REACTORS REHABILITATION,PHASE 2, SPECIFICATION SD-462Open now, due in 4 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Amendment P0002 is being published to revise Period of Performance date in the SOW/SPECS document to match the Request For Quote.
This project includes supply and installation of steel oil pipe for one 20'x60' corral with three pens and concrete for post embedment, including temporary traffic control. Local traffic shall be closed during construction with temporary traffic control measures inplace. Including sign stating horse corrals are closed to public for the duration of project.
Optional work that may be awarded includes all work described above associated with:
1.Option #1: Supply and construct one additional 20'x60' corral with three pens.
2.Option #2: Supply and install hitching rail.
More opportunities from Department Of Agriculture → Csa Intermountain 8 Usda-Fs
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
