Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Big Steel Tank — Fire Hardening Pump Station

Active
20260829032State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → San Lorenzo Valley Water DistrictView Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Boulder Creek, CA, 95006, USA

Set-Aside

NONE

Documents

(3)

Big Steel Tank Pump Station - Drawings.pdf

PDF

RFP Volume I - Big Steel Tank Fire Hardening Pump Station.pdf

PDF

RFP Volume II - Big Steel Tank Fire Hardening Pump Station.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Lorenzo Valley Water District
Contacts3 people available
OfficeN/A
Organization / Agency
California → San Lorenzo Valley Water District
View Agency Profile
Office AddressN/A
Contacts
Garrett Roffe
Leah Mattle

Full Description

Show more
The project involves the complete demolition and removal of the existing wood-framed pump station structure, including all wood and roof framing, and portions of the foundation. The work includes the construction of new reinforced concrete masonry unit (CMU) walls, a new fire-resistant metal roof structure, and a new perimeter grade beam. Existing equipment must remain in place and operational throughout construction. The Contractor is responsible for protecting all existing equipment from damage. If temporary shutdowns of equipment or utilities are required, the Contractor must provide all necessary temporary services and utility connections to maintain continuous operation of the pump station.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
The Northlands Job Corps Center, operated by Education and Training Resources (ETR), is soliciting bids for a firm fixed price subcontract to perform comprehensive bathroom renovations in two dormitory buildings located in Vergennes, Vermont. The project involves the renovation of four bathroom areas in Building 17, totaling approximately 944 square feet, and five bathroom areas in Building 18, totaling approximately 1,260 square feet. The scope of work includes the demolition of existing fixtures and the installation of institutional-grade shower pans, vitreous China toilets, high-pressure plastic laminate countertops, porcelain flooring, and LED lighting. All work must comply with ADA, OSHA, and applicable building, plumbing, and electrical codes, including the National Electrical Code and NFPA 101 Life Safety Code. To maintain center operations, contractors must renovate the dormitories one at a time. Bidders may submit a unified proposal for both buildings or standalone bids for each. To be considered, responses must include a completed bid sheet, a detailed cost breakdown separating materials and labor, a proposed project schedule, and proof of current Vermont state professional licensing. The winning bidder must maintain an active registration in SAM.gov with a Unique Entity ID. Depending on the contract value, payment and performance bonds may be required for projects exceeding 35,000 dollars. Additionally, contractors must provide certificates of insurance for Builders Risk, Automobile, Liability, and Workers Compensation, and certify compliance with the Davis Bacon Act and prevailing wage laws. Payment terms are net 30 days upon satisfactory receipt of services and a proper invoice. ETR serves as the sole judge for award selection, and the lowest bid does not guarantee a contract award.
Northlands Job Corps Center /ETR

POSTED

about 4 hours ago

DEADLINE

in 13 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation by J & J Contractors, Inc. involves the construction of the P1102 Weapons Magazine and Ordnance Operations Facility at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and encompasses the construction of six Containerized Long Weapons Storage units, two Box G, and one Box H earth-covered high-explosive magazines. The scope includes comprehensive site work such as clearing, rock excavation, and wetland mitigation, as well as the installation of specialized foundations using rigid inclusions and load transfer mats. Additional requirements include the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The technical scope covers a wide range of trades, including structural steel, concrete, masonry, electrical utilities, mechanical, plumbing, and fire protection. Key installations include overhead cranes, grounding and lightning protection systems, intrusion detection systems, and extensive paving for access roads and loading areas. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Interested parties must respond by October 31, 2026, and should contact Rahul Maheshwari to obtain bid invites and access to the full project documentation.
J & J Contractors, Inc

POSTED

about 4 hours ago

DEADLINE

in about 2 months
View Details

More opportunities from California → San Lorenzo Valley Water District

Same awarding agency

NAICS: 115310
SLED
Slvwd Infrastructure Protection
Solicitation # 20260805002
The San Lorenzo Valley Water District is seeking proposals under solicitation number 20260805002 for vegetation management services to protect critical infrastructure across its 2,300-acre landholdings in Scotts Valley, California, primarily within High and Very High Fire Risk Zones. The contract is structured as a Time and Material Not-to-Exceed arrangement, with no predetermined ceiling value, and work is anticipated to commence in late September 2026, potentially extending into the following year. The primary objective is to reduce wildfire hazards through mechanical clearing using mowers, chainsaws, and chippers, removal of ladder fuels, debris chipping to no more than three inches depth, erosion control, and protection of biological and cultural resources during operations limited to weekdays between 8 AM and 5 PM, excluding Red Flag Days and holidays. Proposers must demonstrate a robust understanding of fire safety protocols, species protection measures, and environmental compliance, particularly regarding avoidance of impacts to protected species like the California red-legged frog and woodrat nests, and immediate reporting of any discovered cultural resources. The evaluation process prioritizes proposed cost or fee at 55%, followed by project understanding and technical approach at 25%, and relevant experience, qualifications, and past performance at 20%. Cost proposals are scored using a formula based on the lowest received bid relative to the proposer’s submission, while technical factors are assessed narratively without predefined adjectival ratings. Award will be based on trade-off analysis, favoring best value rather than lowest price technically acceptable. Offerors must submit a Statement of Qualifications limited to fifteen pages in PDF format, including a cover letter, scope and technical approach, contractor identification, subcontractor disclosures if applicable, and cost estimates with detailed schedules. Required disclosures include bankruptcy history, prior contract defaults, and litigation within the past five years, along with full subcontractor identification. Environmental and operational requirements mandate adherence to CEQA exemptions, installation of erosion controls such as wattles and fiber rolls, immediate spill response, prohibition of open flames and pesticides, and maintenance of daily work logs with photographic documentation. Insurance requirements include general liability, workers’ compensation, and auto liability. Proposals are due by 3:00 p.m. local time on September 3, 2026, and must be submitted electronically via email to Janelle Vasquez-Nicholas. No formal FAR clauses, CLINs, or funding codes are included, indicating a locally administered procurement without federal acquisition structure
Support Activities for Forestry

POSTED

27 days ago

DEADLINE

in 3 days
View Details