Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Missouri was posted on October 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Bituminous Pavement Cold Milling

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. This comprehensive infrastructure project requires a wide array of specialized services and materials, including land surveying, site photography, tunneling, boring, jacking, micro tunneling, and the installation of utilities, cathodic protection, and steel casing. Additional requirements encompass site preparation, shoring, subsurface investigation, SWPPP, asphalt paving, landscaping, and the supply of ready mix and precast concrete. The solicitation is open to qualified Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. A critical requirement is that responsible subcontractors and material contractors must provide bonding for 100 percent of their contract value, though Kiewit will reimburse the associated bond premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system, with a response deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 10 days
NAICS: 237310
New
SLED
STP-011-2(046) VOLCANO RD REHAB, OSHIRO RD TO ALII KOA ST
Solicitation # B27000729
The Hawaii Department of Transportation is soliciting bids for the Volcano Road Rehabilitation project, spanning from Oshiro Road to Alii Koa Street in Lanai, Hawaii. The scope of work focuses on comprehensive roadway reconstruction and maintenance, including cold planing, resurfacing, the reconstruction of weakened pavement areas, pavement marking and striping, guardrail improvements, and the installation of milled rumble strips. Key deliverables include the leveling of roadway dips using A.C. Mix No. V and the deployment of Type II OM warning signs. The project mandates strict adherence to environmental mitigation, including NPDES Permit requirements for water pollution and erosion control, and requires that all lanes remain open during morning peak hours from 6:00 a.m. to 8:00 a.m. Contractual compliance requires the submission of performance and labor and material payment bonds, as well as certifications for Workers' Compensation and Temporary Disability Insurance. The project is subject to the Davis-Bacon and Related Act and the Contract Work Hours and Safety Standards Act. Technical acceptance is based on the Mean Roughness Index for pavement smoothness, with specific HMA tolerances for asphalt content and mixture temperature. Specialty items for the project include hot mix asphalt pavement, guardrails, and work zone traffic control. Bidders must submit their proposals via the HIePRO portal, with a virtual pre-bid conference scheduled for November 16, 2026.
Department of Transportation

POSTED

about 20 hours ago

DEADLINE

in 27 days

AI Contract Overview

Show more

This subcontract opportunity involves the removal of existing road surfacing for bridge replacement projects managed by the City of St. Louis Board of Public Service. The selected contractor will work under prime contractors to utilize cold milling machines for the removal of bituminous pavement that is three inches thick or less, covering a total area of 648 square yards. The primary objective is to deliver a milled surface that is fully prepared for subsequent paving operations. The project falls under NAICS code 237310 and was posted on October 15, 2026. Interested parties must submit their responses by the deadline of October 27, 2026. Further details regarding the solicitation can be accessed through the provided BidExpress link.

General Info

Subcontract for cold milling 648 square yards of road surfacing in St. Louis.

Documents

This scope was carved out of 8798.

The full solicitation package (23 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

8798

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMissouri → City of St. Louis Board of Public Service
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs removal of existing road surfacing for prime contractors on City of St. Louis Board of Public Service bridge replacement projects. Utilizes cold milling machines to remove bituminous pavement 3 inches thick or less across 648 SY. Delivers a milled surface ready for subsequent paving.

More opportunities from Missouri → City of St. Louis Board of Public Service

Same awarding agency

NAICS: 237310
New
SLED
8801
Solicitation # 8801
Solicitation 8801, project SP-125, is issued by the City of St. Louis Board of Public Service for the removal and replacement of concrete and brick sidewalks and the installation of complete sidewalks in Missouri. The scope of work includes asphalt and concrete paving, brick unit paving, granite curb installation, and tactile warning surfacing, with a total contract performance period of 280 working days. The contract will be awarded to the responsive low bidder, provided they meet specific M/WBE participation goals, which include a minimum of 24% MBE participation and 11% WBE participation. Bidders must submit their proposals online via Bid Express by December 8, 2026, and provide a bid deposit of 26,475.00 dollars. The project requires strict adherence to Job Special Provisions and the Standard Manual for Public Works Construction. Key compliance requirements include OSHA ten-hour certification for on-site employees and thirty-hour certification for supervisors, as well as the submission of an Unauthorized Alien Employee Affidavit and a Certification of Non-Debarment. Materials, particularly pavement-marking supplies, must be delivered in original, unopened packaging and stored according to manufacturer specifications. Payment will be made through monthly progress invoices based on bid prices, less a retained amount, with the first invoice due within 60 days of project start. The President of the Board of Public Service maintains final authority over work acceptance and the approval of contingency authorizations.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
8798
Solicitation # 8798
The Union Lindell Bridge Replacement project, identified as Federal Project Number STP-9901(663) and Letting 8798, is a comprehensive reconstruction effort located in St. Louis, Missouri. Managed by the City of St. Louis Board of Public Service, the scope of work includes extensive roadway construction such as earthwork, asphalt and concrete paving, and the installation of mechanically stabilized earth wall systems with lightweight fill for the north and south walls. The project also involves critical structural work over Forest Park Parkway and the MetroLink Railway, requiring adherence to specific Metro engineering standards for trackwork and catenary pole foundations. The estimated performance responsibility value for the project is 27.41 million dollars, with a completion timeline of 452 working days and liquidated damages set at 4,300 dollars per day. Bidders are evaluated based on the apparent low bid and their proposed utilization of certified Disadvantaged Business Enterprises (DBE), including a requirement to demonstrate good faith efforts toward DBE goals. Compliance requirements are stringent, including mandatory enrollment in E-Verify, adherence to the Buy America Certification for iron and steel, and payment of the higher of Missouri state or federal Davis-Bacon prevailing wage rates. Additionally, contractors must provide a ten-hour OSHA Construction Safety Program for all on-site employees. Bids must be submitted electronically via the Bid Express Online Portal, accompanied by a 5 percent bid deposit and various legal certifications, including an affidavit regarding relationships with the City and compliance with the Anti-Discrimination Against Israel Act.
Highway, Street, and Bridge Construction

POSTED

4 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS