Blackpine Lake Campground

Active
AG-05GG-S-10-0058Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The USDA Forest Service, Okanogan-Wenatchee National Forest, is seeking construction services for the reconstruction of the Blackpine Lake Campground, located in the Methow Valley Ranger District near Twisp, Washington. The project involves significant upgrades to the campground infrastructure, including widening and surfacing existing roads with aggregate and pavement, constructing new roads and turnouts, and modifying camp spurs by reconstructing most and adding some new ones while removing a few. The project also includes enhancement of the boat launch area, with road widening and paving to improve access, expansion of the lower parking lot to accommodate 15 vehicles, removal and replacement of two floating docks, and construction of a new accessible paved trail. Blackpine Lake itself is a 20-acre area supporting non-motorized boating, and the campground features 20 campsites across two primary loops and a smaller tent-only and day-use area. This contract will be awarded as a firm-fixed price agreement, with proposals comprising both technical and price components expected in spring 2011. The estimated construction cost exceeds $100,000. It is designated as a HUBZone set-aside, encouraging participation from qualified businesses in designated historically underutilized business zones. The project site is accessed via a combination of paved and gravel roads through mountainous terrain, with a required road subgrade width varying between 14 to 24 feet depending on the location. Key contacts for the project include the contract specialist and procurement technician for the forest service office in Wenatchee, Washington. Additional documents such as pre-proposal meeting notes, photographs, and a conceptual site plan are available to inform interested bidders about site conditions and project requirements.

General Info

USDA Forest Service seeks contractor for $100K+ Blackpine Lake Campground infrastructure upgrades.

Agency

Department Of Agriculture → Okanogan-Wenatchee National ForestView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Blackpine Lake Campground, WINTHROP, WA, 98862, USA

Set-Aside

HZC

Documents

(3)

Blackpine+CG_Conceptual+Siteplan.pdf

PDF

Pre+Proposal+Meeting+Notes+Blackpine+Lake+Campground.docx

DOCX

Pre+Proposal+Pictures.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
Posted

special-notice

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Okanogan-Wenatchee National Forest
Contacts2 people available
OfficeWENATCHEE, WA, 98801, USA
Organization / Agency
Department Of Agriculture → Okanogan-Wenatchee National Forest
View Agency Profile
Office AddressWENATCHEE, WA, 98801, USA
Contacts
Mariah R MorrisContract Specialist
Ellen R. KinamonProcurement Tech

Full Description

Show more
Blackpine Lake Campground The following information is currently posted for information purposes only. A pre-proposal meeting was conducted on September 28, 2010. Meeting notes and pictures of this meeting are posted as attachments to this notice. The solicitation with scope of work, specifications and attachments will NOT be drafted and posted to FBO until spring of 2011. Basic information pertaining to this project is as follows: The USDA Forest Service, Okanogan-Wenatchee National Forest has a requirement for the reconstruction of the Blackpine Lake Campground. Blackpine Lake Campground is located on the Methow Valley Ranger District on the Okanogan Wenatchee National Forest approximately 18 miles SW of Twisp, WA. The campground is accessed off the Twisp River County Road #9114 10 miles up the valley then on Forest Road #4300 for 8 miles up mountain terrain to an elevation of 4200 feet. The Forest Road is paved for the first 5 miles then turns into a winding single lane gravel surface for the last 3 miles. The campground is on the north shore of Blackpine Lake. There are two campground loops located above the lake and the third is a small tent-only camp area and day use picnic site near the lake shore. The overall campground has 20 campsites, I picnic area, a boat launch and 2 floating docks. Blackpine Lake is 20 acres in size and accommodates non-motorized boating. This contract will include items such as widening the existing upper road to a 24' subgrade for the first 360' then taper down to a 14 foot subgrade for the rest of the upper road system and constructing approximately 170' of new road (14' subgrade). Road will be surfaced with a 4" layer of compacted 1 " aggregate. Six new full width turnouts with varying lengths will be constructed. Eighteen of the existing camp spurs will be reconstructed to obtain a pad that is 14' wide by 25'-50' long (length will vary). There will be three new camp spurs installed and two existing ones will be obliterated. 300' of existing road to the boat launch will be widened by 1 foot to achieve a 15' subgrade and paved to the entrance of the new lower parking lot. From the new lower parking lot to the boat launch (approximately 150') road will be widened to 24' subgrade and paved. The lower parking lot will be enlarged to accommodate 15 vehicles and the surface will be paved. The two existing docks will be dismantled and removed and replaced with 2 new floating structures. 100' of new accessible trail will be constructed and the surface will be paved. A negotiated, firm-fixed price contract is contemplated requiring submission of both a technical and a price proposal during the spring of 2011. It is anticipated that the estimated construction range of magnitude for this project is over $100,000. It is anticipated that his project with be HubZone set aside. Reference attached Blackpine Conceptual Siteplan and meeting notes/pictures from the pre proposal meeting.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified SBE, VSBE, and DBE firms for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The scope of work is extensive, covering site preparation, utilities, paving, and electrical systems, including specialized tasks such as asbestos abatement, micro-tunneling, directional drilling, and the installation of various piping materials. The project is partially funded by multiple grants from the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD, necessitating strict adherence to DBE program requirements and the California Labor Code. Bidders must hold a valid California Contractor's license and provide acceptable insurance, with some subcontractors potentially required to provide bonding for 100 percent of their contract value. The project is subject to a Project Labor Agreement and prevailing wage rates, requiring firms performing onsite work to be signatory to collective bargaining agreements with specific trades including carpenters, laborers, and operating engineers. Interested firms must be certified through the Department of General Services and the Port of Long Beach PlanetBids portal. Invitations to bid and project specifications are managed electronically through the BuildingConnected system, with a response deadline of September 15, 2026.
Kiewit Infrastructure West Co.

POSTED

about 6 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS