Bleckley Co. TIA Brodhead Road Phase I, II, & III
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Bleckley County is soliciting bids for the TIA Brodhead Road Phase I, II, and III project, managed by engineer Andrew Johnson of Construction Materials Services, Inc. The project is divided into two primary sections separated by Longstreet Road. Part A involves 0.20 miles of resurfacing from GA SR 87 and 1.64 miles of grade, drain, base, and pave construction extending to Longstreet Road, utilizing a modified typical section. Part B consists of 1.53 miles of grading and GDBP construction from Longstreet Road to SR 112, adhering to the full design typical section. The solicitation, identified as PE-61200-NONST-2026-000000008, was posted on August 13, 2026, with a response deadline of September 4, 2026. The project is located in Georgia and is overseen by the Bleckley County Board of Commissioners. Interested parties may contact Freida Dykes for further information regarding this infrastructure improvement project.
General Info
Agency
NAICS
Place of Performance
GA, USASet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Broadhead Rd. (HG-Bleckley-001-003; GDOT PI #0018453, 0018454, 0018455) - Part A: This section of the project consists of 0.20 miles of resurfacing beginning at GA SR 87 (Station #00+30.00) and ending at Station #11+28.00 and 1.64 miles of GRADE, DRAIN, BASE, PAVE (GDBP) construction beginning on Brodhead Road at existing edge of pavement (Station #11+28.00) and ending at Longstreet Road (Station #98+20.00). This section will require the full Typical section minus 6¿ of special subgrade.
Broadhead Rd. (HG-Bleckley-001-003; GDOT PI #0018453, 0018454, 0018455) - Part B: This section of the project consists of 1.53 miles of grading and GDBP beginning at Longstreet Road (Station 98+40.00) and ending at SR 112 (Station #178+95.00). This section requires the full design Typical Section as shown on page C-1 of project plans.
Similar Contracts
Same NAICS industry code
