This Combined Synopsis/Solicitation opportunity from Department Of The Interior was posted on August 11, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Boardwalk Materials for Bear River NWR

Closed
140FGA25Q0022Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238120
New
International
Provision of Structural Repairs and Planned Maintenance to Blackpool Tower Winter 2026/7 and Summer 2027
Solicitation # ocds-h6vhtk-078f6c
Blackpool Borough Council is seeking a qualified Remedial Works Supplier to provide structural repairs and planned maintenance for Blackpool Tower, with an estimated total value of 4,000,000 GBP including VAT. The project is divided into three phases: a Winter Works package from November 2026 to March 2027 during operational closure, a Summer Works package from April 2027 to November 2027 during the operating season, and ongoing ad-hoc maintenance beyond November 2027 based on annual surveys. The initial period of performance runs from November 30, 2026, to November 29, 2027, with a possible one-year extension to November 29, 2028. The contract is an open competition with award criteria weighted at 50 percent Quality, 40 percent Price, and 10 percent Social Value. Mandatory requirements include IRATA level 3 qualified supervisors, IRATA level 1 or 2 technicians, and project managers who are Chartered Members of the Institution of Civil Engineers or Institution of Structural Engineers. Suppliers must maintain insurance coverage of 10 million GBP for Employer's Liability and Public Liability, and 5 million GBP for Professional Indemnity. All work must adhere to strict technical and safety standards, including BS EN 1090 Execution Class 3 for steel structures, CDM 2015, and the Work at Height Regulations 2005. The deadline for tender submissions is November 20, 2026.
Blackpool Borough Council

POSTED

about 9 hours ago

DEADLINE

in 22 days
NAICS: 238120
New
SLED
Corpyard Phase II Connex Structural Anchoring & Welding: (Rebid)
Solicitation # 26-091-ITB
The City of West Sacramento has issued solicitation 26-091-ITB for the Corpyard Phase II project, which requires the structural anchoring and welding of 14 existing shipping containers to a cement-treated asphalt surface. The scope of work includes container pre-checks, drilling and hole cleaning, the installation of Bolthold asphalt substrate, bolting down ASTMA36 plates using epoxied steel rods, and performing AWS welding to secure the plates to the container framing. To prevent corrosion, the contractor must apply a zinc-rich cold galvanizing rust-inhibiting coating. All work must be performed by a licensed contractor holding a current California C-51 or C-60 license and must adhere to PSE stamped drawings, structural calculations, and standards including ASCE 7-22, CBC 2022, and AISC 360-16. Final acceptance is contingent upon a successful inspection by the City's Building department. The estimated project value is 35,000 dollars, and the contract will be awarded to the lowest responsive and responsible bidder. Bids must be submitted electronically via the OpenGov portal by November 10, 2026, at 1:00 pm, and must include a bid security of at least 10 percent of the total bid price. The successful bidder is required to provide performance and payment bonds equal to 100 percent of the contract price and must comply with California prevailing wage requirements and DIR registration. Additionally, the contractor must utilize the Virtual Project Manager system for submittals and maintain comprehensive insurance coverage, including Commercial General Liability and Workers Compensation. As a federal-aid construction project, the contract mandates strict adherence to FHWA-1273 provisions, including nondiscrimination and equal employment opportunity policies.
Capital Projects - Construction

POSTED

about 14 hours ago

DEADLINE

in 13 days
NAICS: 238120
New
SLED
EVA DELL BARRIER ACCESS GATES
Solicitation # MS27-052
The City of Victorville is soliciting competitive bids under solicitation MS27-052 for the fabrication and installation of four steel barrier access gates at Eva Dell Park. The project requires a licensed C-13 contractor to provide all labor and materials to install one 31-foot gate, one 35-foot gate, and two 37-foot gates, all constructed from Schedule 40 steel pipe. The contract will be awarded to the lowest responsible bidder who attends the mandatory pre-bid meeting and site walk held on November 10, 2026. Final responses are due by December 3, 2026. As a project funded by the Community Development Block Grant (CDBG) program, strict compliance with the Davis-Bacon Act and California state prevailing wage laws is required, with the higher of the two rates applying. Contractors must submit weekly certified payroll reports using Form WH-347 and adhere to Build America, Buy America (BABA) provisions and California Air Resources Board regulations. Additionally, the successful bidder must divert at least 65 percent of non-hazardous construction and demolition debris from landfills. Financial security requirements include a bid guarantee of at least 10 percent of the total proposal amount, with the winning contractor required to provide Faithful Performance and Payment Bonds for 100 percent of the contract price. The contractor must also provide a guaranty bond covering defective materials or workmanship for twelve months following City acceptance. Compliance with the Americans with Disabilities Act (ADA) and various federal and state non-discrimination and affirmative action policies is mandatory.
City of Victorville

POSTED

about 18 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This contract pertains to the procurement of boardwalk materials for the Bear River National Wildlife Refuge, managed by the U.S. Fish and Wildlife Service under the Department of the Interior. It is a combined solicitation posted on June 17, 2025, with a response deadline of July 18, 2025, and is designated as a Total Small Business Set-Aside under the SBA, emphasizing opportunities for small businesses. The contract falls under NAICS code 238120, which covers carpentry and related construction activities, indicating that the project involves construction or installation work related to boardwalks at the refuge located in Brigham City, Utah. The contracting process is managed through the Federal Acquisition System, with the primary point of contact being Coleman Justine, who can be reached via email or phone for further inquiries. The contract aims to support infrastructure improvements at the refuge, and interested parties can find additional details and submit their responses through the provided online link. The overall scope and size of the contract are not specified, but the emphasis on small business participation highlights a focus on engaging small enterprises in federal procurement efforts.

General Info

Procurement of boardwalk materials for Bear River NWR, Utah; small businesses only; deadline July 18, 2025.

NAICS

238120 - Structural Steel and Precast Concrete Contractors

Place of Performance

2155 W Forest St, Brigham City, UT

Set-Aside

SBA

Documents

5

B08 Data Entry Form 140FGA25Q0022

PDF, High priority: read this firstsupporting-document
High

Bear River Migratory Bird Refuge - Boardwalks Construction Specifications

PDF, High priority: read this firstspecifications
High

Price Schedule - Bear River Migratory Bird Refuge (140FGA25Q0022)

PDF, High priority: read this firstspecifications
High

RFQ 140FGA25Q0022 - Boardwalk Piers

PDF, High priority: read this firstrfq
High

SOW - Bear River Migratory Bird Refuge Boardwalk Purchase (Project 23-001D)

PDF, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Gaoa Fws
Contacts1 person available
OfficeFalls Church, VA, 22041, USA
Office AddressFalls Church, VA, 22041, USA

Full Description

Show more
GAOA - Boardwalk Materials for Bear River NWR

More opportunities from Department Of The Interior → Gaoa Fws

Same awarding agency

NAICS: 238160
Federal
Standing Seam Metal Roof InstallationThe contract entails the supply and installation of a new standing seam metal roof system, complete with all necessary underlayment, flashing, fasteners, and accessories, all to be executed in strict compliance with the manufacturer’s specifications. This work is structured as a subcontract under NAICS code 238160 and is associated with the Department of the Interior, through its agency Gaoa Fws, with the solicitation posted on May 6, 2026. The project requires full adherence to technical standards for durability, weather resistance, and longevity, ensuring the roof system meets industry best practices and performance benchmarks. All materials and labor must align with the defined scope without deviation, and the installation must be performed by qualified personnel familiar with standing seam systems. The place of performance and specific location are not detailed in the provided data, nor are there details on the point of contact, set-aside status, or funding source. The contract is not linked to a specific solicitation number and lacks address information for the agency or performace site. Despite these gaps, the focus remains on delivering a high-quality, code-compliant metal roofing solution designed for long-term structural integrity and environmental resilience. Contractors must be prepared to meet all manufacturer requirements and assume responsibility for inspection, testing, and documentation to validate compliance throughout the installation process.
Roofing Contractors

POSTED

6 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS