This Solicitation opportunity from Colorado was posted on April 18, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Boat Ramp Shade Structure
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Delta County, Colorado, is soliciting proposals under contract 2024-RFP-17 for the design, purchase, and construction of a shade structure at a local boat ramp. The project requires a 20 by 16 foot structure with a height of 10 feet, utilizing I-beam construction without walls or a floor. Specific design requirements include the installation of metal below the purlins to deter bird nesting and the use of appropriate drip edge and facial metal. The county will supply the gravel for the base, while the contractor is responsible for the specific color scheme, which includes forest green vertical I-beams to match the roof and a white lid under the purlins. This solicitation was posted on April 18, 2024, with a response deadline of May 10, 2024.
General Info
Agency
Place of Performance
CO, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
The contract in question, numbered 2024-RFP-17, pertains to the installation of a shade structure at a boat ramp location in Delta County, Colorado, United States. The county is looking for proposals to purchase and design/build a shade structure with specific dimensions of 20' by 16' and a height of 10'. This structure will be constructed using I-beams and will not have walls or a floor. To prevent bird nesting, metal will be installed below the purlins, and proper drip edge/facial metal will be used. The county will provide gravel for the base. Additionally, there is a requirement for painting the vertical I-beams in forest green to match the roof color, while the lid under the purlins should be painted white.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
