Boggy Depot Dirt Work/Retention Wall-Lake Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Chickasaw Nation is seeking bids for dirt work and the construction of a retention wall along a lake at the Boggy Depot site to enhance safety for visitors and equipment by stabilizing the shoreline. The project involves reshaping the existing slope into a more gradual and secure incline through the placement of fill dirt supported by a retaining wall or equivalent structure. The scope of work is limited to approximately 140 feet of shoreline, with the goal of creating a durable, long-lasting barrier that prevents erosion and improves overall site integrity. All work must meet the standards required for public safety and environmental responsibility under the Chickasaw Nation’s oversight. The solicitation, numbered 27513, was posted on July 28, 2026, and responses are due by August 7, 2026, at 10:00 PM. This is a tribal procurement under the Chickasaw Nation’s procurement program, with no specific set-aside designation applied. Interested parties should direct all questions or request additional information to Chalin Vaughn or William Yochum via their official email addresses. The project is located at the Boggy Depot facility, and all work must be performed on-site as specified. Bids must be submitted through the Chickasaw Business Network portal, and failure to adhere to the deadline or submission requirements may result in disqualification.
General Info
Agency
NAICS
Place of Performance
Not specifiedSet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from Chickasaw Nation
Same awarding agency
